Meta Fort Worth Data Center
Fort Worth, Tarrant County, Texas · All 28 Meta sites · Every Meta case on our tracker
Meta Fort Worth Data Center is an operating data center in Fort Worth, Texas (Tarrant County), operated by Meta. The public record puts it at announced 2015, 200 acres, a reported $1.5 billion investment.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- Meta
- Facility type
- Data center, AI use likely
- Location
- Fort Worth, Tarrant County, TX
- Coordinates
- 32.9844, -97.2618 (approximate)
- Power capacity
- Not established from a public source
- Land
- 200 acres
- Investment
- $1.5 billion
- Announced
- 2015
- Utility
- Oncor
- Power source
- Wind
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- 200 permanent; 1,200 construction
- Public subsidy
- Fort Worth 20-yr real/personal-property tax grant + Tarrant County 10-yr abatement (up to 60% real/personal property, 40% Hospital District), $147 million, Fort Worth / Tarrant County, TX, 2015
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- 2017OperatingBroke ground 2015, began serving traffic 2017; ~200-acre campus, expanded since. Source: Baxtel
Opposition and litigation at this site
Nothing on record as of July 25, 2026. No lawsuit, organized opposition, or contested hearing over Meta Fort Worth Data Center in Fort Worth, Tarrant County, Texas appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
Facebook/Meta signed a 2015 PPA for the 200 MW Shannon Wind Farm in Clay County, TX (~90 mi from the site) specifically to power the new Fort Worth data center; the project delivers via an Oncor Electric Delivery substation.
Public money on the record
| Program | Amount | Granted by | Year |
|---|---|---|---|
| Fort Worth 20-yr real/personal-property tax grant + Tarrant County 10-yr abatement (up to 60% real/personal property, 40% Hospital District) | $147 million | Fort Worth / Tarrant County, TX | 2015 |
Notes on the record
Meta (Facebook) data center at 4500 Like Way, Fort Worth, Tarrant County (near TX-170 and Park Vista Blvd), broke ground 2015, began serving traffic in 2017, on a ~200-acre campus, heavily expanded since (with an announced AI-driven expansion). DISTINCT from Meta's tracked El Paso, TX campus. No site-specific IT-load MW is disclosed. Coordinates are an approximate geocode of the disclosed Like Way address; a county-parcel pass could upgrade precision to exact.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- How the community has received it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Our reporting on this site
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- PowerHouse Circle T Data Center Campus · Westlake · PowerHouse Data Centers3 mi · Proposed · 300 MW
- Core Scientific Denton Data Center (Denton 1) · Denton · Core Scientific16 mi · Under construction · 260 MW
- QTS Irving 1 · Irving · QTS Data Centers17 mi · Operating · 165 MW
- QumulusAI Denton Modular Data Center · Denton · QumulusAI, Inc.18 mi · Proposed · 20 MW
- Microsoft Irving Data Centers · Irving · Microsoft21 mi · Proposed
- Lumen Dallas 6 · Dallas · Lumen Technologies24 mi · Operating
- Prime DFW01-01 · Dallas · Prime Data Centers24 mi · Operating · 8 MW
- BlockchAIn Wise County Data Mining Site · BlockchAIn Digital Infrastructure, Inc.26 mi · Under construction
Questions people ask about this site
Is there opposition to the Meta Fort Worth Data Center in Fort Worth?
Nothing on record as of July 25, 2026. No lawsuit, organized opposition, or contested hearing over Meta Fort Worth Data Center in Fort Worth, Tarrant County, Texas appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Meta Fort Worth Data Center?
No lawsuit over Meta Fort Worth Data Center appears in the record we track as of July 25, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Meta Fort Worth Data Center use?
No water withdrawal figure for Meta Fort Worth Data Center is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Meta Fort Worth Data Center, and how big is it?
Meta is the operator on record. We hold 28 sites for that company across the registry. No capacity figure is on record for this site. The site is recorded at 200 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "Meta Fort Worth Data Center," updated July 25, 2026, https://suedatacenters.org/data-centers/meta-fort-worth-tx.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/meta-fort-worth-tx, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Facebook Fort Worth Data Center, 4500 Like Way, opened 2017, ~200 acres, fully operational · Baxtel · retrieved July 19, 2026
- 2.Fort Worth Data Center info sheet · Meta Data Centers · retrieved July 19, 2026
- 3.Fortune - Facebook is building a huge wind-powered data center in Texas · retrieved July 24, 2026
- 4.Power Technology - Shannon Wind Farm, Clay County, Texas · retrieved July 24, 2026
- 5.Data Center Knowledge, Reports: $1B Facebook Data Center Project Underway in Texas (2015) · retrieved July 25, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.