Data Center Registry
Evocative BOS1 (Somerville)
Somerville, Middlesex County, Massachusetts · All 3 Evocative sites
Evocative BOS1 (Somerville) is an operating data center in Somerville, Massachusetts (Middlesex County), operated by Evocative. The public record puts it at 6 MW operating.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- Evocative
- Facility type
- Data center
- Location
- 50 Inner Belt Road, Somerville, Middlesex County, MA, 02143
- Coordinates
- 42.3779, -71.0804 (approximate)
- Power capacity
- 6 MW operating
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Confirmed by multiple independent sources or official documentation
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- September 15, 2026OperatingEvocative's own Boston data center page states 46,000 sq ft with 21,600 sq ft of raised floor and 6 MW of total utility power. Source: Evocative
Opposition and litigation at this site
Nothing on record as of September 15, 2026. No lawsuit, organized opposition, or contested hearing over Evocative BOS1 (Somerville) in Somerville, Middlesex County, Massachusetts appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
Formerly Internap/INAP Boston; acquired by Evocative. Marketed as "Boston" but sited in Somerville at 50 Inner Belt Road - a different building and operator from the tracked CoreSite BO1 at 70 Innerbelt Road. The 6 MW figure is total utility power stated by the operator, not IT load.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- CoreSite BO1 - Boston, MA · Somerville · CoreSiteunder 1 mile · Operating
- DataBank BOS1 - Downtown Boston · Boston · DataBank2 mi · Operating · 0.5 MW
- Expedient Boston · Medford · Expedient2 mi · Operating
- Markley Group Boston (One Summer Street / BOSIX) · Boston · Markley Group2 mi · Operating · 30 MW
- Digital Realty BOS14 · Needham · Digital Realty9 mi · Operating
- Equinix BO1 · Waltham · Equinix10 mi · Operating
- Equinix BO2 - Boston, Billerica · Billerica · Equinix14 mi · Operating
- Markley Group One Lowell Data Center · Lowell · Markley Group21 mi · Operating · In litigation
Questions people ask about this site
Is there opposition to the Evocative BOS1 (Somerville) data center in Somerville?
Nothing on record as of September 15, 2026. No lawsuit, organized opposition, or contested hearing over Evocative BOS1 (Somerville) in Somerville, Middlesex County, Massachusetts appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Evocative BOS1 (Somerville) data center?
No lawsuit over Evocative BOS1 (Somerville) appears in the record we track as of September 15, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Evocative BOS1 (Somerville) use?
No water withdrawal figure for Evocative BOS1 (Somerville) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Evocative BOS1 (Somerville), and how big is it?
Evocative is the operator on record. We hold 3 sites for that company across the registry. Capacity on record is 6 MW.
How to cite this page
SueDataCenters.org Data Center Registry, "Evocative BOS1 (Somerville)," updated September 15, 2026, https://suedatacenters.org/data-centers/evocative-bos1-somerville-ma.
Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/evocative-bos1-somerville-ma, retrieved October 1, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Evocative Boston (BOS1) - "46,000 sq ft", "21,600 sq ft raised floor", "6 MW" · Evocative · retrieved September 15, 2026
- 2.PeeringDB facility record: Evocative BOS1, 50 Inner Belt Road, Somerville · PeeringDB · retrieved September 15, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us