Project Kestrel

Kansas City, Platte County, Missouri

PermittedNo reception on recordRecord updated September 10, 2026

Project Kestrel is a permitted data center in Kansas City, Missouri (Platte County), operated by Shenandoah Computing LLC. The public record puts it at announced August 26, 2025, 379 acres.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Permitted

Operator
Shenandoah Computing LLC
Facility type
Data center
Location
Southwest corner of Missouri Highway 92 and N. Winan Avenue (KCI 29 Logistics Park), Kansas City, Platte County, MO
Coordinates
39.3471, -94.7039 (approximate)
Power capacity
Not established from a public source
Land
379 acres
Investment
Not established from a public source
Announced
August 26, 2025
Utility
Evergy
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Confirmed by multiple independent sources or official documentation

Opposition and litigation at this site

Nothing on record as of September 10, 2026. No lawsuit, organized opposition, or contested hearing over Project Kestrel in Kansas City, Platte County, Missouri appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

Power and water

Project commits to a minimum of 50% of all energy from carbon-free resources; development includes an on-site power substation.

Notes on the record

Six hyperscale data center buildings planned (up to 1.8M sq ft total) on ~379-430 acres within Hunt Midwest KCI 29 Logistics Park, Platte County. Distinct from Google Project Mica (google-project-mica-kc-northland-mo), a separate campus ~9km east in Clay County. OPERATOR ATTRIBUTION, checked 2026-09-10: the fetched sources name the developer only as Shenandoah Computing LLC. KSHB names Shenandoah as the applicant and mentions Google solely in a context sentence about campuses ALREADY under construction in the Northland; Port KC does not mention Shenandoah at all. No fetched source ties Shenandoah to Google or any named hyperscaler, so no end-tenant is recorded here. An aggregator listing attributes this to Google; this dataset has previously found that aggregator wrong about an operator, so it is not relied on. INVESTMENT, checked 2026-09-10: the $100B figure is the ceiling of a conduit bond series Shenandoah asked Port KC to authorize (KSHB: "a series of conduit bonds that could reach $100 billion"), NOT a stated project investment, so no investmentUsd is recorded. Port KC approved a Chapter 100-style industrial development plan on 2025-08-28 with a 35-year real/personal property tax exemption and sales-tax relief on construction materials; no single abatement dollar total was stated, only projected net new tax revenue of ~$110M across all phases, so no structured subsidies entry is recorded. Local press (fox4kc, 2025-11) reports Platte County’s presiding commissioner publicly opposed the tax-break package; that page 403’d and archive.org was rate-limiting at retrieval, so this is an unverified lead for a future refresh, not a sourced community finding. Phase 1 was slated to begin 2026; not confirmed started.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Power capacity in megawatts
  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • How the community has received it
Which document closes each gap
Power capacity in megawatts
The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Questions people ask about this site

Is there opposition to the Project Kestrel data center in Kansas City?

Nothing on record as of September 10, 2026. No lawsuit, organized opposition, or contested hearing over Project Kestrel in Kansas City, Platte County, Missouri appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the Project Kestrel data center?

No lawsuit over Project Kestrel appears in the record we track as of September 10, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Project Kestrel use?

No water withdrawal figure for Project Kestrel is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates Project Kestrel, and how big is it?

Shenandoah Computing LLC is the operator on record. No capacity figure is on record for this site. The site is recorded at 379 acres.

How to cite this page

SueDataCenters.org Data Center Registry, "Project Kestrel," updated September 10, 2026, https://suedatacenters.org/data-centers/shenandoah-project-kestrel-kc-northland-mo.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/shenandoah-project-kestrel-kc-northland-mo, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Tech firm eyes development for 6 data centers north of Kansas City International Airport · KSHB · retrieved September 10, 2026
  2. 2.$100 Billion Data Center Development to bring Infrastructure, Investment and Jobs to the Northland · Port KC · retrieved September 10, 2026
  3. 3.Project Kestrel Data Center · Baxtel · retrieved September 10, 2026
  4. 4.KCI 29 Logistics Park (OpenStreetMap) · OpenStreetMap contributors · retrieved September 10, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us