Sue Data Centers

Data Center Registry

Centersquare Shakopee (MSP1 Campus)

Shakopee, Scott County, Minnesota · All 14 Centersquare sites · Every QTS and Compass Datacenters case on our tracker

OperatingNo reception on recordRecord updated September 18, 2026

Centersquare Shakopee (MSP1 Campus) is an operating data center in Shakopee, Minnesota (Scott County), operated by Centersquare (fka Cyxtera / Evoque; site originally built by Compass Datacenters). The public record puts it at 19.1 MW operating.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Operating

Operator
Centersquare (fka Cyxtera / Evoque; site originally built by Compass Datacenters)
Facility type
Data center
Location
4450 Dean Lakes Blvd., Shakopee, Scott County, MN, 55379
Coordinates
44.7965, -93.4820 (approximate)
Power capacity
19.1 MW operating
Land
Not established from a public source
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Not established from a public source
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Confirmed by multiple independent sources or official documentation

Opposition and litigation at this site

Nothing on record as of September 18, 2026. No lawsuit, organized opposition, or contested hearing over Centersquare Shakopee (MSP1 Campus) in Shakopee, Scott County, Minnesota appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

Notes on the record

4450 Dean Lakes Boulevard, Shakopee, MN 55379. Built by Compass Datacenters (Phase 1, 1.2MW, opened 2014, originally for Savvis/CenturyLink, ~$26M). Passed to Cyxtera (2017, via $2.8B CenturyLink data-center-portfolio deal), then to Evoque, then rebranded Centersquare in April 2024 after Evoque closed its acquisition of Cyxtera's portfolio. Own site (csquare.com) states 'Utility power: 19.1MW' with separate, smaller UPS (2.4MW) and generator (3.6MW) figures listed, those smaller numbers likely describe currently-installed backup for built-out suites, not total site capacity; used the 19.1MW utility-power figure as capacityMw.operational but flagging the discrepancy for a human sanity-check. 29,800 sq ft raised floor (~28,900 to 30,000 sq ft consistently reported). Compass's original master plan included 3 more 25,000 sq ft buildings (~$90M), unclear if built out; not counted here.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
  • Which utility serves it
Which document closes each gap
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Free case review

Living near Centersquare Shakopee (MSP1 Campus)?

Tell us the basics and an independent attorney handling data center cases in your state will follow up. Free, and you are never obligated to hire anyone.

Questions people ask about this site

Is there opposition to the Centersquare Shakopee (MSP1 Campus) in Shakopee?

Nothing on record as of September 18, 2026. No lawsuit, organized opposition, or contested hearing over Centersquare Shakopee (MSP1 Campus) in Shakopee, Scott County, Minnesota appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the Centersquare Shakopee (MSP1 Campus)?

No lawsuit over Centersquare Shakopee (MSP1 Campus) appears in the record we track as of September 18, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Centersquare Shakopee (MSP1 Campus) use?

No water withdrawal figure for Centersquare Shakopee (MSP1 Campus) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates Centersquare Shakopee (MSP1 Campus), and how big is it?

Centersquare (fka Cyxtera / Evoque; site originally built by Compass Datacenters) is the operator on record. We hold 14 sites for that company across the registry. Capacity on record is 19.1 MW.

How to cite this page

SueDataCenters.org Data Center Registry, "Centersquare Shakopee (MSP1 Campus)," updated September 18, 2026, https://suedatacenters.org/data-centers/centersquare-shakopee-mn.

Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/centersquare-shakopee-mn, retrieved October 1, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Top Minneapolis Colocation Data Centers | Power Available | Csquare · Centersquare / Csquare (official) · retrieved September 18, 2026
  2. 2.PeeringDB facility registry, Centersquare Minneapolis (MSP1), 4450 Dean Lakes Blvd., Shakopee MN 55379 · PeeringDB · retrieved September 18, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us