Data Center Registry
Centersquare Shakopee (MSP1 Campus)
Shakopee, Scott County, Minnesota · All 17 Centersquare sites · Every QTS and Compass Datacenters case on our tracker
Centersquare Shakopee (MSP1 Campus) is an operating data center in Shakopee, Minnesota (Scott County), operated by Centersquare (fka Cyxtera / Evoque; site originally built by Compass Datacenters).
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- Centersquare (fka Cyxtera / Evoque; site originally built by Compass Datacenters)
- Facility type
- Data center
- Location
- 4450 Dean Lakes Blvd., Shakopee, Scott County, MN, 55379
- Coordinates
- 44.7965, -93.4820 (approximate)
- Power capacity
- Not established from a public source
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Confirmed by multiple independent sources or official documentation
Opposition and litigation at this site
Nothing on record as of October 28, 2026. No lawsuit, organized opposition, or contested hearing over Centersquare Shakopee (MSP1 Campus) in Shakopee, Scott County, Minnesota appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
4450 Dean Lakes Boulevard, Shakopee, MN 55379. Built by Compass Datacenters (Phase 1, 1.2MW, opened 2014, originally for Savvis/CenturyLink, ~$26M). Passed to Cyxtera (2017, via $2.8B CenturyLink data-center-portfolio deal), then to Evoque, then rebranded Centersquare in April 2024 after Evoque closed its acquisition of Cyxtera's portfolio. Own site (csquare.com) states 'Utility power: 19.1MW' with separate, smaller UPS (2.4MW) and generator (3.6MW) figures listed, the smaller numbers likely describe currently-installed backup for built-out suites. The 19.1 MW figure is utility power, not an IT capacity, so no operational capacity is recorded. 29,800 sq ft raised floor (~28,900 to 30,000 sq ft consistently reported). Compass's original master plan included 3 more 25,000 sq ft buildings (~$90M), unclear if built out; not counted here.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Shakopee Hyperscale Data Center Campus (NorthStar Digital Infrastructure) · Shakopee · NorthStar Digital Infrastructure LLC2 mi · Proposed · 80 MW
- UHG Chaska Data Center · Chaska · UnitedHealth Group6 mi · Operating
- US Signal MN01 Minneapolis (Eden Prairie) · Eden Prairie · US Signal (site registered by OneNeck IT Solutions LLC)7 mi · Operating · 5.4 MW
- EdgeConneX Minneapolis (EDCMSP01) · Eden Prairie · EdgeConneX Inc.7 mi · Operating · 2.85 MW
- Flexential Minneapolis - Chaska (MSP01) · Chaska · Flexential7 mi · Operating · 9 MW
- CloudHQ MSP Campus (Chaska) · Chaska · CloudHQ8 mi · Permitted · 200 MW
- LightEdge Chaska (fka Stream Data Centers Minneapolis I) · Chaska · LightEdge (GI Partners)8 mi · Operating · 3.6 MW
- DataBank West Twin Cities Data Center (MSP1) · Edina · DataBank9 mi · Operating · 1.35 MW
Questions people ask about this site
Is there opposition to the Centersquare Shakopee (MSP1 Campus) in Shakopee?
Nothing on record as of October 28, 2026. No lawsuit, organized opposition, or contested hearing over Centersquare Shakopee (MSP1 Campus) in Shakopee, Scott County, Minnesota appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Centersquare Shakopee (MSP1 Campus)?
No lawsuit over Centersquare Shakopee (MSP1 Campus) appears in the record we track as of October 28, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Centersquare Shakopee (MSP1 Campus) use?
No water withdrawal figure for Centersquare Shakopee (MSP1 Campus) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Centersquare Shakopee (MSP1 Campus), and how big is it?
Centersquare (fka Cyxtera / Evoque; site originally built by Compass Datacenters) is the operator on record. We hold 17 sites for that company across the registry. No capacity figure is on record for this site.
How to cite this page
SueDataCenters.org Data Center Registry, "Centersquare Shakopee (MSP1 Campus)," updated October 28, 2026, https://suedatacenters.org/data-centers/centersquare-shakopee-mn.
Facility data from Compute Atlas (E. Kubiak), version 1.35.1 (November 2, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/centersquare-shakopee-mn, retrieved November 5, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Top Minneapolis Colocation Data Centers | Power Available | Csquare · Centersquare / Csquare (official) · retrieved September 18, 2026
- 2.PeeringDB facility registry, Centersquare Minneapolis (MSP1), 4450 Dean Lakes Blvd., Shakopee MN 55379 · PeeringDB · retrieved September 18, 2026
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us