Sue Data Centers

Data Center Registry

Kyndryl Boulder Data Center (former IBM Boulder campus)

Boulder, Boulder County, Colorado · All 2 Kyndryl sites

OperatingNo reception on recordRecord updated October 19, 2026

Kyndryl Boulder Data Center (former IBM Boulder campus) is an operating data center in Boulder, Colorado (Boulder County), operated by Kyndryl. The public record puts it at 15 MW planned.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Operating

Operator
Kyndryl
Facility type
Data center
Location
6300 Diagonal Hwy, Boulder, Boulder County, CO, 80301
Coordinates
40.0890, -105.1977 (approximate)
Power capacity
6 MW operating; 15 MW planned
Land
Not established from a public source
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Not established from a public source
Cooling
Not established
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Reported by at least one credible outlet or filing

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. October 19, 2026
    Operating
    Listed as operational with future phases planned. Source: Baxtel

Opposition and litigation at this site

Nothing on record as of October 19, 2026. No lawsuit, organized opposition, or contested hearing over Kyndryl Boulder Data Center (former IBM Boulder campus) in Boulder, Boulder County, Colorado appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

Power and water

Outside-air economization for nearly half the year with a heat-exchanger mechanical design; cooling circuit type not stated.

Notes on the record

Enterprise data center carried over from IBM in the 2021 Kyndryl spin-off. About 115,000 sq ft building with about 70,000 sq ft of data center. Phase 1 is about 6 MW and the ultimate design is about 15 MW (third-party listing). Coordinates are for Building 1 on the shared campus.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
  • Which utility serves it
Which document closes each gap
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Tell us about your situation

Living near Kyndryl Boulder Data Center (former IBM Boulder campus)?

Tell us the basics. Where a participating attorney in your state is available, we may share your information with them with your consent. Free, no obligation, and no guarantee anyone will contact you.

Questions people ask about this site

Is there opposition to the Kyndryl Boulder Data Center (former IBM Boulder campus) in Boulder?

Nothing on record as of October 19, 2026. No lawsuit, organized opposition, or contested hearing over Kyndryl Boulder Data Center (former IBM Boulder campus) in Boulder, Boulder County, Colorado appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the Kyndryl Boulder Data Center (former IBM Boulder campus)?

No lawsuit over Kyndryl Boulder Data Center (former IBM Boulder campus) appears in the record we track as of October 19, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Kyndryl Boulder Data Center (former IBM Boulder campus) use?

No water withdrawal figure for Kyndryl Boulder Data Center (former IBM Boulder campus) is on record here. Cooling is recorded as unknown, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.

Who operates Kyndryl Boulder Data Center (former IBM Boulder campus), and how big is it?

Kyndryl is the operator on record. We hold 2 sites for that company across the registry. Capacity on record is 15 MW.

How to cite this page

SueDataCenters.org Data Center Registry, "Kyndryl Boulder Data Center (former IBM Boulder campus)," updated October 19, 2026, https://suedatacenters.org/data-centers/kyndryl-boulder-co.

Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/kyndryl-boulder-co, retrieved October 29, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Kyndryl: Boulder · Baxtel · retrieved October 19, 2026
  2. 2.OSM Nominatim geocode: Building 1, 6300 Diagonal Highway · OpenStreetMap · retrieved October 19, 2026

Is a data center disrupting your home?

Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.

  • Tell us about your situation
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us