Lovejoy Data Center Campus (Stillwater Development)
Lovejoy, Clayton County, Georgia
Lovejoy Data Center Campus (Stillwater Development) is a cancelled data center in Lovejoy, Georgia (Clayton County), operated by Stillwater Development. The public record puts it at 1.3 GW planned. It faces documented, organized local opposition.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Cancelled
- Operator
- Stillwater Development
- Facility type
- Data center
- Location
- 11760 Panhandle Road, Lovejoy, Clayton County, GA
- Coordinates
- 33.4517, -84.3436 (approximate)
- Power capacity
- 1.3 GW planned
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- Opposed
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- August 6, 2026CancelledThe proposal was formally withdrawn at a Lovejoy city council meeting; the mayor indicated the developers intend to pursue residential development for the site instead. Source: Atlanta News First
- December 2025ProposedStillwater Development filed plans for a 3.5 million sq ft, 15-building campus at 11760 Panhandle Road in Lovejoy. Source: Atlanta News First
Opposition and litigation at this site
Yes. Organized local opposition to Lovejoy Data Center Campus (Stillwater Development) in Lovejoy, Clayton County, Georgia is documented in the public record, without a lawsuit on file in the sources we track. Opposition centred on proximity to Michelle Obama STEM Elementary Academy, Eddie White Middle School and New Hope Methodist Church, and on Panhandle Road school traffic cited in the city's own DRI comments.
How the community has taken it
Reception is a sourced signal, not an editorial judgment: opposed means documented, organized local opposition is the dominant signal on record.
Opposition centred on proximity to Michelle Obama STEM Elementary Academy, Eddie White Middle School and New Hope Methodist Church, and on Panhandle Road school traffic cited in the city's own DRI comments.
Notes on the record
Fifteen buildings totalling 3.5 million sq ft with 1.25 GW at full build-out, reviewed through the Developments of Regional Impact process before withdrawal. Coordinates come from the geocoded Panhandle Road address and are approximate.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- Which utility serves it
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Microsoft Fairwater Atlanta (Azure AI Superfactory) · Fayetteville · Microsoft6 mi · Operating · 1.5 GW · Contested
- TA Realty East Tanners Church Road Data Center · Ellenwood · TA Realty11 mi · Permitted · 180 MW
- CleanSpark College Park Bitcoin Mining Facility · College Park · CleanSpark, Inc.14 mi · Operating · 50 MW
- Microsoft Tyrone Campus (Project Rita) · Tyrone · Microsoft14 mi · Permitted · 96 MW · Contested
- High Falls Road Data Center Campus (Montana Property Group) · Griffin · Montana Property Group LLC (developer; end user undisclosed)15 mi · Permitted
- Spalding Investments Data Center Campus (High Falls Road) · Griffin · Spalding Investments, LLC (developer; end user undisclosed)15 mi · Permitted
- Wallace Jackson Data Center Campus · Griffin · Wallace Jackson, LLC (developer; end user undisclosed)15 mi · Permitted · In litigation
- Vantage Data Centers Westlake · South Fulton · Vantage Data Centers18 mi · Proposed
Questions people ask about this site
Is there opposition to the Lovejoy Data Center Campus (Stillwater Development) in Lovejoy?
Yes. Organized local opposition to Lovejoy Data Center Campus (Stillwater Development) in Lovejoy, Clayton County, Georgia is documented in the public record, without a lawsuit on file in the sources we track. Opposition centred on proximity to Michelle Obama STEM Elementary Academy, Eddie White Middle School and New Hope Methodist Church, and on Panhandle Road school traffic cited in the city's own DRI comments.
Has anyone filed a lawsuit over the Lovejoy Data Center Campus (Stillwater Development)?
No lawsuit over Lovejoy Data Center Campus (Stillwater Development) appears in the record we track as of September 10, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Lovejoy Data Center Campus (Stillwater Development) use?
No water withdrawal figure for Lovejoy Data Center Campus (Stillwater Development) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Lovejoy Data Center Campus (Stillwater Development), and how big is it?
Stillwater Development is the operator on record. Capacity on record is 1.3 GW.
How to cite this page
SueDataCenters.org Data Center Registry, "Lovejoy Data Center Campus (Stillwater Development)," updated September 10, 2026, https://suedatacenters.org/data-centers/stillwater-lovejoy-panhandle-road-clayton-ga.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/stillwater-lovejoy-panhandle-road-clayton-ga, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Proposal for Clayton County data center withdrawn · Atlanta News First · retrieved September 10, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us