Under constructionNo reception on recordRecord updated September 10, 2026

Crane PDX02 is a data center under construction in Forest Grove, Oregon (Washington County), operated by Crane Data Centers. The public record puts it at 48 MW planned.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Under construction

Operator
Crane Data Centers
Facility type
Data center
Location
Forest Grove, Washington County, OR
Coordinates
45.5190, -123.1111 (approximate)
Power capacity
48 MW planned
Land
Not established from a public source
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Not established from a public source
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Reported by at least one credible outlet or filing

Opposition and litigation at this site

Nothing on record as of September 10, 2026. No lawsuit, organized opposition, or contested hearing over Crane PDX02 in Forest Grove, Washington County, Oregon appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

Power and water

Crane states the Portland Metro campus is 'powered by low cost, renewable energy, utilizing sources like wind and solar', with a design target of 1.3 PUE at full IT capacity and 667+ watts/ft2 high-density cooling.

Notes on the record

Public-reception check (2026-09-10): Checked Crane Data Centers' own project page (2026-09-10); it contains only technical specifications and facility features. No public hearing, resident reaction, or official statement of support/opposition documented in this source.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
  • Which utility serves it
Which document closes each gap
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Questions people ask about this site

Is there opposition to the Crane PDX02 data center in Forest Grove?

Nothing on record as of September 10, 2026. No lawsuit, organized opposition, or contested hearing over Crane PDX02 in Forest Grove, Washington County, Oregon appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the Crane PDX02 data center?

No lawsuit over Crane PDX02 appears in the record we track as of September 10, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Crane PDX02 use?

No water withdrawal figure for Crane PDX02 is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates Crane PDX02, and how big is it?

Crane Data Centers is the operator on record. We hold 2 sites for that company across the registry. Capacity on record is 48 MW.

How to cite this page

SueDataCenters.org Data Center Registry, "Crane PDX02," updated September 10, 2026, https://suedatacenters.org/data-centers/crane-pdx02-forest-grove-or.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/crane-pdx02-forest-grove-or, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Crane Data Centers, Oregon (Portland Metro campus, Forest Grove): 'PDX02: ~48 MW and ~150,000 sf'; campus combined capacity 100+ MW; 'Q3 2026 ready for service'. PDX01 Phase 1 and Phase 2 are each listed separately at 24 MW / 36,000 sf white space · Crane Data Centers · retrieved August 14, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us