Sabey Intergate.Quincy Campus

Quincy, Grant County, Washington · All 11 Sabey Data Centers sites

OperatingNo reception on recordRecord updated September 5, 2026

Sabey Intergate.Quincy Campus is an operating data center in Quincy, Washington (Grant County), operated by Sabey Data Centers. The public record puts it at 70 MW operating.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Operating

Operator
Sabey Data Centers
Facility type
Data center
Location
2200 M Street NE, Quincy, Grant County, WA, 98848
Coordinates
47.2470, -119.8300 (approximate)
Power capacity
70 MW operating
Land
Not established from a public source
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Grant County PUD
Cooling
Evaporative
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Reported by at least one credible outlet or filing

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. August 18, 2026
    Operating
    Cascade PBS toured Sabey's fifth and newest building on the Quincy campus, 15 years after the company first arrived; four more data halls are planned once electricity capacity catches up. Source: Cascade PBS

Opposition and litigation at this site

Nothing on record as of September 5, 2026. No lawsuit, organized opposition, or contested hearing over Sabey Intergate.Quincy Campus in Quincy, Grant County, Washington appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

Power and water

Cascade PBS reports the entire campus is capped at 70 MW, the maximum it can draw at one time from the local utility. Sabey markets low power rates and proximity to the regional grid as siting drivers.

Sabey markets the campus's mild, dry climate as suited to efficient evaporative cooling.

Notes on the record

Sabey's Quincy campus (SDC Quincy / Intergate.Quincy), launched in 2011 at 2200 M Street NE, now spans more than 525,000 sq ft across five purpose-built buildings (A, B, D, E and one more). This is a distinct campus from Sabey's Intergate.Columbia in East Wenatchee (4405 Grant Road) already tracked, and from the Intergate.East and Intergate.West campuses in the Seattle area. Coordinates are an approximate geocode of the campus address.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
Which document closes each gap
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Questions people ask about this site

Is there opposition to the Sabey Intergate.Quincy Campus in Quincy?

Nothing on record as of September 5, 2026. No lawsuit, organized opposition, or contested hearing over Sabey Intergate.Quincy Campus in Quincy, Grant County, Washington appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the Sabey Intergate.Quincy Campus?

No lawsuit over Sabey Intergate.Quincy Campus appears in the record we track as of September 5, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Sabey Intergate.Quincy Campus use?

No water withdrawal figure for Sabey Intergate.Quincy Campus is on record here. Cooling is recorded as evaporative, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.

Who operates Sabey Intergate.Quincy Campus, and how big is it?

Sabey Data Centers is the operator on record. We hold 11 sites for that company across the registry. Capacity on record is 70 MW.

How to cite this page

SueDataCenters.org Data Center Registry, "Sabey Intergate.Quincy Campus," updated September 5, 2026, https://suedatacenters.org/data-centers/sabey-intergate-quincy-campus-wa.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/sabey-intergate-quincy-campus-wa, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Sabey: Intergate.Quincy (Building B), 2200 M Street NE, Quincy, Washington · Baxtel · retrieved September 5, 2026
  2. 2.Washington state grapples with the AI data center boom · Cascade PBS · retrieved September 5, 2026
  3. 3.Sabey Data Centers, Locations (SDC Quincy, SDC Columbia, SDC Seattle) · Sabey Data Centers · retrieved September 5, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us