Equinix BO2 - Boston, Billerica

Billerica, Middlesex County, Massachusetts · All 34 Equinix sites

OperatingNo reception on recordRecord updated September 15, 2026

Equinix BO2 - Boston, Billerica is an operating data center in Billerica, Massachusetts (Middlesex County), operated by Equinix.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Operating

Operator
Equinix
Facility type
Data center
Location
41-43 Alexander Road, Billerica, Middlesex County, MA, 01821
Coordinates
42.5517, -71.2157 (approximate)
Power capacity
Not established from a public source
Land
Not established from a public source
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Not established from a public source
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Confirmed by multiple independent sources or official documentation

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. September 15, 2026
    Operating
    Equinix's own Boston data centers page lists BO2 as an operating IBX in Billerica; PeeringDB carries an active Equinix-maintained facility record for the site. Source: Equinix

Opposition and litigation at this site

Nothing on record as of September 15, 2026. No lawsuit, organized opposition, or contested hearing over Equinix BO2 - Boston, Billerica in Billerica, Middlesex County, Massachusetts appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

Notes on the record

Second Equinix IBX in the Boston metro, distinct from the tracked Equinix BO1 in Waltham (74 West Street). Equinix markets BO2 for "enterprises, technology and biotech firms with large deployments"; neither source states a megawatt figure, so capacity is omitted.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Power capacity in megawatts
  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
  • Which utility serves it
Which document closes each gap
Power capacity in megawatts
The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Free case review

Living near Equinix BO2 - Boston, Billerica?

Tell us the basics and an independent attorney handling data center cases in your state will follow up. Free, and you are never obligated to hire anyone.

Questions people ask about this site

Is there opposition to the Equinix BO2 - Boston, Billerica data center in Billerica?

Nothing on record as of September 15, 2026. No lawsuit, organized opposition, or contested hearing over Equinix BO2 - Boston, Billerica in Billerica, Middlesex County, Massachusetts appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the Equinix BO2 - Boston, Billerica data center?

No lawsuit over Equinix BO2 - Boston, Billerica appears in the record we track as of September 15, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Equinix BO2 - Boston, Billerica use?

No water withdrawal figure for Equinix BO2 - Boston, Billerica is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates Equinix BO2 - Boston, Billerica, and how big is it?

Equinix is the operator on record. We hold 34 sites for that company across the registry. No capacity figure is on record for this site.

How to cite this page

SueDataCenters.org Data Center Registry, "Equinix BO2 - Boston, Billerica," updated September 15, 2026, https://suedatacenters.org/data-centers/equinix-bo2-billerica-ma.

Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/equinix-bo2-billerica-ma, retrieved October 1, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Equinix Boston data centers - "BO2 data center in Billerica" · Equinix · retrieved September 15, 2026
  2. 2.PeeringDB facility record: Equinix BO2 - Boston, Billerica, 41-43 Alexander Road · PeeringDB · retrieved September 15, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us