Edina, Hennepin County, Minnesota · All 29 DataBank sites

OperatingNo reception on recordRecord updated September 18, 2026

DataBank West Twin Cities Data Center (MSP1) is an operating data center in Edina, Minnesota (Hennepin County), operated by DataBank. The public record puts it at 1.35 MW operating.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Operating

Operator
DataBank
Facility type
Data center
Location
7700 France Avenue South, Edina, Hennepin County, MN, 55435
Coordinates
44.8628, -93.3306 (approximate)
Power capacity
1.35 MW operating
Land
Not established from a public source
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Not established from a public source
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Confirmed by multiple independent sources or official documentation

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. September 18, 2026
    Operating
    Listed as an operating facility on DataBank's own Minneapolis market page and registered in PeeringDB. Source: DataBank

Opposition and litigation at this site

Nothing on record as of September 18, 2026. No lawsuit, organized opposition, or contested hearing over DataBank West Twin Cities Data Center (MSP1) in Edina, Hennepin County, Minnesota appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

Notes on the record

DataBank publishes "26,240 IT Square Feet" and "1.35MW Critical IT Load" for MSP1. Distinct from DataBank's Eagan (MSP2) and Brooklyn Park (MSP3) sites already tracked, and from its MSP4 suite in the 511 Building.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
  • Which utility serves it
Which document closes each gap
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Free case review

Living near DataBank West Twin Cities Data Center (MSP1)?

Tell us the basics and an independent attorney handling data center cases in your state will follow up. Free, and you are never obligated to hire anyone.

Questions people ask about this site

Is there opposition to the DataBank West Twin Cities Data Center (MSP1) in Edina?

Nothing on record as of September 18, 2026. No lawsuit, organized opposition, or contested hearing over DataBank West Twin Cities Data Center (MSP1) in Edina, Hennepin County, Minnesota appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the DataBank West Twin Cities Data Center (MSP1)?

No lawsuit over DataBank West Twin Cities Data Center (MSP1) appears in the record we track as of September 18, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does DataBank West Twin Cities Data Center (MSP1) use?

No water withdrawal figure for DataBank West Twin Cities Data Center (MSP1) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates DataBank West Twin Cities Data Center (MSP1), and how big is it?

DataBank is the operator on record. We hold 29 sites for that company across the registry. Capacity on record is 1.35 MW.

How to cite this page

SueDataCenters.org Data Center Registry, "DataBank West Twin Cities Data Center (MSP1)," updated September 18, 2026, https://suedatacenters.org/data-centers/databank-west-twin-cities-edina-mn.

Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/databank-west-twin-cities-edina-mn, retrieved October 1, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.DataBank, Minneapolis data centers (MSP1 Edina: 26,240 IT sq ft, 1.35 MW critical IT load) · DataBank · retrieved September 18, 2026
  2. 2.PeeringDB facility registry, DataBank Minneapolis (MSP1), 7700 France Avenue South, Edina MN 55435 · PeeringDB · retrieved September 18, 2026
  3. 3.OpenStreetMap/Nominatim geocode, 7700 France Avenue South, Pentagon Park, Edina MN 55435 · OpenStreetMap contributors · retrieved September 18, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us