Sue Data Centers

Data Center Registry

DataBank LGA3 (Orangeburg Data Center Campus)

Orangeburg, Rockland County, New York · All 23 DataBank sites

OperatingNo reception on recordRecord updated September 13, 2026

DataBank LGA3 (Orangeburg Data Center Campus) is an operating data center in Orangeburg, New York (Rockland County), operated by DataBank. The public record puts it at 40 MW planned.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Operating

Operator
DataBank
Facility type
Data center
Location
2000 Corporate Dr., Orangeburg, Rockland County, NY
Coordinates
41.0373, -73.9879 (approximate)
Power capacity
20 MW operating; 40 MW planned
Land
Not established from a public source
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Not established from a public source
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Confirmed by multiple independent sources or official documentation

Opposition and litigation at this site

Nothing on record as of September 13, 2026. No lawsuit, organized opposition, or contested hearing over DataBank LGA3 (Orangeburg Data Center Campus) in Orangeburg, Rockland County, New York appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

Notes on the record

DataBank's third metro-NYC facility, described by DataBank's own site (fetched 2026-09-13) as 20 MW critical IT load operational across 110,000 IT sq ft, with the full campus planned to reach 40 MW / 200,000 sq ft across 5 data halls. Data Center Frontier's trade-press coverage states different figures for the same campus (30 MW initially available with planned expansion to 45 MW, 200,000 sq ft at full build-out) -- both figures are reported here rather than reconciled; the operator's own current site is treated as the more current figure for the operational MW. A second planned facility, LGA4, is also referenced by Data Center Frontier at 45 MW but not yet named on DataBank's own site as of this fetch -- omitted as a separate record since it is not yet independently confirmed as a distinct, addressable site. Data Center Frontier ties the campus's HPC/AI-oriented data-hall design to New York's Empire AI Consortium initiative, but does not name a specific AI tenant or offtaker at this site -- aiClassification omitted rather than guessed (colocation is multi-tenant and general-purpose). Distinct from the existing bloomberg-orangeburg-ny and the newly-added jpmorgan-chase-orangeburg-ny records -- three separate Orangeburg, Rockland County data-center campuses. Coordinates geocoded from the street address via US Census geocoder (address-range interpolation, not a confirmed parcel), hence approximate precision.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
  • Which utility serves it
Which document closes each gap
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Questions people ask about this site

Is there opposition to the DataBank LGA3 (Orangeburg Data Center Campus) in Orangeburg?

Nothing on record as of September 13, 2026. No lawsuit, organized opposition, or contested hearing over DataBank LGA3 (Orangeburg Data Center Campus) in Orangeburg, Rockland County, New York appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the DataBank LGA3 (Orangeburg Data Center Campus)?

No lawsuit over DataBank LGA3 (Orangeburg Data Center Campus) appears in the record we track as of September 13, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does DataBank LGA3 (Orangeburg Data Center Campus) use?

No water withdrawal figure for DataBank LGA3 (Orangeburg Data Center Campus) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates DataBank LGA3 (Orangeburg Data Center Campus), and how big is it?

DataBank is the operator on record. We hold 23 sites for that company across the registry. Capacity on record is 40 MW.

How to cite this page

SueDataCenters.org Data Center Registry, "DataBank LGA3 (Orangeburg Data Center Campus)," updated September 13, 2026, https://suedatacenters.org/data-centers/databank-lga3-orangeburg-ny.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/databank-lga3-orangeburg-ny, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.LGA3 / Orangeburg Data Center · DataBank · retrieved September 13, 2026
  2. 2.DataBank's Orangeburg Data Center Campus Targets AI for the Empire State · Data Center Frontier · retrieved September 13, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us