Patmos Fairfield Colocation Data Center

Fairfield, Jefferson County, Alabama

ProposedContestedAI mixed useRecord updated September 9, 2026

Patmos Fairfield Colocation Data Center is a proposed data center in Fairfield, Alabama (Jefferson County), operated by Patmos. It is the subject of active public debate, with hearings, petitions, or organized opposition on record.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Proposed

Operator
Patmos
Facility type
Data center, AI use mixed
Location
Fairfield, Jefferson County, AL
Coordinates
33.4917, -86.9150 (approximate)
Power capacity
Not established from a public source
Land
Not established from a public source
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Not established from a public source
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
50 permanent; 120 construction
Public subsidy
Not established from a public source
Community reception
Contested
Source confidence
Confirmed by multiple independent sources or official documentation

Opposition and litigation at this site

Yes. Patmos Fairfield Colocation Data Center in Fairfield, Jefferson County, Alabama is contested. Hearings, public comment, petitions, or organized opposition are on record, and no lawsuit has been filed so far. WBRC (13 Aug 2026) reports "Hundreds pack Fairfield town hall over proposed data center inside former Walmart", with residents raising health risks, rising utility bills and community benefit.

How the community has taken it

Reception is a sourced signal, not an editorial judgment: contested means active public debate is on record, with hearings, petitions, or organized opposition, without litigation.

WBRC (13 Aug 2026) reports "Hundreds pack Fairfield town hall over proposed data center inside former Walmart", with residents raising health risks, rising utility bills and community benefit. Patmos's founder answered noise concerns by saying "you'll hear the equivalent of a weed wacker" when generators run and that operations would be "quieter than the Walmart"; Patmos said "the only environmental impact is water use." Resident Bessie Bell questioned whether the project would help Fairfield's development. Mayor Herman Carnes said the city has "not seen major economic development in roughly 15 years" and promised transparency. NOTE the city council had already passed a temporary data center ban, from which this project was exempt, recorded as `contested` rather than `opposed` because the friction is documented and organized in public meetings but no vote against this project is reported.

Source: WBRC FOX6 News

Notes on the record

Retrofit of a former Walmart Supercenter in Fairfield into a colocation data center. WBRC states: "Patmos would bring around 50 long-term jobs, plus roughly 120 construction workers during the build" and "If approved, construction could start in September, with the first phase completed by January or February 2027 and a larger expansion planned for 2028." CAPACITY AND INVESTMENT DELIBERATELY OMITTED, WBRC explicitly does not disclose either; an aggregator (servercountry.org) lists a "Fairfield Colocation Data Center" at 45 MW, which is NOT verified here and not cited. COORDINATES ARE THE FAIRFIELD MUNICIPAL CENTROID, not the building: the source identifies the site only as "the former Walmart Supercenter", no street address, and an Overpass query over the Fairfield bounding box returned no Walmart-named or former-retail building in OSM. Tighten this before mapping. STATUS is "proposed", construction was conditional on approval as of 13 Aug 2026; if the September 2026 groundbreaking happened, this should move to under_construction, which is worth re-checking since that date has now passed. This is a genuinely distinct site from qts-marvel-bessemer-al (different operator, different city) though both sit in the same Birmingham-west corridor.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Power capacity in megawatts
  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Land area
  • Which utility serves it
Which document closes each gap
Power capacity in megawatts
The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Land area
The rezoning application, the plat, or the deed recorded with the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Questions people ask about this site

Is there opposition to the Patmos Fairfield Colocation Data Center in Fairfield?

Yes. Patmos Fairfield Colocation Data Center in Fairfield, Jefferson County, Alabama is contested. Hearings, public comment, petitions, or organized opposition are on record, and no lawsuit has been filed so far. WBRC (13 Aug 2026) reports "Hundreds pack Fairfield town hall over proposed data center inside former Walmart", with residents raising health risks, rising utility bills and community benefit.

Has anyone filed a lawsuit over the Patmos Fairfield Colocation Data Center?

No lawsuit over Patmos Fairfield Colocation Data Center appears in the record we track as of September 9, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Patmos Fairfield Colocation Data Center use?

No water withdrawal figure for Patmos Fairfield Colocation Data Center is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates Patmos Fairfield Colocation Data Center, and how big is it?

Patmos is the operator on record. No capacity figure is on record for this site.

How to cite this page

SueDataCenters.org Data Center Registry, "Patmos Fairfield Colocation Data Center," updated September 9, 2026, https://suedatacenters.org/data-centers/patmos-fairfield-al.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/patmos-fairfield-al, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Hundreds pack Fairfield town hall over proposed data center inside former Walmart (13 Aug 2026) · WBRC FOX6 News · retrieved September 9, 2026
  2. 2.Nominatim geocode of Fairfield, Jefferson County, Alabama (municipal centroid) · OpenStreetMap / Nominatim · retrieved September 9, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us