5601 Great Oaks Parkway Data Center (Menlo Equities, Charlotte Drive)

San Jose, Santa Clara County, California · All 3 Menlo Equities sites

ProposedNo reception on recordRecord updated September 21, 2026

5601 Great Oaks Parkway Data Center (Menlo Equities, Charlotte Drive) is a proposed data center in San Jose, California (Santa Clara County), operated by Menlo Equities. The public record puts it at announced August 2026, 100 MW planned.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Proposed

Operator
Menlo Equities
Facility type
Data center
Location
5601 Great Oaks Parkway, San Jose, Santa Clara County, CA, 95119
Coordinates
37.2503, -121.7944 (approximate)
Power capacity
100 MW planned
Land
Not established from a public source
Investment
Not established from a public source
Announced
August 2026
Utility
Not established from a public source
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Confirmed by multiple independent sources or official documentation

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. August 10, 2026
    Proposed
    Special Use Permit SP26-022 (pending intake on the city's July 2026 list) for a 444,436 sq ft data center with on-site substation and publicly accessible open space on a portion of Western Digital's South San José campus along Charlotte Drive; ~100 MW at full build per The Real Deal. Source: The Real Deal

Opposition and litigation at this site

Nothing on record as of September 21, 2026. No lawsuit, organized opposition, or contested hearing over 5601 Great Oaks Parkway Data Center (Menlo Equities, Charlotte Drive) in San Jose, Santa Clara County, California appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

Notes on the record

Proposed on Charlotte Drive between Lexington Avenue and Raleigh Road, industrial-zoned land within Western Digital's tech campus; The Real Deal reports the project would require nearly 100 MW once complete. Coordinates are a street-level geocode of Great Oaks Parkway (approximate).

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
  • Which utility serves it
Which document closes each gap
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Free case review

Living near 5601 Great Oaks Parkway Data Center (Menlo Equities, Charlotte Drive)?

Tell us the basics and an independent attorney handling data center cases in your state will follow up. Free, and you are never obligated to hire anyone.

Questions people ask about this site

Is there opposition to the 5601 Great Oaks Parkway Data Center (Menlo Equities, Charlotte Drive) in San Jose?

Nothing on record as of September 21, 2026. No lawsuit, organized opposition, or contested hearing over 5601 Great Oaks Parkway Data Center (Menlo Equities, Charlotte Drive) in San Jose, Santa Clara County, California appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the 5601 Great Oaks Parkway Data Center (Menlo Equities, Charlotte Drive)?

No lawsuit over 5601 Great Oaks Parkway Data Center (Menlo Equities, Charlotte Drive) appears in the record we track as of September 21, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does 5601 Great Oaks Parkway Data Center (Menlo Equities, Charlotte Drive) use?

No water withdrawal figure for 5601 Great Oaks Parkway Data Center (Menlo Equities, Charlotte Drive) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates 5601 Great Oaks Parkway Data Center (Menlo Equities, Charlotte Drive), and how big is it?

Menlo Equities is the operator on record. We hold 3 sites for that company across the registry. Capacity on record is 100 MW.

How to cite this page

SueDataCenters.org Data Center Registry, "5601 Great Oaks Parkway Data Center (Menlo Equities, Charlotte Drive)," updated September 21, 2026, https://suedatacenters.org/data-centers/menlo-equities-great-oaks-parkway-san-jose-ca.

Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/menlo-equities-great-oaks-parkway-san-jose-ca, retrieved October 1, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.City of San José, Data Center and other Large Energy-Use Projects (application list updated 2026-07-13; Wayback capture 2026-08-13) · City of San José Planning Division · retrieved September 21, 2026
  2. 2.Menlo Equities, Oppidan next in line for data center projects in San Jose (2026-08-10) · The Real Deal · retrieved September 21, 2026
  3. 3.San José weighs data center benefits as residents raise environmental concerns (2026-08-13) · KQED · retrieved September 21, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us