Beale Project Pilot (De Soto)
De Soto, Johnson County, Kansas · All 6 Beale Infrastructure sites
Beale Project Pilot (De Soto) is a data center under construction in De Soto, Kansas (Johnson County), operated by Beale Infrastructure. The public record puts it at announced August 2025, 290 acres, a reported $3.1 billion investment. It has documented support and documented opposition on record.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Under construction
- Operator
- Beale Infrastructure
- Facility type
- Data center, AI use likely
- Location
- De Soto, Johnson County, KS
- Coordinates
- 38.9660, -94.9670 (approximate)
- Power capacity
- Not established from a public source
- Land
- 290 acres
- Investment
- $3.1 billion
- Announced
- August 2025
- Utility
- Evergy
- Power source
- Grid
- Cooling
- Closed loop
- Water use
- Not established from a public source
- Jobs
- 100 permanent; 500 construction
- Public subsidy
- Kansas Senate Bill 98 to 20-year sales tax exemption on construction materials and equipment, Kansas, 2025 | De Soto Industrial Revenue Bonds, 10-year property tax abatement (PILOT payments) per building, De Soto, KS, 2025
- Community reception
- Mixed reception
- Source confidence
- Confirmed by multiple independent sources or official documentation
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- May 2026Under constructionGroundbreaking May 2026; first phase completion expected 2029 per developer and search-result synthesis; DCD source does not confirm a 2027 target Source: Data Center Dynamics
- August 2025ProposedDe Soto City Council approves 290-acre, $3.1B campus at northwest corner of 103rd Street and Edgerton Road; adjacent to Panasonic EV plant Source: Johnson County Post
Opposition and litigation at this site
Partly. Both documented support and documented opposition to Beale Project Pilot (De Soto) in De Soto, Johnson County, Kansas appear in the record, with no clear majority position. De Soto City Council approved with little public opposition in August 2025; some residents and outside observers raised concern about water draw from the Kansas River and impacts on regional water supply
How the community has taken it
Reception is a sourced signal, not an editorial judgment: mixed reception means documented support and documented opposition both exist with no clear majority position on record.
De Soto City Council approved with little public opposition in August 2025; some residents and outside observers raised concern about water draw from the Kansas River and impacts on regional water supply
Power and water
Developer funding new industrial wastewater treatment facility; cooling water drawn from Kansas River; significant infrastructure upgrades borne by developer
Public money on the record
| Program | Amount | Granted by | Year |
|---|---|---|---|
| Kansas Senate Bill 98 to 20-year sales tax exemption on construction materials and equipment | Not established | Kansas | 2025 |
| De Soto Industrial Revenue Bonds, 10-year property tax abatement (PILOT payments) per building | Not established | De Soto, KS | 2025 |
Notes on the record
Developer (Mount Sunflower Properties LLC / Beale Infrastructure, backed by Blue Owl) has pre-leased the entire campus to an unnamed large technology company. Attorney described the tenant as among 'the strongest, most financially profitable companies in the world.' Four buildings of 285,000 sq ft each (1.14M sq ft total); full build-out in 7 to 9 years. Kansas's first announced hyperscale data center. Permanent job figure of 100 is sourced from Johnson County Post ('over 100 long-term jobs paying six figures'); DCD separately cited 50 operational jobs for the first phase only. Coordinates are De Soto city centroid; exact site is at NW corner of 103rd St and Edgerton Rd.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Digital Realty Astra North (Project Jayhawk) · De Soto · Digital Realty1 mi · Permitted · Contested
- QTS New Century Commerce Center (Building B1) · New Century · QTS Data Centers10 mi · Proposed
- Beale Infrastructure Gardner Campus · Gardner · Beale Infrastructure11 mi · Cancelled · Opposed
- DataBank MCI3 South Lake Campus Data Center · Lenexa · DataBank11 mi · Operating · 12.75 MW
- TierPoint Kansas City - Lenexa · Lenexa · TierPoint12 mi · Operating
- Project Bluestem · Tonganoxie · Cloverleaf Infrastructure12 mi · Proposed · 1.2 GW · Opposed
- Project Red Wolf · Kansas City · Red Wolf DCD Properties LLC12 mi · Proposed · 600 MW · In litigation
- DAMAC Digital Heartland Data Center (Project Heartland) · Edgerton · DAMAC Digital Solutions Kansas LLC13 mi · Permitted · Contested
Questions people ask about this site
Is there opposition to the Beale Project Pilot (De Soto) data center in De Soto?
Partly. Both documented support and documented opposition to Beale Project Pilot (De Soto) in De Soto, Johnson County, Kansas appear in the record, with no clear majority position. De Soto City Council approved with little public opposition in August 2025; some residents and outside observers raised concern about water draw from the Kansas River and impacts on regional water supply
Has anyone filed a lawsuit over the Beale Project Pilot (De Soto) data center?
No lawsuit over Beale Project Pilot (De Soto) appears in the record we track as of October 22, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Beale Project Pilot (De Soto) use?
No water withdrawal figure for Beale Project Pilot (De Soto) is on record here. Cooling is recorded as closed_loop, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.
Who operates Beale Project Pilot (De Soto), and how big is it?
Beale Infrastructure is the operator on record. We hold 6 sites for that company across the registry. No capacity figure is on record for this site. The site is recorded at 290 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "Beale Project Pilot (De Soto)," updated October 22, 2026, https://suedatacenters.org/data-centers/beale-project-pilot-de-soto-ks.
Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/beale-project-pilot-de-soto-ks, retrieved October 29, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.De Soto advances $3.1B data center project near Panasonic plant · Johnson County Post · retrieved July 6, 2026
- 2.Beale targets two campuses outside Kansas City, Kansas · Data Center Dynamics · retrieved July 6, 2026
- 3.De Soto's approved data center project doubles in size from initial designs · Johnson County Post · retrieved October 21, 2026
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us