Atomic Data Minneapolis Central (MSP250) is an operating data center in Minneapolis, Minnesota (Hennepin County), operated by Atomic Data LLC.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Operating

Operator
Atomic Data LLC
Facility type
Data center
Location
250 Marquette Avenue South, Minneapolis, Hennepin County, MN, 55401
Coordinates
44.9808, -93.2674
Power capacity
Not established from a public source
Land
Not established from a public source
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Not established from a public source
Cooling
Closed loop
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Confirmed by multiple independent sources or official documentation

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. September 18, 2026
    Operating
    Listed by Atomic Data as its flagship operating facility and registered in PeeringDB as "Atomic Data MSP250". Source: Atomic Data LLC

Opposition and litigation at this site

Nothing on record as of September 18, 2026. No lawsuit, organized opposition, or contested hearing over Atomic Data Minneapolis Central (MSP250) in Minneapolis, Hennepin County, Minnesota appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

Power and water

Atomic Data publishes "Dual UPS fed racks, redundant grid entrances, and auto transfer switch", plus "a 1,200 horsepower Caterpillar® generator" with fuel reserves for "20 days".

Atomic Data publishes an "N+1 HVAC system with dedicated chilled water loop", a recirculating water circuit, recorded as closed_loop per the water-circuit tie-breaker rather than as "air".

Notes on the record

Atomic Data lists three facilities, "Minneapolis Central, MN", "Minneapolis East, MN" and "Dallas, TX", and publishes a street address only for Minneapolis Central. The Minneapolis East site is deliberately not recorded here: no address or coordinates are published and none may be invented. Square footage and MW are not published. OpenStreetMap carries a node explicitly named "Atomic Data" at this address.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Power capacity in megawatts
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
  • Which utility serves it
Which document closes each gap
Power capacity in megawatts
The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Free case review

Living near Atomic Data Minneapolis Central (MSP250)?

Tell us the basics and an independent attorney handling data center cases in your state will follow up. Free, and you are never obligated to hire anyone.

Questions people ask about this site

Is there opposition to the Atomic Data Minneapolis Central (MSP250) data center in Minneapolis?

Nothing on record as of September 18, 2026. No lawsuit, organized opposition, or contested hearing over Atomic Data Minneapolis Central (MSP250) in Minneapolis, Hennepin County, Minnesota appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the Atomic Data Minneapolis Central (MSP250) data center?

No lawsuit over Atomic Data Minneapolis Central (MSP250) appears in the record we track as of September 18, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Atomic Data Minneapolis Central (MSP250) use?

No water withdrawal figure for Atomic Data Minneapolis Central (MSP250) is on record here. Cooling is recorded as closed_loop, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.

Who operates Atomic Data Minneapolis Central (MSP250), and how big is it?

Atomic Data LLC is the operator on record. No capacity figure is on record for this site.

How to cite this page

SueDataCenters.org Data Center Registry, "Atomic Data Minneapolis Central (MSP250)," updated September 18, 2026, https://suedatacenters.org/data-centers/atomic-data-minneapolis-central-mn.

Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/atomic-data-minneapolis-central-mn, retrieved October 1, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Atomic Data, Infrastructure (Minneapolis Central at 250 Marquette Ave S., chilled water loop, generator, 99.999% uptime) · Atomic Data LLC · retrieved September 18, 2026
  2. 2.PeeringDB facility registry, Atomic Data MSP250, 250 Marquette Ave, Minneapolis MN 55401 · PeeringDB · retrieved September 18, 2026
  3. 3.OpenStreetMap/Nominatim geocode, "Atomic Data", 250 Marquette Avenue, Minneapolis MN 55401 (Marquette Plaza) · OpenStreetMap contributors · retrieved September 18, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us