Data Center Registry
CleanSpark Norcross Bitcoin Mining Facility
Norcross, Gwinnett County, Georgia · All 25 CleanSpark sites
CleanSpark Norcross Bitcoin Mining Facility is an operating crypto mining site in Norcross, Georgia (Gwinnett County), operated by CleanSpark, Inc. The public record puts it at announced August 6, 2021, 20 MW operating.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- CleanSpark, Inc.
- Facility type
- Crypto mining
- Location
- Norcross, Gwinnett County, GA
- Coordinates
- 33.9412, -84.2135 (approximate)
- Power capacity
- 20 MW operating
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- August 6, 2021
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Confirmed by multiple independent sources or official documentation
Opposition and litigation at this site
Nothing on record as of August 5, 2026. No lawsuit, organized opposition, or contested hearing over CleanSpark Norcross Bitcoin Mining Facility in Norcross, Gwinnett County, Georgia appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
Acquired Aug 6, 2021 for $6.55M; ~87,000 sq ft former Sprint/Nextel data center, immersion-cooled. Confirmed still operating as of the FY2025 10-K (named as miner-collateral location alongside College Park). 20 MW figure is from the 2021 acquisition announcement, not independently restated in the FY2025 10-K (which only gives the GA aggregate of 620 MW / 15 locations).
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Flexential Atlanta - Norcross (ATL01/02) · Norcross · Flexential1 mi · Operating
- STACK ATL01 (formerly T5@Atlanta) · Alpharetta · STACK Infrastructure10 mi · Operating · 20 MW
- Flexential Atlanta - Alpharetta Data Center · Alpharetta · Flexential10 mi · Operating
- CoreSite AT2 - Marietta Data Center · Marietta · CoreSite15 mi · Operating
- 1155 Powers Ferry Place Data Center (Prime Storage conversion) · Marietta · Prime Storage (Prime Group Holdings), end user undisclosed16 mi · Permitted · 18 MW · Contested
- CoreSite AT1 - Atlanta, GA · Atlanta · CoreSite16 mi · Operating
- Digital Realty Atlanta ATL13 · Atlanta · Digital Realty16 mi · Operating
- QTS Atlanta 1 (Atlanta-Metro DC1) · Atlanta · QTS Data Centers16 mi · Operating · 278 MW
Questions people ask about this site
Is there opposition to the CleanSpark Norcross Bitcoin Mining Facility in Norcross?
Nothing on record as of August 5, 2026. No lawsuit, organized opposition, or contested hearing over CleanSpark Norcross Bitcoin Mining Facility in Norcross, Gwinnett County, Georgia appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the CleanSpark Norcross Bitcoin Mining Facility?
No lawsuit over CleanSpark Norcross Bitcoin Mining Facility appears in the record we track as of August 5, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does CleanSpark Norcross Bitcoin Mining Facility use?
No water withdrawal figure for CleanSpark Norcross Bitcoin Mining Facility is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates CleanSpark Norcross Bitcoin Mining Facility, and how big is it?
CleanSpark, Inc. is the operator on record. We hold 25 sites for that company across the registry. Capacity on record is 20 MW.
How to cite this page
SueDataCenters.org Data Center Registry, "CleanSpark Norcross Bitcoin Mining Facility," updated August 5, 2026, https://suedatacenters.org/data-centers/cleanspark-norcross-ga.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/cleanspark-norcross-ga, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.CleanSpark 8-K Exhibit 99.1, "CleanSpark Acquires Second Data Center to Increase Bitcoin Mining Capacity": closed Aug 6, 2021 on ~87,000 sq ft former Sprint/Nextel data center on 7+ acres in Norcross, Georgia, for $6.55M; 20 MW of power · CleanSpark, Inc. / SEC EDGAR · retrieved August 5, 2026
- 2.CleanSpark FY2025 10-K: "3,336 S19j Pro miners, which are located at our College Park, GA and Norcross, GA sites" (confirms site still active as of FY2025) · CleanSpark, Inc. / SEC EDGAR · retrieved August 5, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us