DC BLOX Montgomery Data Center

Montgomery, Montgomery County, Alabama · All 12 DC BLOX sites

ProposedNo reception on recordAI mixed useRecord updated September 9, 2026

DC BLOX Montgomery Data Center is a proposed data center in Montgomery, Alabama (Montgomery County), operated by DC BLOX. The public record puts it at announced November 2024, 40 MW planned, a reported $30 million investment.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Proposed

Operator
DC BLOX
Facility type
Data center, AI use mixed
Location
Montgomery, Montgomery County, AL
Coordinates
32.3777, -86.3091 (approximate)
Power capacity
40 MW planned
Land
Not established from a public source
Investment
$30 million
Announced
November 2024
Utility
Not established from a public source
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Confirmed by multiple independent sources or official documentation

Opposition and litigation at this site

Nothing on record as of September 9, 2026. No lawsuit, organized opposition, or contested hearing over DC BLOX Montgomery Data Center in Montgomery, Montgomery County, Alabama appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

Notes on the record

Announced November 2024 as one of four DC BLOX southeastern hyperscale edge-node sites. Chamber release states verbatim: "$30 million data center investment", "5MW of capacity for a hyperscale anchor tenant, with the potential to scale up to 40MW for additional tenants", "Located in Interstate Industrial Park". Alabama Department of Commerce (Made in Alabama) repeats the 5MW-to-40MW figure. STATUS IS DELIBERATELY 'proposed': no source fetched in this run states that construction has begun, and DC BLOX's own live location map (fetched 2026-09-09) lists only Birmingham and Huntsville in Alabama with no Montgomery entry. An aggregator (servercountry.org) lists this as 40 MW under construction, NOT verified here and not cited. COORDINATES ARE A MONTGOMERY CITY-CENTROID GEOCODE, not the site: the only site detail in a fetched source is the name "Interstate Industrial Park", which does not resolve in Nominatim; a secondary search summary placed it off the I-65 Hope Hull exit (roughly 12 miles southwest of the centroid used here) but no page stating that was successfully fetched, so it is not recorded. The coordinate should be tightened before this record is trusted for mapping. No acreage, square footage, job count, timeline or incentive figures appear in any fetched source. Distinct from meta-montgomery-al (different operator and site).

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
  • Which utility serves it
Which document closes each gap
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Questions people ask about this site

Is there opposition to the DC BLOX Montgomery Data Center in Montgomery?

Nothing on record as of September 9, 2026. No lawsuit, organized opposition, or contested hearing over DC BLOX Montgomery Data Center in Montgomery, Montgomery County, Alabama appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the DC BLOX Montgomery Data Center?

No lawsuit over DC BLOX Montgomery Data Center appears in the record we track as of September 9, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does DC BLOX Montgomery Data Center use?

No water withdrawal figure for DC BLOX Montgomery Data Center is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates DC BLOX Montgomery Data Center, and how big is it?

DC BLOX is the operator on record. We hold 12 sites for that company across the registry. Capacity on record is 40 MW.

How to cite this page

SueDataCenters.org Data Center Registry, "DC BLOX Montgomery Data Center," updated September 9, 2026, https://suedatacenters.org/data-centers/dc-blox-montgomery-al.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/dc-blox-montgomery-al, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.DC BLOX announces $30M investment in new Montgomery data center · Montgomery Regional Chamber of Commerce · retrieved September 9, 2026 · original offline, archived copy from May 13, 2026
  2. 2.DC BLOX plans new advanced data centers in Montgomery and Huntsville · Made in Alabama (Alabama Department of Commerce) · retrieved September 9, 2026
  3. 3.DC BLOX Data Center Locations in Southeastern US (operator location map) · DC BLOX · retrieved September 9, 2026
  4. 4.Nominatim geocode of Montgomery, Alabama (city centroid) · OpenStreetMap / Nominatim · retrieved September 9, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us