Project Bluestem is a proposed data center in Tonganoxie, Kansas (Leavenworth County), operated by Cloverleaf Infrastructure. The public record puts it at 1.2 GW planned, 1,000 acres. It faces documented, organized local opposition.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Proposed

Operator
Cloverleaf Infrastructure
Facility type
Data center
Location
Tonganoxie, Leavenworth County, KS
Coordinates
39.1097, -95.0877 (approximate)
Power capacity
1.2 GW planned
Land
1,000 acres
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Evergy
Cooling
Closed loop
Water use
Not established from a public source
Jobs
200 permanent; 1,000 construction
Public subsidy
Not established from a public source
Community reception
Opposed
Source confidence
Reported by at least one credible outlet or filing

Opposition and litigation at this site

Yes. Organized local opposition to Project Bluestem in Tonganoxie, Leavenworth County, Kansas is documented in the public record, without a lawsuit on file in the sources we track. Organized local opposition.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

How the community has taken it

Reception is a sourced signal, not an editorial judgment: opposed means documented, organized local opposition is the dominant signal on record.

Organized local opposition. More than 1,000 people attended a Leavenworth County special meeting at the Tonganoxie Fairgrounds on 2026-09-16 for neighbor input; roughly 65 residents spoke and comments were predominantly against the project. Two opposition groups are named in reporting: the Tongie Data Center Watch Dog Group and Citizens Against Bluestem. Residents previously petitioned for an 18-month moratorium on data centers, and a temporary moratorium expired in August 2026. Stated concerns include noise, energy use, water use, property values, waste heat, and the site's proximity, reported as 1 to 1.5 miles, to Tonganoxie's elementary and middle schools and a nursing home.

Source: Lawrence Journal-World

Power and water

Cloverleaf states Evergy is conducting a power study for the project and that the developer will fund any power and transmission upgrades required. The revised proposal adds an on-site gas power plant; Cloverleaf's FAQ frames on-site generation as being evaluated to supply the grid rather than the project directly, while local reporting describes the gas plant as sited near Tonganoxie's schools. On-site nuclear is explicitly not under consideration. energy.source is left unset because the grid/on-site split is unresolved in the sources.

Developer claim, not independently verified: Cloverleaf states a closed-loop cooling system requiring a one-time fill, with day-to-day water use limited to domestic purposes (sinks, toilets, kitchens, sprinklers) and comparable to a typical office building. Water use is among the concerns residents raised at the September 2026 public forum.

Notes on the record

Proposed hyperscale data center campus on the former Tailgate Ranch in unincorporated Leavenworth County, south of Tonganoxie and south of the Tonganoxie Business Park, near the Tonganoxie/Eudora interchange on I-70. Reported as roughly 1,000 acres (KSHB; the Lawrence Journal-World writes "more than 1,000 acres" and the community lead that surfaced this record claimed 1,100 acres, no source seen states 1,100, so 1,000 is recorded and the discrepancy is noted here). KSHB reports 330 acres set aside for permanent land conservation. The planned capacity recorded here is the reported ceiling: a revised proposal submitted after Leavenworth County's data center moratorium expired in August 2026 roughly doubled the project's electricity demand to "up to 1.2 gigawatts" and added an on-site gas power plant; a lower figure appears in one Journal-World reference ("600-watt data center", evidently a units error in the source) and is not used. Location precision is approximate: no source seen states coordinates, a street address or a parcel, so the pin is the Tonganoxie town centroid (OpenStreetMap/Nominatim) and the actual footprint lies some distance south of it. Cloverleaf Infrastructure, a Houston-based developer founded by former Microsoft energy executives, describes itself as a site-preparation developer that will introduce an end user later; no hyperscale tenant has been named. Cloverleaf's own site describes a "multi-billion-dollar taxable investment" but states no dollar figure, so investmentUsd is omitted. As of 2026-09-23 the project is conceptual: Cloverleaf's FAQ states no formal applications have been submitted to local jurisdictions, and the county's data center planning and zoning regulations are not finalized.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Tax abatements or other public subsidy
Which document closes each gap
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Free case review

Living near Project Bluestem?

Tell us the basics and an independent attorney handling data center cases in your state will follow up. Free, and you are never obligated to hire anyone.

Questions people ask about this site

Is there opposition to the Project Bluestem data center in Tonganoxie?

Yes. Organized local opposition to Project Bluestem in Tonganoxie, Leavenworth County, Kansas is documented in the public record, without a lawsuit on file in the sources we track. Organized local opposition.

Has anyone filed a lawsuit over the Project Bluestem data center?

No lawsuit over Project Bluestem appears in the record we track as of September 23, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Project Bluestem use?

No water withdrawal figure for Project Bluestem is on record here. Cooling is recorded as closed_loop, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.

Who operates Project Bluestem, and how big is it?

Cloverleaf Infrastructure is the operator on record. We hold 10 sites for that company across the registry. Capacity on record is 1.2 GW. The site is recorded at 1000 acres.

How to cite this page

SueDataCenters.org Data Center Registry, "Project Bluestem," updated September 23, 2026, https://suedatacenters.org/data-centers/cloverleaf-bluestem-tonganoxie-ks.

Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/cloverleaf-bluestem-tonganoxie-ks, retrieved October 1, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Home - Project Bluestem · Cloverleaf Infrastructure · retrieved September 23, 2026
  2. 2.FAQs - Project Bluestem · Cloverleaf Infrastructure · retrieved September 23, 2026
  3. 3.Leavenworth County to host special meeting for neighbor input on 1,000-acre data center proposal · KSHB 41 Kansas City · retrieved September 23, 2026
  4. 4.More than 1,000 people attend Tonganoxie meeting to oppose proposed data center · Lawrence Journal-World · retrieved September 23, 2026
  5. 5.Tonganoxie neighbors brace as data center plan doubles its power demand · Hoodline · retrieved September 23, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us