Sue Data Centers

Data Center Registry

Skybox Santa Clara (1200 Memorex Drive)

Santa Clara, Santa Clara County, California · All 3 Skybox Datacenters sites

Under constructionNo reception on recordRecord updated September 29, 2026

Skybox Santa Clara (1200 Memorex Drive) is a data center under construction in Santa Clara, California (Santa Clara County), operated by Skybox Datacenters. The public record puts it at 60 MW planned.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Under construction

Operator
Skybox Datacenters
Facility type
Data center
Location
1200 Memorex Drive, Santa Clara, Santa Clara County, CA, 95050
Coordinates
37.3626, -121.9500
Power capacity
60 MW planned
Land
Not established from a public source
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Silicon Valley Power
Power source
Grid
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Reported by at least one credible outlet or filing

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. September 29, 2026
    Under construction
    Baxtel lists it as a new facility under construction with planned completion in 2026. Cleanview lists it as operating; the conflict is unresolved. Source: Baxtel

Opposition and litigation at this site

Nothing on record as of September 29, 2026. No lawsuit, organized opposition, or contested hearing over Skybox Santa Clara (1200 Memorex Drive) in Santa Clara, Santa Clara County, California appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

Power and water

Corgan: N+2 generator backup with 30 generators and 60 rooftop chillers.

Notes on the record

Site of the former Memorex headquarters. Four-story data center (472,920 sq ft) with a six-story ancillary office (87,520 sq ft), per Baxtel. Corgan states 60 MW critical load on an 11-acre site; Cleanview gives 9 acres. Operational status conflicts between sources.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
Which document closes each gap
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Free case review

Living near Skybox Santa Clara (1200 Memorex Drive)?

Tell us the basics and an independent attorney handling data center cases in your state will follow up. Free, and you are never obligated to hire anyone.

Questions people ask about this site

Is there opposition to the Skybox Santa Clara (1200 Memorex Drive) data center in Santa Clara?

Nothing on record as of September 29, 2026. No lawsuit, organized opposition, or contested hearing over Skybox Santa Clara (1200 Memorex Drive) in Santa Clara, Santa Clara County, California appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the Skybox Santa Clara (1200 Memorex Drive) data center?

No lawsuit over Skybox Santa Clara (1200 Memorex Drive) appears in the record we track as of September 29, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Skybox Santa Clara (1200 Memorex Drive) use?

No water withdrawal figure for Skybox Santa Clara (1200 Memorex Drive) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates Skybox Santa Clara (1200 Memorex Drive), and how big is it?

Skybox Datacenters is the operator on record. We hold 3 sites for that company across the registry. Capacity on record is 60 MW.

How to cite this page

SueDataCenters.org Data Center Registry, "Skybox Santa Clara (1200 Memorex Drive)," updated September 29, 2026, https://suedatacenters.org/data-centers/skybox-santa-clara-1200-memorex-drive-ca.

Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/skybox-santa-clara-1200-memorex-drive-ca, retrieved October 1, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Skybox Santa Clara Data Center project page · Corgan · retrieved September 29, 2026
  2. 2.Skybox Santa Clara Data Center · Baxtel · retrieved September 29, 2026
  3. 3.Skybox Santa Clara · Cleanview · retrieved September 29, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us