Data City, Texas is a proposed data center in Laredo, Texas (Webb County), operated by Energy Abundance Development Corporation. The public record puts it at 5 GW planned, 50,000 acres. The record for this site rests on a single unverified source and should be read that way.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Proposed

Operator
Energy Abundance Development Corporation
Facility type
Data center, AI use likely
Location
Laredo, Webb County, TX
Coordinates
27.5306, -99.4803 (approximate)
Power capacity
5 GW planned
Land
50,000 acres
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Not established from a public source
Power source
Mixed
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Rumored: a single unverified source

Opposition and litigation at this site

Nothing on record as of September 10, 2026. No lawsuit, organized opposition, or contested hearing over Data City, Texas in Laredo, Webb County, Texas appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

Power and water

Claimed 100% behind-the-meter: wind, solar, batteries, and dual-fuel gas turbines initially on Texas natural gas, later shifting toward green hydrogen; paired with a proposed 2 TWh 'Hydrogen City' salt-dome hydrogen storage concept.

Notes on the record

Early-stage developer announcement (Mar 21 2025) for a 5 GW behind-the-meter data center hub on ~50,000 acres near Laredo (Webb County), targeting large AI workloads with direct-to-chip liquid cooling. Phase 1 stated as 300 MW / ~1M sq ft in 2026, scaling to 5 GW / 15M+ sq ft. Highly speculative: primary source is a single promotional press release; no permit, interconnection, or construction evidence located. Coordinate anchored on Laredo. Public-reception check (2026-09-10): Checked the operator's launch press release and one regional business-journal writeup (2026-09-10); both cover only the developer's technical vision (50,000-acre, off-grid/islanded from ERCOT) with no mention of a public hearing, Laredo city/county government reaction, or resident feedback. No community-reception record found in either source.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • How the community has received it
  • Which utility serves it
Which document closes each gap
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Questions people ask about this site

Is there opposition to the Data City, Texas data center in Laredo?

Nothing on record as of September 10, 2026. No lawsuit, organized opposition, or contested hearing over Data City, Texas in Laredo, Webb County, Texas appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the Data City, Texas data center?

No lawsuit over Data City, Texas appears in the record we track as of September 10, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Data City, Texas use?

No water withdrawal figure for Data City, Texas is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates Data City, Texas, and how big is it?

Energy Abundance Development Corporation is the operator on record. Capacity on record is 5 GW. The site is recorded at 50000 acres.

How to cite this page

SueDataCenters.org Data Center Registry, "Data City, Texas," updated September 10, 2026, https://suedatacenters.org/data-centers/data-city-energy-abundance-laredo-tx.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/data-city-energy-abundance-laredo-tx, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Energy Abundance announces Data City, Texas (press release, Mar 21 2025) · PR Newswire / Energy Abundance Development Corporation · retrieved July 14, 2026
  2. 2.Up to 5GW data center with behind-the-meter hydrogen power promised for Laredo, Texas · Data Center Dynamics · retrieved July 14, 2026
  3. 3.Data City Texas, project listing · Baxtel · retrieved July 14, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us