Data Center Registry
Iron Mountain Kansas City Data Center (KCM-1)
Kansas City, Jackson County, Missouri · All 16 Iron Mountain sites
Iron Mountain Kansas City Data Center (KCM-1) is an operating data center in Kansas City, Missouri (Jackson County), operated by Iron Mountain. The public record puts it at 22 acres.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- Iron Mountain
- Facility type
- Data center
- Location
- 6301 Winchester Ave Suite 817, Kansas City, Jackson County, MO, 64133
- Coordinates
- 39.0109, -94.5046 (approximate)
- Power capacity
- Not established from a public source
- Land
- 22 acres
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- KCPL (now Evergy)
- Power source
- Grid
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Opposition and litigation at this site
Nothing on record as of October 13, 2026. No lawsuit, organized opposition, or contested hearing over Iron Mountain Kansas City Data Center (KCM-1) in Kansas City, Jackson County, Missouri appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
Operator lists KCPL as utility and states power is matched by 100% renewable energy (operator claim).
Notes on the record
Underground colocation facility ~110 ft below ground (the operator FAQ also says 100 ft) on a 22-acre campus. 50,000 sq ft building with 13,000 sq ft of data hall, and 3.9 MW 'total potential capacity' (not recorded as operational MW because it is stated as potential). 2N electrical, N+1 cooling. Coordinates are the address geocode of the campus entrance (approximate for an underground facility).
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- How the community has received it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Our reporting on this site
- Independence, Missouri · Active litigation
- What a Gigawatt Would Mean for Sharon, Kansas · Guide
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Patmos KC Star Building Campus · Kansas City · Patmos Hosting7 mi · Operating · 35 MW
- Netrality 1102 Grand (Kansas City) · Kansas City · Netrality Data Centers7 mi · Operating
- Nebius AI Factory (Independence) · Independence · Nebius Group10 mi · Under construction · 1.2 GW · In litigation
- LightEdge Kansas City (SubTropolis Technology Center) · Kansas City · LightEdge11 mi · Operating
- Edged Kansas City · Kansas City · Edged Data Centers11 mi · Operating · 26 MW
- Google Kansas City Data Center (Hunt Midwest Business Center) · Kansas City · Google11 mi · Under construction
- Project Yardbird · Kansas City · PowerTransitions12 mi · Proposed · 200 MW
- QTS Overland Park Data Center (OVP1) · Overland Park · QTS Data Centers12 mi · Operating
Questions people ask about this site
Is there opposition to the Iron Mountain Kansas City Data Center (KCM-1) in Kansas City?
Nothing on record as of October 13, 2026. No lawsuit, organized opposition, or contested hearing over Iron Mountain Kansas City Data Center (KCM-1) in Kansas City, Jackson County, Missouri appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Iron Mountain Kansas City Data Center (KCM-1)?
No lawsuit over Iron Mountain Kansas City Data Center (KCM-1) appears in the record we track as of October 13, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Iron Mountain Kansas City Data Center (KCM-1) use?
No water withdrawal figure for Iron Mountain Kansas City Data Center (KCM-1) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Iron Mountain Kansas City Data Center (KCM-1), and how big is it?
Iron Mountain is the operator on record. We hold 16 sites for that company across the registry. No capacity figure is on record for this site. The site is recorded at 22 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "Iron Mountain Kansas City Data Center (KCM-1)," updated October 13, 2026, https://suedatacenters.org/data-centers/iron-mountain-kcm-1-kansas-city-mo.
Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/iron-mountain-kcm-1-kansas-city-mo, retrieved October 29, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Kansas City Data Center (KCM-1) · Iron Mountain · retrieved October 13, 2026
- 2.OpenStreetMap Nominatim geocode: 6301 Winchester Avenue, Kansas City, MO · OpenStreetMap · retrieved October 13, 2026
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us