Cascade Digital Power Hatfield Bitcoin Mine (Lake Arbutus Hydro)
Hatfield, Jackson County, Wisconsin
Cascade Digital Power Hatfield Bitcoin Mine (Lake Arbutus Hydro) is an operating crypto mining site in Hatfield, Wisconsin (Jackson County), operated by Cascade Digital Power (Digital Power Optimization). The public record puts it at announced March 2022, 6 MW operating.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- Cascade Digital Power (Digital Power Optimization)
- Facility type
- Crypto mining
- Location
- Hatfield, Jackson County, WI
- Coordinates
- 44.4147, -90.7307 (approximate)
- Power capacity
- 6 MW operating
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- March 2022
- Utility
- Not established from a public source
- Power source
- Hydro
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Confirmed by multiple independent sources or official documentation
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- February 2022OperatingIndustrial-scale mining began at the Hatfield site in mid-February 2022; the partnership was announced at the end of March 2022. Source: PR Newswire / Digital Power Optimization
Opposition and litigation at this site
Nothing on record as of August 18, 2026. No lawsuit, organized opposition, or contested hearing over Cascade Digital Power Hatfield Bitcoin Mine (Lake Arbutus Hydro) in Hatfield, Jackson County, Wisconsin appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
Powered by a hydroelectric plant on Lake Arbutus operating since 1908; roughly half the plant's output is sold to the grid and the remainder consumed on site by the mining load.
Notes on the record
Cascade Digital Power was formed in 2022 by Digital Power Optimization, Wiconi Hydro and a family office to monetize surplus output from a 1908 hydroelectric plant that had fallen into disrepair. Four employees (three plant, one IT). Bitmain S19j Pro ASICs. Local town and county officials were unaware of the operation when it began. Coordinates are the Hatfield locality geocode, not a parcel-confirmed point.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Questions people ask about this site
Is there opposition to the Cascade Digital Power Hatfield Bitcoin Mine (Lake Arbutus Hydro) in Hatfield?
Nothing on record as of August 18, 2026. No lawsuit, organized opposition, or contested hearing over Cascade Digital Power Hatfield Bitcoin Mine (Lake Arbutus Hydro) in Hatfield, Jackson County, Wisconsin appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Cascade Digital Power Hatfield Bitcoin Mine (Lake Arbutus Hydro)?
No lawsuit over Cascade Digital Power Hatfield Bitcoin Mine (Lake Arbutus Hydro) appears in the record we track as of August 18, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Cascade Digital Power Hatfield Bitcoin Mine (Lake Arbutus Hydro) use?
No water withdrawal figure for Cascade Digital Power Hatfield Bitcoin Mine (Lake Arbutus Hydro) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Cascade Digital Power Hatfield Bitcoin Mine (Lake Arbutus Hydro), and how big is it?
Cascade Digital Power (Digital Power Optimization) is the operator on record. Capacity on record is 6 MW.
How to cite this page
SueDataCenters.org Data Center Registry, "Cascade Digital Power Hatfield Bitcoin Mine (Lake Arbutus Hydro)," updated August 18, 2026, https://suedatacenters.org/data-centers/cascade-digital-power-hatfield-wi.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/cascade-digital-power-hatfield-wi, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Jackson County is home to a new cryptocurrency mine, a surprise for many local, county officials · Wisconsin Public Radio · retrieved August 18, 2026
- 2.Digital Power Optimization Forms Partnership to Combine Hydro Power and Cryptocurrency Mining: Cascade Digital Power · PR Newswire / Digital Power Optimization · retrieved August 18, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us