Sequoia Data Center (2600 De La Cruz Boulevard)
Santa Clara, Santa Clara County, California · Every CyrusOne case on our tracker
Sequoia Data Center (2600 De La Cruz Boulevard) is a permitted data center in Santa Clara, California (Santa Clara County), operated by Tishman Speyer (site acquired from CyrusOne, July 2026). The public record puts it at announced August 2019, 67.5 MW planned, 15 acres.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Permitted
- Operator
- Tishman Speyer (site acquired from CyrusOne, July 2026)
- Facility type
- Data center
- Location
- 2600 De La Cruz Boulevard, Santa Clara, Santa Clara County, CA, 95050
- Coordinates
- 37.3795, -121.9395 (approximate)
- Power capacity
- 67.5 MW planned
- Land
- 15 acres
- Investment
- Not established from a public source
- Announced
- August 2019
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- July 29, 2026PermittedCyrusOne sold the entitled 15.2-acre site (and an adjacent 8.4-acre parcel at 2750 De La Cruz) to a Tishman Speyer affiliate for $65.4M; whether Tishman Speyer will submit a revised proposal is not yet known. Source: The Real Deal
- June 25, 2021PermittedCEC granted a Small Power Plant Exemption for the 96.5 MW Sequoia Backup Generating Facility (54 diesel generators) supporting a four-story ~702,114 sq ft data center on a 15-acre site; Santa Clara approved the project in 2021. Source: California Energy Commission
Opposition and litigation at this site
Nothing on record as of November 5, 2026. No lawsuit, organized opposition, or contested hearing over Sequoia Data Center (2600 De La Cruz Boulevard) in Santa Clara, Santa Clara County, California appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
Pre-construction code name 'Sequoia' (CyrusOne via CI-Santa Clara LLC). Entitlement: ~703,000 sq ft, 96.5 MW backup generation. Land traded to Tishman Speyer in July 2026 ($42.4M for 2600 De La Cruz, $23M for 2750 De La Cruz); current development plan unconfirmed, hence the record is marked reported.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- How the community has received it
- Which utility serves it
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Goodman Innovation Centre San Jose (NorthTown Data Center) · San Jose · Goodman Groupunder 1 mile · Proposed · 97.3 MW
- Microsoft San Jose Data Center Campus (SJ04) · San Jose · Microsoftunder 1 mile · Proposed · 97.8 MW
- Digital Realty Silicon Valley SJC11 · Santa Clara · Digital Realtyunder 1 mile · Operating
- Connect Data Centers Santa Clara (715 Comstock Street) · Santa Clara · Connect Data Centers (Oppidan / Harrison Street Real Estate Capital JV)under 1 mile · Proposed
- Digital Realty SJC36 (Lafayette Data Center, 2825 Lafayette Street) · Santa Clara · Digital Realtyunder 1 mile · Permitted · 66 MW
- Digital Realty Silicon Valley SJC31 · Santa Clara · Digital Realtyunder 1 mile · Operating
- Lumen Santa Clara 1 · Santa Clara · Lumen Technologiesunder 1 mile · Operating
- Digital Realty SJC37 (641 Walsh Avenue) · Santa Clara · Digital Realtyunder 1 mile · Operating
Questions people ask about this site
Is there opposition to the Sequoia Data Center (2600 De La Cruz Boulevard) in Santa Clara?
Nothing on record as of November 5, 2026. No lawsuit, organized opposition, or contested hearing over Sequoia Data Center (2600 De La Cruz Boulevard) in Santa Clara, Santa Clara County, California appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Sequoia Data Center (2600 De La Cruz Boulevard)?
No lawsuit over Sequoia Data Center (2600 De La Cruz Boulevard) appears in the record we track as of November 5, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Sequoia Data Center (2600 De La Cruz Boulevard) use?
No water withdrawal figure for Sequoia Data Center (2600 De La Cruz Boulevard) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Sequoia Data Center (2600 De La Cruz Boulevard), and how big is it?
Tishman Speyer (site acquired from CyrusOne, July 2026) is the operator on record. Capacity on record is 67.5 MW. The site is recorded at 15 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "Sequoia Data Center (2600 De La Cruz Boulevard)," updated November 5, 2026, https://suedatacenters.org/data-centers/sequoia-data-center-2600-de-la-cruz-santa-clara-ca.
Facility data from Compute Atlas (E. Kubiak), version 1.35.1 (November 2, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/sequoia-data-center-2600-de-la-cruz-santa-clara-ca, retrieved November 5, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.California Energy Commission, Sequoia Data Center (19-SPPE-03), Small Power Plant Exemption · California Energy Commission · retrieved September 21, 2026 · original offline, archived copy from October 12, 2026
- 2.Tishman Speyer grabs Santa Clara land entitled for data center for $65M (2026-07-29) · The Real Deal · retrieved September 21, 2026
- 3.CEQAnet SCH 2020010384: Sequoia Data Center (CEC 19-SPPE-03), designed to provide 67.5 MW of critical IT power; 96.5 MW maximum electrical load · California Energy Commission via CEQAnet · retrieved November 5, 2026
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us