Locke Road Micro Data Center
Concord, Merrimack County, New Hampshire
Locke Road Micro Data Center is a proposed data center in Concord, New Hampshire (Merrimack County), operated by Granite Municipal Manufacturing & Sales, LLC. It is the subject of active public debate, with hearings, petitions, or organized opposition on record.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Proposed
- Operator
- Granite Municipal Manufacturing & Sales, LLC
- Facility type
- Data center
- Location
- 52 Locke Road, Concord, Merrimack County, NH, 03301
- Coordinates
- 43.2441, -71.5460 (approximate)
- Power capacity
- Not established from a public source
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Closed loop
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- Contested
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- September 14, 2026ProposedNorthpoint Engineering filed a site-plan application for an 8,160 sq ft building: about 7,220 sq ft of micro data center, plus an office, a garage and a caretaker unit. The Planning Board's decision deadline is 2026-11-20. Source: Concord Monitor
Opposition and litigation at this site
Yes. Locke Road Micro Data Center in Concord, Merrimack County, New Hampshire is contested. Hearings, public comment, petitions, or organized opposition are on record, and no lawsuit has been filed so far. Residents opposed the application at the Planning Board, which advanced it on 2026-09-17 and set a public hearing for 2026-10-21.
How the community has taken it
Reception is a sourced signal, not an editorial judgment: contested means active public debate is on record, with hearings, petitions, or organized opposition, without litigation.
Residents opposed the application at the Planning Board, which advanced it on 2026-09-17 and set a public hearing for 2026-10-21.
Power and water
The applicant describes single-phase immersion cooling as a 'closed-loop system' that sends heat to heat exchangers for reuse or dissipation. It says no water is needed for normal cooling, but the application still includes a six-inch water service, and city staff asked when water would be used.
Notes on the record
Northpoint Engineering, LLC is the applicant. Granite Municipal Manufacturing & Sales, LLC owns the land and is developing it; it bought the land in 2024. The parcel is nearly 21 acres, of which about 9.3 are buildable. About 54,780 sq ft of wooded buffer was cleared beforehand. No power capacity or investment figure has been published. The coordinates match the OSM address point for 52 Locke Road; the Census geocoder puts it about 600 m away. Precision is approximate.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Merrimack Station Data Center (proposed, Bow) · Bow · Granite Shore Power (site owner; end developer not publicly identified)8 mi · Proposed · 350 MW · Opposed
- Consolidated Communications Manchester Data Center · Manchester · Consolidated Communications18 mi · Operating
- FirstLight Manchester Data Center · Manchester · FirstLight Fiber19 mi · Operating · 2 MW
- ColoSpace Bedford Data Center · Bedford · ColoSpace, Inc.22 mi · Operating
Questions people ask about this site
Is there opposition to the Locke Road Micro Data Center in Concord?
Yes. Locke Road Micro Data Center in Concord, Merrimack County, New Hampshire is contested. Hearings, public comment, petitions, or organized opposition are on record, and no lawsuit has been filed so far. Residents opposed the application at the Planning Board, which advanced it on 2026-09-17 and set a public hearing for 2026-10-21.
Has anyone filed a lawsuit over the Locke Road Micro Data Center?
No lawsuit over Locke Road Micro Data Center appears in the record we track as of October 8, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Locke Road Micro Data Center use?
No water withdrawal figure for Locke Road Micro Data Center is on record here. Cooling is recorded as closed_loop, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.
Who operates Locke Road Micro Data Center, and how big is it?
Granite Municipal Manufacturing & Sales, LLC is the operator on record. No capacity figure is on record for this site.
How to cite this page
SueDataCenters.org Data Center Registry, "Locke Road Micro Data Center," updated October 8, 2026, https://suedatacenters.org/data-centers/locke-road-micro-data-center-concord-nh.
Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/locke-road-micro-data-center-concord-nh, retrieved October 11, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Concord plans: micro data center proposed at 52 Locke Road · Concord Monitor · retrieved October 8, 2026
- 2.'Small dogs still bite': Proposed micro data center elicits resistance as development advances through application process · Concord Monitor · retrieved October 8, 2026
- 3.Locke Road Micro Data Center (tracker entry; coordinates 43.2441282, -71.5460077) · More Than Just Parks · retrieved October 8, 2026
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us