Shakopee Hyperscale Data Center Campus (NorthStar Digital Infrastructure) is a proposed data center in Shakopee, Minnesota (Scott County), operated by NorthStar Digital Infrastructure LLC. The public record puts it at announced October 15, 2025, 80 MW planned, 160 acres, a reported $2.8 billion investment.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Proposed
- Operator
- NorthStar Digital Infrastructure LLC
- Facility type
- Data center
- Location
- Shakopee, Scott County, MN
- Coordinates
- 44.7980, -93.5269 (approximate)
- Power capacity
- 80 MW planned
- Land
- 160 acres
- Investment
- $2.8 billion
- Announced
- October 15, 2025
- Utility
- Not established from a public source
- Cooling
- Not established
- Water use
- 1.5 million gallons a day, reported
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- October 15, 2025ProposedEAW submitted to MPCA; EAW deemed complete 2025-12-02; public comment closed 2026-02-15 with 118 comments Source: State of Minnesota coordinated permitting (MPCA lead agency)
Opposition and litigation at this site
Nothing on record as of November 2, 2026. No lawsuit, organized opposition, or contested hearing over Shakopee Hyperscale Data Center Campus (NorthStar Digital Infrastructure) in Shakopee, Scott County, Minnesota appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
State dashboard estimates water use at 1.5 million gallons/day; cooling water system, method not specified; DNR water appropriation permit required
Notes on the record
Phased campus of four buildings totaling about 1.2 million sq ft on 160 acres. Phase 1 is two buildings with 80 MW of critical IT load. Plans include backup diesel generation, a cooling water system and a new substation. Estimated cost is $2.8 billion. Air permit application was targeted for 2026-06-01 and DNR water appropriation permit for 2026-09-01. No street address was published. The location is the Shakopee city centroid.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Tax abatements or other public subsidy
- Permanent jobs promised
- How the community has received it
- Which utility serves it
Which document closes each gap
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Centersquare Shakopee (MSP1 Campus) · Shakopee · Centersquare (fka Cyxtera / Evoque; site originally built by Compass Datacenters)2 mi · Operating
- UHG Chaska Data Center · Chaska · UnitedHealth Group4 mi · Operating
- Flexential Minneapolis - Chaska (MSP01) · Chaska · Flexential5 mi · Operating · 9 MW
- CloudHQ MSP Campus (Chaska) · Chaska · CloudHQ5 mi · Permitted · 200 MW
- LightEdge Chaska (fka Stream Data Centers Minneapolis I) · Chaska · LightEdge (GI Partners)6 mi · Operating · 3.6 MW
- US Signal MN01 Minneapolis (Eden Prairie) · Eden Prairie · US Signal (site registered by OneNeck IT Solutions LLC)8 mi · Operating · 5.4 MW
- EdgeConneX Minneapolis (EDCMSP01) · Eden Prairie · EdgeConneX Inc.8 mi · Operating · 2.85 MW
- DataBank West Twin Cities Data Center (MSP1) · Edina · DataBank11 mi · Operating · 1.35 MW
Questions people ask about this site
Is there opposition to the Shakopee Hyperscale Data Center Campus (NorthStar Digital Infrastructure) in Shakopee?
Nothing on record as of November 2, 2026. No lawsuit, organized opposition, or contested hearing over Shakopee Hyperscale Data Center Campus (NorthStar Digital Infrastructure) in Shakopee, Scott County, Minnesota appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Shakopee Hyperscale Data Center Campus (NorthStar Digital Infrastructure)?
No lawsuit over Shakopee Hyperscale Data Center Campus (NorthStar Digital Infrastructure) appears in the record we track as of November 2, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Shakopee Hyperscale Data Center Campus (NorthStar Digital Infrastructure) use?
1.5 million gallons a day is the reported figure on record. Cooling is recorded as unknown. State dashboard estimates water use at 1.5 million gallons/day; cooling water system, method not specified; DNR water appropriation permit required
Who operates Shakopee Hyperscale Data Center Campus (NorthStar Digital Infrastructure), and how big is it?
NorthStar Digital Infrastructure LLC is the operator on record. Capacity on record is 80 MW. The site is recorded at 160 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "Shakopee Hyperscale Data Center Campus (NorthStar Digital Infrastructure)," updated November 2, 2026, https://suedatacenters.org/data-centers/northstar-digital-shakopee-mn.
Facility data from Compute Atlas (E. Kubiak), version 1.35.1 (November 2, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/northstar-digital-shakopee-mn, retrieved November 5, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Shakopee Data Center, Minnesota coordinated permitting dashboard (MPCA/DNR) · State of Minnesota coordinated permitting (MPCA lead agency) · retrieved November 2, 2026
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us