Microsoft San Jose Data Center Campus (SJ04)
San Jose, Santa Clara County, California · All 50 Microsoft sites · Every Microsoft case on our tracker
Microsoft San Jose Data Center Campus (SJ04) is a proposed data center in San Jose, California (Santa Clara County), operated by Microsoft. The public record puts it at 97.8 MW planned, 22.29 acres.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Proposed
- Operator
- Microsoft
- Facility type
- Data center
- Location
- 2515 Orchard Parkway, San Jose, Santa Clara County, CA, 95131
- Coordinates
- 37.3796, -121.9308 (approximate)
- Power capacity
- 97.8 MW planned
- Land
- 22.29 acres
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Pacific Gas and Electric Company
- Power source
- Grid
- On site generation
- 97.8 MW
- Cooling
- Closed loop
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Confirmed by multiple independent sources or official documentation
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- February 9, 2023ProposedCalifornia Energy Commission issued a Notice of Preparation of a Draft EIR for the two-building campus at Orchard Parkway and Component Drive. Source: California Governor's Office of Land Use and Climate Innovation (CEQAnet)
Opposition and litigation at this site
Nothing on record as of September 21, 2026. No lawsuit, organized opposition, or contested hearing over Microsoft San Jose Data Center Campus (SJ04) in San Jose, Santa Clara County, California appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
CEQA Notice of Preparation describes 37 diesel-fired backup generators totalling 97.8 MW, 32 primary 3-MW units, two 0.5-MW administrative units and two 0.8-MW storage-area units, plus an on-site substation and switchyard. PG&E has determined that reconductoring roughly 12 miles of existing transmission line would be needed to serve the project.
Notes on the record
Distinct from the Microsoft Alviso campus already tracked: separate parcel (APNs 101-02-019 and 101-02-020 at 2515 Orchard Parkway, about 4 km from 1657 Alviso-Milpitas Road) and a separate CEC docket (22-SPPE-02 vs 19-SPPE-04). Still under CEC review as of the July 2025 fourth revised project description.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Tax abatements or other public subsidy
- Permanent jobs promised
- How the community has received it
Which document closes each gap
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Goodman Innovation Centre San Jose (NorthTown Data Center) · San Jose · Goodman Groupunder 1 mile · Proposed · 97.3 MW
- Terra Data Center · San Jose · Terra Venturesunder 1 mile · Proposed
- Sequoia Data Center (2600 De La Cruz Boulevard) · Santa Clara · Tishman Speyer (site acquired from CyrusOne, July 2026)under 1 mile · Permitted
- Prologis 326 Charcot Avenue Data Center (North San José) · San Jose · Prologisunder 1 mile · Proposed · 99 MW
- Digital Realty SJC36 (Lafayette Data Center, 2825 Lafayette Street) · Santa Clara · Digital Realtyunder 1 mile · Permitted · 66 MW
- Digital Realty Silicon Valley SJC11 · Santa Clara · Digital Realty1 mi · Operating
- Digital Realty SJC37 (641 Walsh Avenue) · Santa Clara · Digital Realty1 mi · Operating
- Digital Realty Silicon Valley SJC31 · Santa Clara · Digital Realty1 mi · Operating
Questions people ask about this site
Is there opposition to the Microsoft San Jose Data Center Campus (SJ04) in San Jose?
Nothing on record as of September 21, 2026. No lawsuit, organized opposition, or contested hearing over Microsoft San Jose Data Center Campus (SJ04) in San Jose, Santa Clara County, California appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Microsoft San Jose Data Center Campus (SJ04)?
No lawsuit over Microsoft San Jose Data Center Campus (SJ04) appears in the record we track as of September 21, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Microsoft San Jose Data Center Campus (SJ04) use?
No water withdrawal figure for Microsoft San Jose Data Center Campus (SJ04) is on record here. Cooling is recorded as closed_loop, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.
Who operates Microsoft San Jose Data Center Campus (SJ04), and how big is it?
Microsoft is the operator on record. We hold 50 sites for that company across the registry. Capacity on record is 97.8 MW. The site is recorded at 22.29 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "Microsoft San Jose Data Center Campus (SJ04)," updated September 21, 2026, https://suedatacenters.org/data-centers/microsoft-orchard-parkway-san-jose-ca.
Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/microsoft-orchard-parkway-san-jose-ca, retrieved October 1, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.San Jose Data Center 04, Notice of Preparation (SCH 2023020229) · California Governor's Office of Land Use and Climate Innovation (CEQAnet) · retrieved September 14, 2026
- 2.Microsoft Fourth Revised Project Description, SJ04 (docket 22-SPPE-02, TN 264764) · California Energy Commission e-filing · retrieved September 21, 2026
- 3.Nominatim geocode of 2515 Orchard Parkway, San Jose, CA · OpenStreetMap contributors · retrieved September 14, 2026
- 4.California Energy Commission, San José Data Center 04 (22-SPPE-02), 97.8 MW, Orchard Parkway & Component Drive · California Energy Commission · retrieved September 21, 2026
- 5.City of San José, Data Center and other Large Energy-Use Projects (application list updated 2026-07-13; Wayback capture 2026-08-13) · City of San José Planning Division · retrieved September 21, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us