OperatingNo reception on recordRecord updated August 16, 2026

Bloomberg LP Data Center is an operating data center in Orangeburg, New York (Rockland County), operated by Bloomberg LP. The public record puts it at 50 MW planned, a reported $123 million investment.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Operating

Operator
Bloomberg LP
Facility type
Data center
Location
Orangeburg, Rockland County, NY
Coordinates
41.0367, -73.9868 (approximate)
Power capacity
4 MW operating; 50 MW planned
Land
Not established from a public source
Investment
$123 million
Announced
Not established from a public source
Utility
Grid-connected
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Confirmed by multiple independent sources or official documentation

Opposition and litigation at this site

Nothing on record as of August 16, 2026. No lawsuit, organized opposition, or contested hearing over Bloomberg LP Data Center in Orangeburg, Rockland County, New York appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

Notes on the record

155 Corporate Drive, Orangeburg, NY (Town of Orangetown, Rockland County). 131,805 sq ft total, two data halls totaling 39,058 sq ft with 42" raised floor and 26' clear height, 4.0 MW power system, 1,200-ton cooling capacity, all per an authoritative SEC EDGAR CMBS filing (2014). Construction cost was $123.2M ($935/sq ft) per that same filing, with Bloomberg contributing $39.0M toward construction; recorded here as investmentUsd rather than the frequently-cited $710M figure, which represents total lease payments over a 15-year term (expiring March 2029), not construction capital, those are not comparable numbers and conflating them would overstate the capital investment. Dedicated single-tenant enterprise facility built to Bloomberg's spec for its financial data/analytics terminals (not shared colocation), built/topped-off 2013-2014. No expansions since 2014 were found in this research pass, but absence of news is not proof of none. Coordinates are a town-level geocode, not a confirmed parcel pin.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
Which document closes each gap
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Questions people ask about this site

Is there opposition to the Bloomberg LP Data Center in Orangeburg?

Nothing on record as of August 16, 2026. No lawsuit, organized opposition, or contested hearing over Bloomberg LP Data Center in Orangeburg, Rockland County, New York appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the Bloomberg LP Data Center?

No lawsuit over Bloomberg LP Data Center appears in the record we track as of August 16, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Bloomberg LP Data Center use?

No water withdrawal figure for Bloomberg LP Data Center is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates Bloomberg LP Data Center, and how big is it?

Bloomberg LP is the operator on record. Capacity on record is 50 MW.

How to cite this page

SueDataCenters.org Data Center Registry, "Bloomberg LP Data Center," updated August 16, 2026, https://suedatacenters.org/data-centers/bloomberg-orangeburg-ny.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/bloomberg-orangeburg-ny, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.WFRBS Commercial Mortgage Trust 2014-C20 FWP (Bloomberg Orangeburg facility disclosure) · SEC EDGAR · retrieved July 10, 2026
  2. 2.Bloomberg Plans $710 Million Data Center in N.Y. Suburb · Data Center Knowledge · retrieved July 10, 2026
  3. 3.Bloomberg Tops Off New Datacenter · Rockland County Times · retrieved July 10, 2026
  4. 4.Bloomberg Plans $710 Million Data Center in N.Y. Suburb · Data Center Knowledge · retrieved August 16, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us