Meta Kansas City Northland is an operating data center in Kansas City, Missouri (Clay County), operated by Meta. The public record puts it at announced March 2022, 750 MW planned, 882 acres, a reported $1 billion investment. It has documented public support and no documented opposition.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- Meta
- Facility type
- Data center, AI use mixed
- Location
- Northwest corner of I-435 and US Highway 169, Kansas City, MO, Kansas City, Clay County, MO
- Coordinates
- 39.2470, -94.7050
- Power capacity
- 750 MW planned
- Land
- 882 acres
- Investment
- $1 billion
- Announced
- March 2022
- Utility
- Evergy
- Power source
- Mixed
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- 100 permanent; 1,500 construction
- Public subsidy
- Chapter 100 industrial development bonds / PILOT, authorization ceiling $8.2B (a financing authorization, NOT an abatement value; the abatement is the PILOT relief the leaseback structure creates, which the cited sources do not itemize), Kansas City, MO, 2021
- Community reception
- Supported
- Source confidence
- Confirmed by multiple independent sources or official documentation
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- August 2025OperatingData center officially opens August 20, 2025; servers live and serving traffic Source: Meta Platforms
- March 2022ProposedMeta announces $800M+ data center campus at Golden Plains Technology Park (801 NW 128th St), northwest corner of I-435 and US-169 in KC Northland Source: Meta Platforms
- 2022Under constructionConstruction begins; averaged 1,500 skilled trade workers at peak
Opposition and litigation at this site
Not that we can document. Local officials or residents have expressed public support for Meta Kansas City Northland in Kansas City, Clay County, Missouri, and no opposition, petition, or lawsuit appears in the sources this registry tracks as of September 10, 2026. Meta directed more than $1M to local schools and nonprofits since 2022; no reported community opposition; LEED Gold certified campus
How the community has taken it
Reception is a sourced signal, not an editorial judgment: supported means local officials or residents have expressed public support and no opposition is documented.
Meta directed more than $1M to local schools and nonprofits since 2022; no reported community opposition; LEED Gold certified campus
Power and water
100% electricity matched with renewable energy; LEED Gold certified; stormwater reuse saved 1M+ gallons of potable water during construction
Public money on the record
| Program | Amount | Granted by | Year |
|---|---|---|---|
| Chapter 100 industrial development bonds / PILOT, authorization ceiling $8.2B (a financing authorization, NOT an abatement value; the abatement is the PILOT relief the leaseback structure creates, which the cited sources do not itemize) | Not established | Kansas City, MO | 2021 |
Notes on the record
Located at Golden Plains Technology Park (Diode Ventures development), 801 NW 128th Street, at the northwest corner of I-435 and US-169. Three data center buildings + warehouse, 1.4M sq ft total. Meta's first Missouri data center. Coordinates are approximate for the Golden Plains Technology Park area.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Our reporting on this site
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Google Project Mica · Kansas City · Google3 mi · Under construction · 500 MW
- Lambda Kansas City AI Supercomputer · Kansas City · Lambda6 mi · Under construction · 100 MW
- Project Kestrel · Kansas City · Shenandoah Computing LLC7 mi · Permitted
- Project Yardbird · Kansas City · PowerTransitions8 mi · Proposed · 200 MW
- Patmos KC Star Building Campus · Kansas City · Patmos Hosting12 mi · Operating · 35 MW
- Project Red Wolf · Kansas City · Red Wolf DCD Properties LLC12 mi · Proposed · 600 MW · In litigation
- Metrobloks Liberty Campus · Liberty · Metrobloks15 mi · Proposed · 150 MW · Mixed reception
- TierPoint Kansas City - Lenexa · Lenexa · TierPoint21 mi · Operating
Questions people ask about this site
Is there opposition to the Meta Kansas City Northland data center in Kansas City?
Not that we can document. Local officials or residents have expressed public support for Meta Kansas City Northland in Kansas City, Clay County, Missouri, and no opposition, petition, or lawsuit appears in the sources this registry tracks as of September 10, 2026. Meta directed more than $1M to local schools and nonprofits since 2022; no reported community opposition; LEED Gold certified campus
Has anyone filed a lawsuit over the Meta Kansas City Northland data center?
No lawsuit over Meta Kansas City Northland appears in the record we track as of September 10, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Meta Kansas City Northland use?
No water withdrawal figure for Meta Kansas City Northland is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Meta Kansas City Northland, and how big is it?
Meta is the operator on record. We hold 28 sites for that company across the registry. Capacity on record is 750 MW. The site is recorded at 882 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "Meta Kansas City Northland," updated September 10, 2026, https://suedatacenters.org/data-centers/meta-kansas-city-northland-mo.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/meta-kansas-city-northland-mo, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Meta's Kansas City Data Center and Upcoming AI-Optimized Data Centers · Meta Platforms · retrieved July 6, 2026
- 2.Meta opens $1 billion Kansas City data center · KCUR · retrieved July 6, 2026
- 3.Golden Plains Technology Park - Diode Ventures · Diode Ventures · retrieved September 10, 2026
- 4.Golden Plains Technology Park is Online - Diode Ventures · Diode Ventures · retrieved September 10, 2026
- 5.Kansas City Ordinance 210841 - Golden Plains Technology Park Zone 3 preliminary plat · Kansas City, MO City Clerk · retrieved September 10, 2026
- 6.KC Council sets stage for $8.2 billion in Golden Plains Tech Park incentives · Ingram's · retrieved September 10, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us