Data Canopy Newark (350 Pencader Drive)
Newark, New Castle County, Delaware
Data Canopy Newark (350 Pencader Drive) is an operating data center in Newark, Delaware (New Castle County), operated by Data Canopy. The public record puts it at 6 MW operating.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- Data Canopy
- Facility type
- Data center
- Location
- 350 Pencader Drive, Newark, New Castle County, DE, 19702
- Coordinates
- 39.6120, -75.7603 (approximate)
- Power capacity
- 6 MW operating
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Confirmed by multiple independent sources or official documentation
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- July 2023OperatingBaxtel reports Data Canopy acquired Ntirety's colocation business, which included this Newark facility, in July 2023. Source: Baxtel
Opposition and litigation at this site
Nothing on record as of October 1, 2026. No lawsuit, organized opposition, or contested hearing over Data Canopy Newark (350 Pencader Drive) in Newark, New Castle County, Delaware appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
Colocation and managed-hosting facility. The operator lists 6 MW building power capacity, 16,085 sq ft of white space and 3 utility feeds. Backup is Generac generators with 7,000 gallons of diesel on site, and cooling is a DX system with 30+ CRAC units. The 6 MW is operator-stated building power, not a measured IT load. water.the cooling type is left unset because the DX heat-rejection path is not described. Coordinates are a US Census geocode of the street address.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- STAR Campus Data Center & Cogeneration Plant (The Data Centers, LLC) · Newark · The Data Centers, LLC4 mi · Cancelled · Opposed
- White Clay Corporate Center Data Center Redevelopment · Newark · Shelbourne5 mi · Proposed · Contested
- JPMorgan Chase Core Data Center 1 (CDC1), Bear · Bear · JPMorgan Chase Bank, N.A.6 mi · Operating
- St. Georges Business Park & Lighthouse Farms · St. Georges · Parkway Gravel Inc.7 mi · Proposed · 300 MW · Contested
- Project Washington (Starwood Digital Ventures) · Delaware City · Starwood Digital Ventures9 mi · Proposed · 1.2 GW · In litigation
- DāSTOR New Castle (3 Boulden Circle) · New Castle · DāSTOR LLC11 mi · Operating · 8 MW
- Middletown Technology Center (Cirrus Delaware LLC) · Middletown · Cirrus Delaware, LLC11 mi · Proposed · 40 MW
- State of Delaware Biggs Data Center (DTI) · New Castle · Delaware Department of Technology and Information12 mi · Operating
Questions people ask about this site
Is there opposition to the Data Canopy Newark (350 Pencader Drive) data center in Newark?
Nothing on record as of October 1, 2026. No lawsuit, organized opposition, or contested hearing over Data Canopy Newark (350 Pencader Drive) in Newark, New Castle County, Delaware appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Data Canopy Newark (350 Pencader Drive) data center?
No lawsuit over Data Canopy Newark (350 Pencader Drive) appears in the record we track as of October 1, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Data Canopy Newark (350 Pencader Drive) use?
No water withdrawal figure for Data Canopy Newark (350 Pencader Drive) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Data Canopy Newark (350 Pencader Drive), and how big is it?
Data Canopy is the operator on record. Capacity on record is 6 MW.
How to cite this page
SueDataCenters.org Data Center Registry, "Data Canopy Newark (350 Pencader Drive)," updated October 1, 2026, https://suedatacenters.org/data-centers/data-canopy-newark-pencader-de.
Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/data-canopy-newark-pencader-de, retrieved October 11, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Newark, DE data center: 350 Pencader Dr., 6MW building power capacity, 16,085 sq ft white space · Data Canopy · retrieved October 1, 2026
- 2.See where Starwood Digital Holdings is planning its Delaware data center, and where others are already running · Technical.ly · retrieved October 1, 2026
- 3.DataCanopy: Newark data center (350 Pencader Dr; Ntirety colocation business acquired July 2023) · Baxtel · retrieved October 1, 2026
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us