Data Center Registry
Vantage WA13
Quincy, Grant County, Washington · All 20 Vantage Data Centers sites · Every Vantage Data Centers case on our tracker
Vantage WA13 is an operating data center in Quincy, Washington (Grant County), operated by Vantage Data Centers. The public record puts it at 64 MW operating.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- Vantage Data Centers
- Facility type
- Data center
- Location
- 2101 M Street NE, Quincy, Grant County, WA, 98848
- Coordinates
- 47.2470, -119.8300 (approximate)
- Power capacity
- 64 MW operating
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Grant County PUD
- Power source
- Hydro
- Cooling
- Closed loop
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Confirmed by multiple independent sources or official documentation
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- October 18, 2023OperatingVantage announced delivery of WA13, the third and final facility on its Quincy (WA1) campus. Source: Vantage Data Centers
Opposition and litigation at this site
Nothing on record as of September 5, 2026. No lawsuit, organized opposition, or contested hearing over Vantage WA13 in Quincy, Grant County, Washington appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
Vantage says Grant County PUD's two large-scale hydroelectric dams produce an average of 1,050 MW annually and that hydro accounts for more than 66% of the utility's generation mix.
Closed-loop air-cooled chiller system. Vantage reports the campus's closed-loop chilled-water design with air-side economizers brings water utilization efficiency close to zero litres/kW/hr.
Notes on the record
530,000 sq ft building adding 64 MW of IT capacity on Vantage's 68-acre Quincy (WA1) campus at 2101 M Street NE, bringing the campus to 89 MW across nearly 775,000 sq ft. Uses Tier 4 generators to reduce particulate and NOx emissions. Construction began in late 2022 and the building was delivered Oct. 18, 2023. Sibling buildings WA11 and WA12 are already tracked separately; the 89 MW and 68 acres are campus-level figures and are not attributed to this building. Coordinates are an approximate geocode of the campus address.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
Which document closes each gap
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Sabey Intergate.Quincy Campus · Quincy · Sabey Data Centersunder 1 mile · Operating · 70 MW
- Vantage Quincy WA11 · Quincy · Vantage Data Centersunder 1 mile · Operating
- Vantage WA12 · Quincy · Vantage Data Centersunder 1 mile · Operating
- Salcido Horizon Data Center · Quincy · Salcido Enterprises, LLC1 mi · Operating · 4 MW
- Salcido Fortress Data Center · Quincy · Salcido Enterprises, LLC1 mi · Operating · 4.6 MW
- H5 Data Centers Quincy Campus · Quincy · H5 Data Centers1 mi · Operating · 40 MW
- NTT Data Quincy Data Center · Quincy · NTT DATA2 mi · Operating
- Microsoft Columbia Data Center (Quincy) · Quincy · Microsoft2 mi · Operating
Questions people ask about this site
Is there opposition to the Vantage WA13 data center in Quincy?
Nothing on record as of September 5, 2026. No lawsuit, organized opposition, or contested hearing over Vantage WA13 in Quincy, Grant County, Washington appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Vantage WA13 data center?
No lawsuit over Vantage WA13 appears in the record we track as of September 5, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Vantage WA13 use?
No water withdrawal figure for Vantage WA13 is on record here. Cooling is recorded as closed_loop, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.
Who operates Vantage WA13, and how big is it?
Vantage Data Centers is the operator on record. We hold 20 sites for that company across the registry. Capacity on record is 64 MW.
How to cite this page
SueDataCenters.org Data Center Registry, "Vantage WA13," updated September 5, 2026, https://suedatacenters.org/data-centers/vantage-wa13-quincy-wa.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/vantage-wa13-quincy-wa, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Vantage Data Centers Completes Development of 89MW, $1 Billion Quincy, Washington Campus · Vantage Data Centers · retrieved September 5, 2026
- 2.Quincy, Washington Data Center Campus · Vantage Data Centers · retrieved September 5, 2026
- 3.Quincy, WA data center facility directory (Vantage WA11/WA12/WA13) · Baxtel · retrieved September 5, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us