DartPoints Lexington Data Center Campus is a proposed data center in Lexington, Kentucky (Fayette County), operated by DartPoints. The public record puts it at announced May 27, 2026, 70 MW planned, 29.5 acres.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Proposed
- Operator
- DartPoints
- Facility type
- Data center
- Location
- 745 West New Circle Road, Lexington, Fayette County, KY
- Coordinates
- 38.0748, -84.4876 (approximate)
- Power capacity
- 70 MW planned
- Land
- 29.5 acres
- Investment
- Not established from a public source
- Announced
- May 27, 2026
- Utility
- Kentucky Utilities (KU)
- Power source
- Grid
- Cooling
- Closed loop
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Confirmed by multiple independent sources or official documentation
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- May 27, 2026ProposedDartPoints announced the acquisition of a 29.5-acre Lexington data center campus (the former Lexmark property) and plans to redevelop it for AI, neo-cloud, hyperscale and enterprise workloads. Source: PR Newswire (DartPoints)
Opposition and litigation at this site
Nothing on record as of September 15, 2026. No lawsuit, organized opposition, or contested hearing over DartPoints Lexington Data Center Campus in Lexington, Fayette County, Kentucky appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
The property includes an owned on-site substation; DartPoints cites collaboration with Kentucky Utilities and LG&E, and WEKU reports KU supports the project.
DartPoints describes 'direct-to-chip liquid cooling using closed-loop, low-water-use heat rejection' alongside support for traditional air-cooled environments.
Notes on the record
Acquired in May 2026 for $29 million; roughly 343,000 sq ft of campus including about 81,000 sq ft of existing raised-floor data center space, fully zoned for data center use, with rack densities up to 200 kW planned. DartPoints describes a path to approximately 20 to 30 MW in an initial phase with longer-term expansion potential to 70 MW, the 70 MW build-out figure is what capacityMw.planned records. As of June 2026 the company was still finalizing a ready-for-service date and no operations date had been announced, so this is recorded as proposed rather than operational; Lexington declined to provide city incentives. Coordinates are a geocode of the street address, not a parcel-confirmed footprint.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Tax abatements or other public subsidy
- Permanent jobs promised
- How the community has received it
Which document closes each gap
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Panattoni Burgin Data Center Campus · Burgin · Panattoni27 mi · Proposed · Opposed
Questions people ask about this site
Is there opposition to the DartPoints Lexington Data Center Campus in Lexington?
Nothing on record as of September 15, 2026. No lawsuit, organized opposition, or contested hearing over DartPoints Lexington Data Center Campus in Lexington, Fayette County, Kentucky appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the DartPoints Lexington Data Center Campus?
No lawsuit over DartPoints Lexington Data Center Campus appears in the record we track as of September 15, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does DartPoints Lexington Data Center Campus use?
No water withdrawal figure for DartPoints Lexington Data Center Campus is on record here. Cooling is recorded as closed_loop, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.
Who operates DartPoints Lexington Data Center Campus, and how big is it?
DartPoints is the operator on record. We hold 8 sites for that company across the registry. Capacity on record is 70 MW. The site is recorded at 29.5 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "DartPoints Lexington Data Center Campus," updated September 15, 2026, https://suedatacenters.org/data-centers/dartpoints-lexington-fayette-ky.
Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/dartpoints-lexington-fayette-ky, retrieved October 1, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.DartPoints Acquires Lexington, Kentucky Data Center Campus to Support AI, Neo-Cloud, Hyperscale, and Enterprise Demand · PR Newswire (DartPoints) · retrieved September 15, 2026
- 2.Data center company plans to expand former Lexmark property for cloud, AI computing · WEKU · retrieved September 15, 2026
- 3.DartPoints Acquires Lexington Data Center Campus for $29 Million · Smiley Pete Publishing · retrieved September 15, 2026
- 4.DartPoints data center coming to Lexington won't get city incentives · WKYT · retrieved September 15, 2026
- 5.OpenStreetMap/Nominatim geocode of 745 West New Circle Road, Lexington, Fayette County, KY · OpenStreetMap · retrieved September 15, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us