Sue Data Centers

Data Center Registry

EdgeConneX Boston (EDCBOS01)

Billerica, Middlesex County, Massachusetts · All 27 EdgeConneX sites · Every EdgeConneX case on our tracker

OperatingNo reception on recordRecord updated October 24, 2026

EdgeConneX Boston (EDCBOS01) is an operating data center in Billerica, Massachusetts (Middlesex County), operated by EdgeConneX. The public record puts it at 4.5 MW planned.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Operating

Operator
EdgeConneX
Facility type
Data center
Location
22 Linnell Circle, Billerica, Middlesex County, MA, 01821
Coordinates
42.5285, -71.2495 (approximate)
Power capacity
1.5 MW operating; 4.5 MW planned
Land
Not established from a public source
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Not established from a public source
Power source
Grid
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Confirmed by multiple independent sources or official documentation

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. 2015
    Operating
    The operator site captions the facility 'Est. 2015'. Source: EdgeConneX

Opposition and litigation at this site

Nothing on record as of October 24, 2026. No lawsuit, organized opposition, or contested hearing over EdgeConneX Boston (EDCBOS01) in Billerica, Middlesex County, Massachusetts appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

Power and water

The operator data sheet states '1.5 MW N+1; planned for 4.5 MW' and says the site can support 20+ kW per cabinet.

Notes on the record

A 54,700 sq ft edge data center with about 21,400 sq ft of raised floor. The operator markets it as Boston, but PeeringDB places it at 22 Linnell Circle, Billerica. It is a different site from Equinix BO2 (41-43 Alexander Road, Billerica).

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
  • Which utility serves it
Which document closes each gap
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Tell us about your situation

Living near EdgeConneX Boston (EDCBOS01)?

Tell us the basics. Where a participating attorney in your state is available, we may share your information with them with your consent. Free, no obligation, and no guarantee anyone will contact you.

Questions people ask about this site

Is there opposition to the EdgeConneX Boston (EDCBOS01) data center in Billerica?

Nothing on record as of October 24, 2026. No lawsuit, organized opposition, or contested hearing over EdgeConneX Boston (EDCBOS01) in Billerica, Middlesex County, Massachusetts appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the EdgeConneX Boston (EDCBOS01) data center?

No lawsuit over EdgeConneX Boston (EDCBOS01) appears in the record we track as of October 24, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does EdgeConneX Boston (EDCBOS01) use?

No water withdrawal figure for EdgeConneX Boston (EDCBOS01) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates EdgeConneX Boston (EDCBOS01), and how big is it?

EdgeConneX is the operator on record. We hold 27 sites for that company across the registry. Capacity on record is 4.5 MW.

How to cite this page

SueDataCenters.org Data Center Registry, "EdgeConneX Boston (EDCBOS01)," updated October 24, 2026, https://suedatacenters.org/data-centers/edgeconnex-edcbos01-billerica-ma.

Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/edgeconnex-edcbos01-billerica-ma, retrieved October 29, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.EdgeConneX Boston BOS01 data sheet (Q1 2026 update) · EdgeConneX · retrieved October 24, 2026
  2. 2.PeeringDB facility 2073: EdgeConneX Boston (EDCBOS01) · PeeringDB · retrieved October 24, 2026
  3. 3.EdgeConneX Boston location page · EdgeConneX · retrieved October 24, 2026

Is a data center disrupting your home?

Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.

  • Tell us about your situation
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us