Sue Data Centers

Data Center Registry

Atlas Power Butte Data Center

Butte, Silver Bow County, Montana · All 2 Atlas Power sites

OperatingMixed receptionRecord updated August 16, 2026

Atlas Power Butte Data Center is an operating crypto mining site in Butte, Montana (Silver Bow County), operated by Atlas Power. The public record puts it at announced 2018, 300 MW planned. It has documented support and documented opposition on record.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Operating

Operator
Atlas Power
Facility type
Crypto mining
Location
Butte, Silver Bow County, MT
Coordinates
45.9309, -112.5182
Power capacity
300 MW planned
Land
Not established from a public source
Investment
Not established from a public source
Announced
2018
Utility
Not established from a public source
Power source
Grid
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
Mixed reception
Source confidence
Reported by at least one credible outlet or filing

Opposition and litigation at this site

Partly. Both documented support and documented opposition to Atlas Power Butte Data Center in Butte, Silver Bow County, Montana appear in the record, with no clear majority position.

How the community has taken it

Reception is a sourced signal, not an editorial judgment: mixed reception means documented support and documented opposition both exist with no clear majority position on record.

Notes on the record

Former Mike Mansfield Advanced Technology Center (MSE Technologies) campus at Basin Creek TEDD south of Butte. CryptoWatt LLC (subsidiary of The Burrell Group) launched bitcoin mining here in 2018; the site was later acquired/rebranded and now operates as Atlas Power (already the named operator by a Dec 2022 equipment-supplier lawsuit against BlockFills). Atlas mines crypto (ASIC/bitcoin, later pivoted partly to GPU/Ethereum) and offers ML/data-processing hosting. Reported capacity figures conflict across sources (permitted ~75MW; one listing shows 150MW; actual draw reported as low as 25MW during the ETH pivot) so capacity is left unset here pending a primary-source figure I could personally verify. NorthWestern Energy has agreed to supply Atlas 75MW of grid power beginning 2026 with a further ~75MW expected within 3-5 years (Datacenter Dynamics). A related 1,600-acre Basin Creek Solar Project expansion (intended to help power the site) was denied by the Butte Zoning Board in the face of strong public opposition.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • Which utility serves it
Which document closes each gap
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Questions people ask about this site

Is there opposition to the Atlas Power Butte Data Center in Butte?

Partly. Both documented support and documented opposition to Atlas Power Butte Data Center in Butte, Silver Bow County, Montana appear in the record, with no clear majority position.

Has anyone filed a lawsuit over the Atlas Power Butte Data Center?

No lawsuit over Atlas Power Butte Data Center appears in the record we track as of August 16, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Atlas Power Butte Data Center use?

No water withdrawal figure for Atlas Power Butte Data Center is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates Atlas Power Butte Data Center, and how big is it?

Atlas Power is the operator on record. We hold 2 sites for that company across the registry. Capacity on record is 300 MW.

How to cite this page

SueDataCenters.org Data Center Registry, "Atlas Power Butte Data Center," updated August 16, 2026, https://suedatacenters.org/data-centers/atlas-power-butte-mt.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/atlas-power-butte-mt, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.NorthWestern Energy to supply Atlas Power with 75MW · Data Center Dynamics · retrieved August 5, 2026
  2. 2.Atlas Power suing equipment supplier for over $11M · Montana Standard · retrieved August 5, 2026
  3. 3.Atlas Power Butte Data Center listing, 200 Technology Way · DataCenterMap · retrieved August 5, 2026
  4. 4.Atlas Power: Butte · Global Energy Monitor · retrieved August 5, 2026
  5. 5.CryptoWatt bitcoin mining operation ramps up production · Montana Standard · retrieved August 5, 2026
  6. 6.Atlas Power: Butte · Global Energy Monitor · retrieved August 16, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us