FirstLight Manchester Data Center
Manchester, Hillsborough County, New Hampshire · All 8 FirstLight Fiber sites
FirstLight Manchester Data Center is an operating data center in Manchester, New Hampshire (Hillsborough County), operated by FirstLight Fiber. The public record puts it at 2 MW operating.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- FirstLight Fiber
- Facility type
- Data center
- Location
- 77 Sundial Ave, Manchester, Hillsborough County, NH, 03103
- Coordinates
- 42.9720, -71.4706 (approximate)
- Power capacity
- 2 MW operating
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Confirmed by multiple independent sources or official documentation
Opposition and litigation at this site
Nothing on record as of October 26, 2026. No lawsuit, organized opposition, or contested hearing over FirstLight Manchester Data Center in Manchester, Hillsborough County, New Hampshire appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
Distinct from the existing FirstLight Portsmouth, NH record and from Consolidated Communications' separate Manchester site (770 Elm St, ~2 miles away) -- this facility is at 77 Sundial Ave. OSM matches a building named 'Sundial Center' spanning street numbers 1/3/25/77 Sundial Avenue (way/183679768), used in preference to the nearby US Census interpolation. Baxtel's New Hampshire directory page lists this site at roughly 14,000 sq ft; the facility-specific page describes it as a 'Tier II facility,' 'fully operational,' with power/space figures redacted pending direct contact with the operator. No numeric MW capacity confirmed.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Crown Castle Fiber NH1 (1 Sundial Ave) · Manchester · Crown Castle Fiber (Crown Castle's Fiber Solutions business was sold to Zayo Group on 2026-05-01)under 1 mile · Operating
- Consolidated Communications Manchester Data Center · Manchester · Consolidated Communications1 mi · Operating
- FirstLight Bedford Data Center (formerly ColoSpace) · Bedford · FirstLight Fiber3 mi · Operating
- Merrimack Station Data Center (proposed, Bow) · Bow · Granite Shore Power (site owner; end developer not publicly identified)12 mi · Proposed · 350 MW · Opposed
- Locke Road Micro Data Center · Concord · Granite Municipal Manufacturing & Sales, LLC19 mi · Proposed · 15 MW · Contested
- TierPoint Boston - Andover · Andover · TierPoint24 mi · Operating
- Markley Group One Lowell Data Center · Lowell · Markley Group25 mi · Operating · 50 MW · In litigation
- Phillips Exeter Academy Information Technology Data Center · Exeter · Phillips Exeter Academy26 mi · Operating
Questions people ask about this site
Is there opposition to the FirstLight Manchester Data Center in Manchester?
Nothing on record as of October 26, 2026. No lawsuit, organized opposition, or contested hearing over FirstLight Manchester Data Center in Manchester, Hillsborough County, New Hampshire appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the FirstLight Manchester Data Center?
No lawsuit over FirstLight Manchester Data Center appears in the record we track as of October 26, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does FirstLight Manchester Data Center use?
No water withdrawal figure for FirstLight Manchester Data Center is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates FirstLight Manchester Data Center, and how big is it?
FirstLight Fiber is the operator on record. We hold 8 sites for that company across the registry. Capacity on record is 2 MW.
How to cite this page
SueDataCenters.org Data Center Registry, "FirstLight Manchester Data Center," updated October 26, 2026, https://suedatacenters.org/data-centers/firstlight-manchester-nh.
Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/firstlight-manchester-nh, retrieved October 29, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.New Hampshire Data Centers & Colocation · Baxtel · retrieved September 21, 2026
- 2.FirstLight Manchester Data Center · Baxtel · retrieved September 12, 2026
- 3.FirstLight, Manchester, NH data center specifications · FirstLight Fiber · retrieved September 14, 2026
- 4.PeeringDB facility records for NH (fac 1452: ColoCenter.com - Manchester NH, 77 Sundial Avenue) · PeeringDB · retrieved October 26, 2026
- 5.Data Centers in New Hampshire (Firstlight Fiber Manchester, 77 Sundial Avenue, Manchester, NH 03103) · Inflect · retrieved October 26, 2026
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us