Sue Data Centers

Data Center Registry

Artemis Power Tech Wolfe County Data Center

Wolfe County, Kentucky

CancelledNo reception on recordRecord updated September 22, 2026

Artemis Power Tech Wolfe County Data Center is a cancelled crypto mining site in Kentucky (Wolfe County), operated by Artemis Power Tech.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Cancelled

Operator
Artemis Power Tech
Facility type
Crypto mining
Location
Wolfe County, KY
Coordinates
37.7074, -83.7256 (approximate)
Power capacity
Not established from a public source
Land
Not established from a public source
Investment
Not established from a public source
Announced
Not established from a public source
Utility
East Kentucky Power Cooperative
Power source
Grid
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Reported by at least one credible outlet or filing

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. July 2026
    Cancelled
    Operation shut down after about three years; an employee said 'the market collapsed and it shut down' and that equipment removal would take about a month. Source: LEX 18 (WLEX)
  2. August 2023
    Operating
    Containers of computers arrived and the site became active, next to an EKPC substation along KY 1036. Source: The Lexington Times (syndicating Kentucky Lantern)

Opposition and litigation at this site

Nothing on record as of September 22, 2026. No lawsuit, organized opposition, or contested hearing over Artemis Power Tech Wolfe County Data Center in Wolfe County, Kentucky appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

Power and water

EKPC supplied 10 MW with capacity to increase to 13 MW; Artemis Power Tech paid $235,000 to upgrade the adjacent EKPC substation.

Notes on the record

Houston-based Artemis Power Tech bought the land from Hay Crypto Mining for $325,000 in February 2023, had electrical lines installed in March 2023, and went active in August 2023 in an unincorporated part of Wolfe County next to an East Kentucky Power Cooperative substation along Kentucky Route 1036, near the Wolfe-Lee county line and about six miles from Natural Bridge State Resort Park. Residents reported constant 50-60 dB fan noise for nearly three years. The schema has no 'decommissioned' status; 'cancelled' is used as the closest fit for a shut-down facility, per the tracker's existing convention. capacityMw is deliberately unset because nothing is producing - the 10 MW supplied / 13 MW available figures are recorded in energy.notes instead. COORDINATES ARE WEAK AND SHOULD BE REVIEWED: no parcel or address is published, and OpenStreetMap maps KY 1036 only on the Lee County side of the line, so the point used here is an approximate anchor on that road near the county line, not a confirmed Wolfe County footprint. The shutdown month (July 2026) is not printed on the LEX 18 page fetched, which says only 'last week'; it is corroborated by the same outlet's related coverage but should be treated as approximate.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Power capacity in megawatts
  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
Which document closes each gap
Power capacity in megawatts
The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Free case review

Living near Artemis Power Tech Wolfe County Data Center?

Tell us the basics and an independent attorney handling data center cases in your state will follow up. Free, and you are never obligated to hire anyone.

Questions people ask about this site

Is there opposition to the Artemis Power Tech Wolfe County Data Center in Wolfe County, Kentucky?

Nothing on record as of September 22, 2026. No lawsuit, organized opposition, or contested hearing over Artemis Power Tech Wolfe County Data Center in Wolfe County, Kentucky appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the Artemis Power Tech Wolfe County Data Center?

No lawsuit over Artemis Power Tech Wolfe County Data Center appears in the record we track as of September 22, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Artemis Power Tech Wolfe County Data Center use?

No water withdrawal figure for Artemis Power Tech Wolfe County Data Center is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates Artemis Power Tech Wolfe County Data Center, and how big is it?

Artemis Power Tech is the operator on record. No capacity figure is on record for this site.

How to cite this page

SueDataCenters.org Data Center Registry, "Artemis Power Tech Wolfe County Data Center," updated September 22, 2026, https://suedatacenters.org/data-centers/artemis-power-tech-wolfe-ky.

Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/artemis-power-tech-wolfe-ky, retrieved October 1, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.In a rural Kentucky community, the roar of a suspected crypto 'mine' never ends · The Lexington Times (syndicating Kentucky Lantern) · retrieved September 22, 2026
  2. 2.'The market collapsed:' After 3 years of operation, Wolfe County bitcoin operation shuts down · LEX 18 (WLEX) · retrieved September 22, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us