RB Inyokern Data Center
Inyokern, Kern County, California
RB Inyokern Data Center is a proposed data center in Inyokern, California (Kern County), operated by R&L Capital, Inc. The public record puts it at announced May 8, 2026, 99 MW planned, 55.54 acres, a reported $250 million investment. It has documented support and documented opposition on record.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Proposed
- Operator
- R&L Capital, Inc.
- Facility type
- Data center, AI use likely
- Location
- Inyokern, Kern County, CA
- Coordinates
- 35.6318, -117.8079 (approximate)
- Power capacity
- 99 MW planned
- Land
- 55.54 acres
- Investment
- $250 million
- Announced
- May 8, 2026
- Utility
- Southern California Edison (SCE)
- Power source
- Grid
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- Mixed reception
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- May 8, 2026ProposedR&L Capital, Inc. filed a Small Power Plant Exemption (SPPE) application with the California Energy Commission (Docket 26-SPPE-01) for a phased 30-35 MW to 65-70 MW to 99 MW backup-generation buildout. Source: California Energy Commission
Opposition and litigation at this site
Partly. Both documented support and documented opposition to RB Inyokern Data Center in Inyokern, Kern County, California appear in the record, with no clear majority position. Active opposition (Ridgecrest City Councilman Skip Gorman; the Indian Wells Valley groundwater basin is in critical overdraft, with water-use estimates ranging from the company's claim of 50 acre-ft/yr or less to opposition estimates of approximately 500 acre-ft/yr) alongside organized labor support - IBEW Local 47 and regional Building & Construction Trades Councils have filed CEC letters of support.
How the community has taken it
Reception is a sourced signal, not an editorial judgment: mixed reception means documented support and documented opposition both exist with no clear majority position on record.
Active opposition (Ridgecrest City Councilman Skip Gorman; the Indian Wells Valley groundwater basin is in critical overdraft, with water-use estimates ranging from the company's claim of 50 acre-ft/yr or less to opposition estimates of approximately 500 acre-ft/yr) alongside organized labor support - IBEW Local 47 and regional Building & Construction Trades Councils have filed CEC letters of support. Filed at 99 MW, just under the 100 MW threshold that would trigger a more rigorous CEC Application for Certification instead of the lighter SPPE exemption.
Power and water
Primary power via a 115 kV grid interconnection; the 99 MW SPPE docket capacity is diesel backup generation, not the grid draw.
Notes on the record
Unincorporated Kern County site south of West Inyokern Road (Hwy 178) and west of North Brown Road (APNs 084-010-43, -44, -45 portion; broader ~95-acre study area across 19 APNs). The CEC SPPE docket formally governs 40 diesel backup generator sets rated to 99 MW combined backup capacity, described by the CEC as not electrically interconnected to the transmission or distribution grid; primary power is a separate 115 kV interconnection to Southern California Edison. Proposer entities per the primary CEC filing: Intuva Inc. and Valley Wide Engineering & Construction, alongside applicant R&L Capital, Inc. (CEO Robbie Barker). Unconfirmed pending a direct read of the CEC Basis-of-Design filing: press claims of '6 modular data halls' and on-site canopy solar. Jobs figures are inconsistent across sources (30-60 permanent, 1,600 temporary construction, and a softer 530-total-including-indirect claim, all secondary/company-sourced) and are omitted from the structured jobs field for that reason. Investment (~$250M) is a company estimate reported by Tehachapi News, not seen in a primary filing. A Phase I cultural resources survey found no CRHR-eligible or tribal cultural resources (NAHC response negative, 2026-03-16). Distinct from the already-tracked Golden Valley Technology Hub (Beacon/CRC, Elk Hills) - different operator, site, capacity, and power model. Coordinates are an approximate road-intersection geocode near North Brown Road, not a parcel-confirmed point.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Questions people ask about this site
Is there opposition to the RB Inyokern Data Center in Inyokern?
Partly. Both documented support and documented opposition to RB Inyokern Data Center in Inyokern, Kern County, California appear in the record, with no clear majority position. Active opposition (Ridgecrest City Councilman Skip Gorman; the Indian Wells Valley groundwater basin is in critical overdraft, with water-use estimates ranging from the company's claim of 50 acre-ft/yr or less to opposition estimates of approximately 500 acre-ft/yr) alongside organized labor support - IBEW Local 47 and regional Building & Construction Trades Councils have filed CEC letters of support.
Has anyone filed a lawsuit over the RB Inyokern Data Center?
The reception note on this record refers to a court proceeding. Read it in full under opposition and litigation above, and check the sources at the foot of the page for the filing itself.
How much water does RB Inyokern Data Center use?
No water withdrawal figure for RB Inyokern Data Center is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates RB Inyokern Data Center, and how big is it?
R&L Capital, Inc. is the operator on record. Capacity on record is 99 MW. The site is recorded at 55.54 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "RB Inyokern Data Center," updated August 2, 2026, https://suedatacenters.org/data-centers/rb-inyokern-data-center-ca.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/rb-inyokern-data-center-ca, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.RB Inyokern Data Center - CEC backup generating system docket page · California Energy Commission · retrieved August 2, 2026
- 2.CEC Docket Log - 26-SPPE-01 · California Energy Commission · retrieved August 2, 2026
- 3.CEC filing TN 271058 - site/APN detail, SCE interconnection, phased capacity buildout · California Energy Commission · retrieved August 2, 2026
- 4.Data center proposed in Inyokern draws water, other concerns in East Kern · Tehachapi News · retrieved August 2, 2026
- 5.Say it isn't so: an AI data center is coming to downtown Inyokern · Roadrunner395 · retrieved August 2, 2026
- 6.Proposed Inyokern data center could use 12 to 16 million gallons of water annually · KGET 17 · retrieved August 2, 2026
- 7.AI Data Center Environmental Review: Proposed Inyokern Data Center Highlights Water-Use Concerns · Somach Law · retrieved August 2, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us