Treetop East Fishkill Data Center (proposed, no application filed) is a proposed data center in East Fishkill, New York (Dutchess County), operated by Treetop Development. The public record puts it at 1 GW planned. It faces documented, organized local opposition. The record for this site rests on a single unverified source and should be read that way.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Proposed

Operator
Treetop Development
Facility type
Data center, AI use likely
Location
East Fishkill, Dutchess County, NY
Coordinates
41.5340, -73.8010 (approximate)
Power capacity
1 GW planned
Land
Not established from a public source
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Not established from a public source
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
Opposed
Source confidence
Rumored: a single unverified source

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. June 2026
    Proposed
    East Fishkill Town Board passed a three-year moratorium on data centers, June 25, 2026. Source: A Little Beacon Blog
  2. May 2025
    Proposed
    Town Supervisor Nicholas D'Alessandro stated that "no site plan, special permit application, zoning request, or other development application has been submitted to the town for review." Source: cicbca.org

Opposition and litigation at this site

Yes. Organized local opposition to Treetop East Fishkill Data Center (proposed, no application filed) in East Fishkill, Dutchess County, New York is documented in the public record, without a lawsuit on file in the sources we track. The East Fishkill Town Board "voted unanimously to pass" a three-year moratorium on data centers on June 25, 2026, following organised resident opposition; advocacy groups have used the fight to campaign for a statewide Responsible Data Center Development Act.

How the community has taken it

Reception is a sourced signal, not an editorial judgment: opposed means documented, organized local opposition is the dominant signal on record.

The East Fishkill Town Board "voted unanimously to pass" a three-year moratorium on data centers on June 25, 2026, following organised resident opposition; advocacy groups have used the fight to campaign for a statewide Responsible Data Center Development Act.

Source: A Little Beacon Blog

Notes on the record

⚠️ LOW-CERTAINTY BY CONSTRUCTION - included because a 1,000 MW load is the largest proposed in New York found in this run, and excluded fields say why. confidence is 'rumored' and status 'proposed' rather than 'cancelled': the town supervisor confirmed on May 11, 2025 that "no site plan, special permit application, zoning request, or other development application has been submitted to the town for review," and the developer "has never submitted a formal application for the project nor a site plan" - yet the project was still described as under evaluation in the NYISO process when the town passed its moratorium on June 25, 2026, so it is not affirmatively dead either. Teaneck, NJ-based Treetop Development is evaluating converting land currently planned for "a 1,161,515 SF warehouse" (scaled down to 765,000 square feet in other reporting) into "a 1,000-megawatt (1-gigawatt) data center." capacityMw.planned = 1000 is that stated figure, unconverted. Confirmed absences (2026-09-09): NEITHER fetched source gives a street, parcel, acreage, square footage for the data center itself, investment, job count, water figure, utility, or subsidy agreement; secondary reporting places the site "off of I-84 and Lime Kiln Road" but that was NOT verified in a fetched source, so no street is recorded and coordinates are a TOWN-LEVEL placeholder for East Fishkill, Dutchess County. If the maintainer's bar is a filed application, this record should be dropped.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • Which utility serves it
Which document closes each gap
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Questions people ask about this site

Is there opposition to the Treetop East Fishkill Data Center (proposed, no application filed) in East Fishkill?

Yes. Organized local opposition to Treetop East Fishkill Data Center (proposed, no application filed) in East Fishkill, Dutchess County, New York is documented in the public record, without a lawsuit on file in the sources we track. The East Fishkill Town Board "voted unanimously to pass" a three-year moratorium on data centers on June 25, 2026, following organised resident opposition; advocacy groups have used the fight to campaign for a statewide Responsible Data Center Development Act.

Has anyone filed a lawsuit over the Treetop East Fishkill Data Center (proposed, no application filed)?

No lawsuit over Treetop East Fishkill Data Center (proposed, no application filed) appears in the record we track as of September 9, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Treetop East Fishkill Data Center (proposed, no application filed) use?

No water withdrawal figure for Treetop East Fishkill Data Center (proposed, no application filed) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates Treetop East Fishkill Data Center (proposed, no application filed), and how big is it?

Treetop Development is the operator on record. Capacity on record is 1 GW.

How to cite this page

SueDataCenters.org Data Center Registry, "Treetop East Fishkill Data Center (proposed, no application filed)," updated September 9, 2026, https://suedatacenters.org/data-centers/treetop-east-fishkill-ny.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/treetop-east-fishkill-ny, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.East Fishkill Supervisor Pulls Plug On Plan to Build Big Data Center · cicbca.org · retrieved September 9, 2026
  2. 2.By Unanimous Vote, East Fishkill Town Board Passes 3 Year Moratorium On Data Centers · A Little Beacon Blog · retrieved September 9, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us