865 Embedded Way Data Center (Oppidan / Rockpoint) is a proposed data center in San Jose, California (Santa Clara County), operated by Oppidan (with Rockpoint Group). The public record puts it at announced August 2026, 18 MW planned, 10 acres.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Proposed
- Operator
- Oppidan (with Rockpoint Group)
- Facility type
- Data center
- Location
- 865 Embedded Way, San Jose, Santa Clara County, CA, 95138
- Coordinates
- 37.2674, -121.7936 (approximate)
- Power capacity
- 18 MW planned
- Land
- 10 acres
- Investment
- Not established from a public source
- Announced
- August 2026
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Confirmed by multiple independent sources or official documentation
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- August 3, 2026ProposedSpecial Use Permit SP26-020 submitted 2026-08-03 for a two-story 152,676 sq ft data center with an 18 MW generator yard and 18 MW of on-site electrical capacity on a ~10-acre vacant parcel near Embedded Way and Hellyer Avenue (Edenvale), replacing a dormant manufacturing plan. Source: City of San José Planning Division
Opposition and litigation at this site
Nothing on record as of September 21, 2026. No lawsuit, organized opposition, or contested hearing over 865 Embedded Way Data Center (Oppidan / Rockpoint) in San Jose, Santa Clara County, California appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
Rockpoint Group bought the parcel in 2022; Oppidan is the applicant. Site is next to Coyote Creek, ~1.3 miles from PG&E's Santa Teresa substation per The Real Deal.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- How the community has received it
- Which utility serves it
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- 5601 Great Oaks Parkway Data Center (Menlo Equities, Charlotte Drive) · San Jose · Menlo Equities1 mi · Proposed · 100 MW
- Prologis Silver Creek Valley Road Data Center · San Jose · Prologis1 mi · Proposed · 99 MW
- Prologis 5853 Rue Ferrari · San Jose · Prologis2 mi · Permitted · 49 MW · Supported
- Equinix SV1 · San Jose · Equinix2 mi · Operating
- Equinix Great Oaks South Data Center (SV12, SV18, SV19) · San Jose · Equinix2 mi · Permitted
- Westbank 300 South First Street Data Center (downtown San José) · San Jose · Westbank7 mi · Proposed
- Westbank 180 Park Avenue Data Center (Park Habitat site, downtown San José) · San Jose · Westbank / Urban Community7 mi · Proposed
- CoreSite SV1 - San Jose, CA · San Jose · CoreSite7 mi · Operating
Questions people ask about this site
Is there opposition to the 865 Embedded Way Data Center (Oppidan / Rockpoint) in San Jose?
Nothing on record as of September 21, 2026. No lawsuit, organized opposition, or contested hearing over 865 Embedded Way Data Center (Oppidan / Rockpoint) in San Jose, Santa Clara County, California appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the 865 Embedded Way Data Center (Oppidan / Rockpoint)?
No lawsuit over 865 Embedded Way Data Center (Oppidan / Rockpoint) appears in the record we track as of September 21, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does 865 Embedded Way Data Center (Oppidan / Rockpoint) use?
No water withdrawal figure for 865 Embedded Way Data Center (Oppidan / Rockpoint) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates 865 Embedded Way Data Center (Oppidan / Rockpoint), and how big is it?
Oppidan (with Rockpoint Group) is the operator on record. We hold 4 sites for that company across the registry. Capacity on record is 18 MW. The site is recorded at 10 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "865 Embedded Way Data Center (Oppidan / Rockpoint)," updated September 21, 2026, https://suedatacenters.org/data-centers/oppidan-rockpoint-865-embedded-way-san-jose-ca.
Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/oppidan-rockpoint-865-embedded-way-san-jose-ca, retrieved October 1, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.City of San José, Data Center and other Large Energy-Use Projects (application list updated 2026-07-13; Wayback capture 2026-08-13) · City of San José Planning Division · retrieved September 21, 2026
- 2.Menlo Equities, Oppidan next in line for data center projects in San Jose (2026-08-10) · The Real Deal · retrieved September 21, 2026
- 3.Rockpoint, Oppidan swap manufacturing plans for 152,676 SQFT data center in South San Jose (2026-08-13) · The Registry · retrieved September 21, 2026
- 4.San José weighs data center benefits as residents raise environmental concerns (2026-08-13) · KQED · retrieved September 21, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us