Data Center Registry
Microsoft Fairwater Atlanta (Azure AI Superfactory)
Fayetteville, Fayette County, Georgia · All 45 Microsoft sites · Every Microsoft case on our tracker
Microsoft Fairwater Atlanta (Azure AI Superfactory) is an operating data center in Fayetteville, Georgia (Fayette County), operated by Microsoft. The public record puts it at announced 2025, 1.5 GW planned, 615 acres. It is the subject of active public debate, with hearings, petitions, or organized opposition on record.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- Microsoft
- Facility type
- Data center, AI use confirmed
- Location
- Fayetteville, Fayette County, GA
- Coordinates
- 33.4487, -84.4549
- Power capacity
- 1.5 GW planned
- Land
- 615 acres
- Investment
- Not established from a public source
- Announced
- 2025
- Utility
- Georgia Power
- Power source
- Grid
- Cooling
- Closed loop
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Fayette County Development Authority 10-year stepped property-tax abatement (0% yr 1 -> 100% yr 10, +10%/yr) on the QTS 'Project Excalibur' campus; also qualifies for Georgia's statewide data-center sales-and-use tax exemption, Fayette County, GA, 2023
- Community reception
- Contested
- Source confidence
- Confirmed by multiple independent sources or official documentation
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- October 2025OperatingMicrosoft's Atlanta Fairwater AI datacenter began operation in October 2025, the second in the Fairwater family; two-story, no UPS/gensets Source: Microsoft
Opposition and litigation at this site
Yes. Microsoft Fairwater Atlanta (Azure AI Superfactory) in Fayetteville, Fayette County, Georgia is contested. Hearings, public comment, petitions, or organized opposition are on record. Fayetteville adopted a 90-day moratorium (Jan 29 2026) then unanimously passed Ordinance 26-O-12 (March 5 2026) banning new data centers in all zoning districts; existing Fairwater 1/2 and the Dec 2025 East Campus rezoning are grandfathered.
How the community has taken it
Reception is a sourced signal, not an editorial judgment: contested means active public debate is on record, with hearings, petitions, or organized opposition, without litigation.
Fayetteville adopted a 90-day moratorium (Jan 29 2026) then unanimously passed Ordinance 26-O-12 (March 5 2026) banning new data centers in all zoning districts; existing Fairwater 1/2 and the Dec 2025 East Campus rezoning are grandfathered. Opposition centered on construction traffic, the ~29M-gal unmetered water draw, and new 500 kV transmission lines; Mayor Edward Johnson expressed support. A competing Crow Holdings proposal withdrew its appeal after the ban. No litigation against the Fairwater campus.
Power and water
Two-story design with no UPS or backup generators (DCD, Oct 2025), no on-site generation. Microsoft states Fairwater uses improved closed-loop cooling that 'consumes almost zero water in its operation.' Georgia Power 2025 IRP testimony cites the QTS Fayetteville campus as a single load of just under 1,500 MW at full build-out.
QTS closed-loop 'water-free' design (COO Ryan Hunter: 'Once the water's in there, it stays in there for the life of the asset'); ~600,000-gal one-time fill per building, ongoing per-building use 'equivalent to four American households per month.' During construction the campus drew ~29-30M gallons through two unmetered connections (2024-25); Fayette County issued a ~$147,000 retroactive charge and no fine. No operational daily figure for the Microsoft tenant space specifically.
