Moses Lake Facility
Moses Lake, Grant County, Washington · All 5 Bitfarms sites
Moses Lake Facility is a crypto mining site under construction in Moses Lake, Washington (Grant County), operated by Bitfarms Ltd. (Keel Infrastructure Corp.). The public record puts it at announced November 11, 2021, 18 MW operating.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Under construction
- Operator
- Bitfarms Ltd. (Keel Infrastructure Corp.)
- Facility type
- Crypto mining, AI use likely
- Location
- Moses Lake, Grant County, WA
- Coordinates
- 47.1301, -119.2781 (approximate)
- Power capacity
- 18 MW operating
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- November 11, 2021
- Utility
- Grant County PUD
- Power source
- Hydro
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Confirmed by multiple independent sources or official documentation
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- August 22, 2026Under constructionKeel Infrastructure (formerly Bitfarms) completed decommissioning of Bitcoin mining at Moses Lake in April 2026 and, per its Q2 2026 results (published Aug 10, 2026), has begun receiving Vertiv modules and other long-lead HPC/AI construction equipment on site, with fiber contracts being finalized, the site is actively being retrofitted, not merely operating as before. Source: GlobeNewswire (via Crypto Reporter)
- November 13, 2025OperatingBitfarms announces a binding, fully-funded turnkey agreement (~$128-129M, figure dual-sourced across filings) with Vertiv Group to convert the site to HPC/AI workloads (NVIDIA GB300 reference architecture, liquid cooling, target PUE 1.2-1.3), targeting completion December 2026. As of the FY2025 10-K, the site remains an active Bitcoin-mining operation -- conversion not yet complete. Source: SEC EDGAR
- November 11, 2021OperatingBitfarms acquires a 24 MW hydro-powered Bitcoin mining facility in Moses Lake, Grant County, WA, for $26M total ($23M cash + $3M in common shares). Source: SEC EDGAR
Opposition and litigation at this site
Nothing on record as of September 10, 2026. No lawsuit, organized opposition, or contested hearing over Moses Lake Facility in Moses Lake, Grant County, Washington appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
18 MW is the current operating capacity per the FY2025 10-K property table (down from the 24 MW nameplate acquired in 2021). Powered by Grant County PUD hydroelectric power. A binding, fully-funded HPC/AI conversion agreement with Vertiv Group is disclosed -- reported as $128M in the Nov 2025 press release and $129M in the FY2025 10-K (a genuine cross-filing discrepancy, both cited); target hardware is NVIDIA GB300 (up to 190kW/rack), liquid cooling, target PUE 1.2-1.3, targeting completion December 2026. No GPUs are installed/operating as of the most recent filing -- aiClassification is 'likely,' not 'confirmed.' A widely-repeated 6-acre/~60,000 sq ft site-size claim could not be confirmed in any SEC filing and is omitted. No exact street address disclosed. Grant PUD has imposed regional load-growth limits on data-center customers and approved a 10.6% rate increase (2026-01-27) for its crypto-mining rate schedule -- a supply-constraint risk factor, not site-specific opposition. Public-reception check (2026-09-10): Checked Bitfarms' own SEC material-change report (dated 2021-11-11, filed with respect to the Moses Lake hydro-power facility acquisition, $26M/24MW); it covers only the transaction and expansion MOU, with no mention of community sentiment or local-government engagement.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Salcido Wheeler Data Center · Moses Lake · Salcido Enterprises, LLCunder 1 mile · Operating · 4.8 MW
- Vantage Quincy WA11 · Quincy · Vantage Data Centers27 mi · Operating
- Vantage WA12 · Quincy · Vantage Data Centers27 mi · Operating
- Sabey Intergate.Quincy Campus · Quincy · Sabey Data Centers27 mi · Operating · 70 MW
- Vantage WA13 · Quincy · Vantage Data Centers27 mi · Operating · 64 MW
- Salcido Horizon Data Center · Quincy · Salcido Enterprises, LLC28 mi · Operating · 4 MW
- H5 Data Centers Quincy Campus · Quincy · H5 Data Centers28 mi · Operating · 40 MW
- Salcido Fortress Data Center · Quincy · Salcido Enterprises, LLC28 mi · Operating · 4.6 MW
Questions people ask about this site
Is there opposition to the Moses Lake Facility in Moses Lake?
Nothing on record as of September 10, 2026. No lawsuit, organized opposition, or contested hearing over Moses Lake Facility in Moses Lake, Grant County, Washington appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Moses Lake Facility?
No lawsuit over Moses Lake Facility appears in the record we track as of September 10, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Moses Lake Facility use?
No water withdrawal figure for Moses Lake Facility is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Moses Lake Facility, and how big is it?
Bitfarms Ltd. (Keel Infrastructure Corp.) is the operator on record. We hold 5 sites for that company across the registry. Capacity on record is 18 MW.
How to cite this page
SueDataCenters.org Data Center Registry, "Moses Lake Facility," updated September 10, 2026, https://suedatacenters.org/data-centers/bitfarms-moses-lake-wa.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/bitfarms-moses-lake-wa, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Bitfarms Acquires 24 Megawatts of Hydro Power in the U.S. (6-K Exhibit 99.1, Nov 11, 2021) · SEC EDGAR · retrieved August 2, 2026
- 2.Bitfarms Announces Plans for Conversion of Washington Site to HPC/AI Workloads (6-K Exhibit 99.2, Nov 13, 2025) · SEC EDGAR · retrieved August 2, 2026
- 3.Keel Infrastructure Corp. (fka Bitfarms Ltd.) FY2025 Form 10-K, filed 2026-03-31 · SEC EDGAR · retrieved August 2, 2026
- 4.Keel Infrastructure Reports Second Quarter 2026 Results · GlobeNewswire (via Crypto Reporter) · retrieved August 22, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us