Data Center Registry
Rowan Meriwether Data Center Campus (Project Meriwether)
Forest Grove, Washington County, Oregon · All 5 Rowan Digital Infrastructure sites
Rowan Meriwether Data Center Campus (Project Meriwether) is a proposed data center in Forest Grove, Oregon (Washington County), operated by Rowan Digital Infrastructure. The public record puts it at 150 MW planned.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Proposed
- Operator
- Rowan Digital Infrastructure
- Facility type
- Data center
- Location
- 2506 Oak St, Forest Grove, Washington County, OR, 97116
- Coordinates
- 45.5260, -123.0880 (approximate)
- Power capacity
- 150 MW planned
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- October 12, 2026ProposedListed as a future facility in the planning stage. Source: Baxtel
Opposition and litigation at this site
Nothing on record as of October 12, 2026. No lawsuit, organized opposition, or contested hearing over Rowan Meriwether Data Center Campus (Project Meriwether) in Forest Grove, Washington County, Oregon appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
Baxtel reports that preliminary plans for Project Meriwether call for 150 MW and lists the site as 'Future facility in planning stage' at 2506 Oak St, Forest Grove, about 0.78 miles from Crane's Forest Grove campus. This is a different operator from Crane PDX01/PDX02. As of October 2026, no local permit filing was located. The coordinates are a point on Oak Street from OSM, not the parcel.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Crane PDX01 · Forest Grove · Crane Data Centers1 mi · Under construction · 76 MW · Contested
- Crane PDX02 · Forest Grove · Crane Data Centers1 mi · Under construction · 48 MW
- STACK Hillsboro Campus · Hillsboro · STACK Infrastructure5 mi · Proposed · 75 MW
- CoreSite Hillsboro Data Campus (HI1/HI2) · Hillsboro · CoreSite7 mi · Proposed · Contested
- Aligned PDX-01 · Hillsboro · Aligned Data Centers7 mi · Operating
- Flexential Portland - Hillsboro 4 (PDX04) · Hillsboro · Flexential7 mi · Operating · 18 MW
- NTT Hillsboro HI1 Data Center · Hillsboro · NTT Global Data Centers7 mi · Operating · 36 MW
- Flexential Portland - Hillsboro 5 · Hillsboro · Flexential7 mi · Operating · 36 MW
Questions people ask about this site
Is there opposition to the Rowan Meriwether Data Center Campus (Project Meriwether) in Forest Grove?
Nothing on record as of October 12, 2026. No lawsuit, organized opposition, or contested hearing over Rowan Meriwether Data Center Campus (Project Meriwether) in Forest Grove, Washington County, Oregon appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Rowan Meriwether Data Center Campus (Project Meriwether)?
No lawsuit over Rowan Meriwether Data Center Campus (Project Meriwether) appears in the record we track as of October 12, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Rowan Meriwether Data Center Campus (Project Meriwether) use?
No water withdrawal figure for Rowan Meriwether Data Center Campus (Project Meriwether) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Rowan Meriwether Data Center Campus (Project Meriwether), and how big is it?
Rowan Digital Infrastructure is the operator on record. We hold 5 sites for that company across the registry. Capacity on record is 150 MW.
How to cite this page
SueDataCenters.org Data Center Registry, "Rowan Meriwether Data Center Campus (Project Meriwether)," updated October 12, 2026, https://suedatacenters.org/data-centers/rowan-meriwether-forest-grove-or.
Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/rowan-meriwether-forest-grove-or, retrieved October 29, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Rowan: Meriwether, OR · Baxtel · retrieved October 12, 2026
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us