Public money on the record
| Program | Amount | Granted by | Year |
|---|---|---|---|
| Fayette County Development Authority 10-year stepped property-tax abatement (0% yr 1 -> 100% yr 10, +10%/yr) on the QTS 'Project Excalibur' campus; also qualifies for Georgia's statewide data-center sales-and-use tax exemption | Not established | Fayette County, GA | 2023 |
Notes on the record
615-acre, up-to-13-building QTS-built campus on Hwy 54W near Fayetteville, Fayette County (Microsoft's materials say 'Atlanta'). Began operation Oct 2025 as Fairwater 2, a 'multi-gigawatt' AI campus. ~1,500 MW is the anticipated ultimate Georgia Power load across all buildings (planned figure; ~433 MW cited as initially online). Distinct from Microsoft's smaller Tyrone, GA campus. Two-story design with no UPS or backup generators. Coordinates are the Fayetteville area centroid. Microsoft has not disclosed tenant capex for the Fairwater Fayetteville space; the ~$1B/$6.5B figures are QTS developer build-out estimates for the full multi-tenant campus, and the widely-cited $14.5M abatement / $1.8B / $75M figures attach to different Microsoft/Fulton-County sites (the $75M was FCDA land-sale proceeds, not a subsidy to QTS) -> investmentUsd omitted.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Permanent jobs promised
Which document closes each gap
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Lovejoy Data Center Campus (Stillwater Development) · Lovejoy · Stillwater Development6 mi · Cancelled · 1.3 GW · Opposed
- Microsoft Tyrone Campus (Project Rita) · Tyrone · Microsoft8 mi · Permitted · 96 MW · Contested
- Project Peach (CyrusOne Palmetto Data Center Campus) · Palmetto · CyrusOne (joint venture with North Coweta Investors)13 mi · Permitted · Opposed
- CleanSpark College Park Bitcoin Mining Facility · College Park · CleanSpark, Inc.13 mi · Operating · 50 MW
- Vantage Data Centers Westlake · South Fulton · Vantage Data Centers14 mi · Proposed
- TA Realty East Tanners Church Road Data Center · Ellenwood · TA Realty15 mi · Permitted · 180 MW
- Project Oak Data Center (Walt Sanders Road) · Newnan · Undisclosed developer16 mi · Cancelled · Opposed
- T5 @ Atlanta IV · Palmetto · T5 Data Centers17 mi · Proposed · 300 MW
Questions people ask about this site
Is there opposition to the Microsoft Fairwater Atlanta (Azure AI Superfactory) data center in Fayetteville?
Yes. Microsoft Fairwater Atlanta (Azure AI Superfactory) in Fayetteville, Fayette County, Georgia is contested. Hearings, public comment, petitions, or organized opposition are on record. Fayetteville adopted a 90-day moratorium (Jan 29 2026) then unanimously passed Ordinance 26-O-12 (March 5 2026) banning new data centers in all zoning districts; existing Fairwater 1/2 and the Dec 2025 East Campus rezoning are grandfathered.
Has anyone filed a lawsuit over the Microsoft Fairwater Atlanta (Azure AI Superfactory) data center?
The reception note on this record refers to a court proceeding. Read it in full under opposition and litigation above, and check the sources at the foot of the page for the filing itself.
How much water does Microsoft Fairwater Atlanta (Azure AI Superfactory) use?
No water withdrawal figure for Microsoft Fairwater Atlanta (Azure AI Superfactory) is on record here. Cooling is recorded as closed_loop, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.
Who operates Microsoft Fairwater Atlanta (Azure AI Superfactory), and how big is it?
Microsoft is the operator on record. We hold 45 sites for that company across the registry. Capacity on record is 1.5 GW. The site is recorded at 615 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "Microsoft Fairwater Atlanta (Azure AI Superfactory)," updated July 26, 2026, https://suedatacenters.org/data-centers/microsoft-fairwater-fayetteville-ga.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/microsoft-fairwater-fayetteville-ga, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.From Wisconsin to Atlanta, Microsoft connects datacenters to build its first AI superfactory · Microsoft · retrieved July 7, 2026
- 2.Microsoft launches Atlanta Fairwater data center, two stories, no UPS or gen sets · Data Center Dynamics · retrieved July 7, 2026
- 3.Microsoft debuts AI 'superfactory' data center south of Atlanta · The Atlanta Journal-Constitution · retrieved July 8, 2026
- 4.Behind Fayette's QTS water controversy: a missed meter, 8,000 workers · The Citizen · retrieved July 8, 2026
- 5.Microsoft Fairwater Atlanta: a grid-only gigawatt AI data center · Measured AI · retrieved July 8, 2026
- 6.Georgia data center boom: what it's like to have one in your community · WBRC · retrieved July 8, 2026
- 7.Incentives & tax rates · Fayette County Development Authority · retrieved July 8, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us