San Angelo (Tankersley area, unincorporated), Tom Green County, Texas · All 3 Beacon Data Centers sites
Westline Site / Dove Creek Technology Campus is a proposed data center in San Angelo (Tankersley area, unincorporated), Texas (Tom Green County), operated by Beacon Data Centers (via Westline TX Holdings). The public record puts it at 1,240 acres. It is the subject of active public debate, with hearings, petitions, or organized opposition on record.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Proposed
- Operator
- Beacon Data Centers (via Westline TX Holdings)
- Facility type
- Data center
- Location
- San Angelo (Tankersley area, unincorporated), Tom Green County, TX
- Coordinates
- 31.3350, -100.4780 (approximate)
- Power capacity
- Not established from a public source
- Land
- 1,240 acres
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Concho Valley Electric Co-op Inc
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- Contested
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- June 2, 2026Proposedproposed per TCEQ Air Quality Permit No. 184380 application (Westline TX Holdings) Source: Texas Commission on Environmental Quality (reported via The Concho Observer)
Opposition and litigation at this site
Yes. Westline Site / Dove Creek Technology Campus in San Angelo (Tankersley area, unincorporated), Tom Green County, Texas is contested. Hearings, public comment, petitions, or organized opposition are on record, and no lawsuit has been filed so far. A proposed 12-month data-center moratorium was rejected by county commissioners; local opposition documented.
How the community has taken it
Reception is a sourced signal, not an editorial judgment: contested means active public debate is on record, with hearings, petitions, or organized opposition, without litigation.
A proposed 12-month data-center moratorium was rejected by county commissioners; local opposition documented.
Notes on the record
Anchored to TCEQ Air Quality Permit application #184380 filed by Westline TX Holdings (Beacon Data Centers). Site is ~1,240 buildable acres near the FM 2335 / US-67 South junction along Spring Creek, Precinct 4, Tom Green County. County commissioners rejected a proposed 12-month data-center moratorium 2026-06-02, citing litigation risk, an implicit but real signal the project is proceeding through the county's process. No MW capacity or investment figure disclosed in any source reviewed; left null per zero-fabrication rule. Coordinates are an approximate geocode of the named road junction (Tankersley, TX), not a parcel centroid, recommend verifying against the TCEQ permit's exact site description if available. Single-source (Concho Observer reporting a TCEQ air-quality permit application); recorded reported-tier pending a second corroborating primary.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Cipher Colchis Campus · San Angelo · Cipher Digital16 mi · Proposed · 1 GW
Questions people ask about this site
Is there opposition to the Westline Site / Dove Creek Technology Campus in San Angelo (Tankersley area, unincorporated)?
Yes. Westline Site / Dove Creek Technology Campus in San Angelo (Tankersley area, unincorporated), Tom Green County, Texas is contested. Hearings, public comment, petitions, or organized opposition are on record, and no lawsuit has been filed so far. A proposed 12-month data-center moratorium was rejected by county commissioners; local opposition documented.
Has anyone filed a lawsuit over the Westline Site / Dove Creek Technology Campus?
No lawsuit over Westline Site / Dove Creek Technology Campus appears in the record we track as of July 26, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Westline Site / Dove Creek Technology Campus use?
No water withdrawal figure for Westline Site / Dove Creek Technology Campus is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Westline Site / Dove Creek Technology Campus, and how big is it?
Beacon Data Centers (via Westline TX Holdings) is the operator on record. We hold 3 sites for that company across the registry. No capacity figure is on record for this site. The site is recorded at 1240 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "Westline Site / Dove Creek Technology Campus," updated July 26, 2026, https://suedatacenters.org/data-centers/beacon-westline-dove-creek-san-angelo-tx.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/beacon-westline-dove-creek-san-angelo-tx, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.TCEQ Air Quality Permit No. 184380 application (Westline TX Holdings) · Texas Commission on Environmental Quality (reported via The Concho Observer) · retrieved July 17, 2026
- 2.Tom Green County Commissioners Reject Data Center Moratorium · SanAngeloLIVE · retrieved July 17, 2026
- 3.Developer sheds light on Dove Creek data center as commissioners mull options · ConchoValleyHomepage.com · retrieved July 17, 2026
- 4.HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · Oak Ridge National Laboratory (ORNL) / HIFLD · retrieved July 23, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.