Data Center Registry
Eneus Energy RGV Data Center (Harlingen)
Harlingen, Cameron County, Texas
Eneus Energy RGV Data Center (Harlingen) is a proposed data center in Harlingen, Texas (Cameron County), operated by Eneus Energy (RGV Property Group). The public record puts it at 1,785 acres, a reported $14 billion investment.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Proposed
- Operator
- Eneus Energy (RGV Property Group)
- Facility type
- Data center
- Location
- Harlingen, Cameron County, TX
- Coordinates
- 26.1908, -97.6961 (approximate)
- Power capacity
- Not established from a public source
- Land
- 1,785 acres
- Investment
- $14 billion
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- February 2026ProposedIn its initial planning and evaluation phase. As of February 2026 no formal proposal had been submitted to local authorities. Source: Baxtel
Opposition and litigation at this site
Nothing on record as of October 14, 2026. No lawsuit, organized opposition, or contested hearing over Eneus Energy RGV Data Center (Harlingen) in Harlingen, Cameron County, Texas appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
Site at Gomez Rd & FM 509 near Harlingen: 16 planned data halls on 1,785 acres, served by a planned 765 kV line. Capacity is omitted because reports conflict: up to 2 GW in coverage, but up to 1 GW of interconnection in Eneus's PUCT letter. Coordinates are the Harlingen city point. A tracker listed the project as blocked by a moratorium, which was not verified.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- How the community has received it
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Soluna Project Ellen · Rio Hondo · Soluna Holdings8 mi · Proposed · 100 MW
- Soluna Project Kati · Raymondville · Soluna Holdings21 mi · Operating · 166 MW
- Soluna Project Kati 2 · Soluna Holdings (JV with Metrobloks)21 mi · Proposed · 350 MW
Questions people ask about this site
Is there opposition to the Eneus Energy RGV Data Center (Harlingen) in Harlingen?
Nothing on record as of October 14, 2026. No lawsuit, organized opposition, or contested hearing over Eneus Energy RGV Data Center (Harlingen) in Harlingen, Cameron County, Texas appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Eneus Energy RGV Data Center (Harlingen)?
No lawsuit over Eneus Energy RGV Data Center (Harlingen) appears in the record we track as of October 14, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Eneus Energy RGV Data Center (Harlingen) use?
No water withdrawal figure for Eneus Energy RGV Data Center (Harlingen) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Eneus Energy RGV Data Center (Harlingen), and how big is it?
Eneus Energy (RGV Property Group) is the operator on record. No capacity figure is on record for this site. The site is recorded at 1785 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "Eneus Energy RGV Data Center (Harlingen)," updated October 14, 2026, https://suedatacenters.org/data-centers/eneus-energy-rgv-data-center-harlingen-tx.
Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/eneus-energy-rgv-data-center-harlingen-tx, retrieved October 29, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Eneus Energy: Harlingen RGV Campus · Baxtel · retrieved October 14, 2026
- 2.OpenStreetMap Nominatim geocode: Harlingen, TX · OpenStreetMap contributors · retrieved October 14, 2026
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us