Merrimack Station Data Center (proposed, Bow)
Bow, Merrimack County, New Hampshire
Merrimack Station Data Center (proposed, Bow) is a proposed data center in Bow, New Hampshire (Merrimack County), operated by Granite Shore Power (site owner; end developer not publicly identified). The public record puts it at 350 MW planned. It faces documented, organized local opposition.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Proposed
- Operator
- Granite Shore Power (site owner; end developer not publicly identified)
- Facility type
- Data center
- Location
- 97 River Rd, Bow, Merrimack County, NH, 03304
- Coordinates
- 43.1411, -71.4692 (approximate)
- Power capacity
- 350 MW planned
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Eversource (Public Service Company of New Hampshire)
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- Opposed
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- April 23, 2026ProposedPSNH filed a Viability Assessment Agreement (VSA-PSNH-001) with Granite Shore Power, LLC at FERC for a potential 350 MW load interconnection. A Bow town official later confirmed high-level talks about a data center at the site, but no application has been filed with the town. Source: Federal Energy Regulatory Commission filing (hosted by Concord Monitor)
Opposition and litigation at this site
Yes. Organized local opposition to Merrimack Station Data Center (proposed, Bow) in Bow, Merrimack County, New Hampshire is documented in the public record, without a lawsuit on file in the sources we track. At a Bow Select Board meeting on 2026-09-23, an overwhelming majority of residents who spoke opposed the project, citing noise, water and air pollution.
How the community has taken it
Reception is a sourced signal, not an editorial judgment: opposed means documented, organized local opposition is the dominant signal on record.
At a Bow Select Board meeting on 2026-09-23, an overwhelming majority of residents who spoke opposed the project, citing noise, water and air pollution. A rally against it was held on 2026-09-22. Governor Kelly Ayotte has said she opposes it and plans to propose a statewide data-center moratorium.
Power and water
The 350 MW figure is the load size in a Viability Assessment Agreement between PSNH (Eversource) and Granite Shore Power, LLC. Under it, PSNH studies a 'potential load interconnection of a 350 MW facility' to its transmission system, at the customer's sole cost. This is a study agreement, not an interconnection award. NH's Consumer Advocate separately said Eversource staff mentioned a developer considering 'up to 200 MW' in Bow.
Notes on the record
This is the former Merrimack Station coal plant site, which stopped coal generation in 2025; its two small kerosene combustion turbines are still listed as active. Granite Shore Power owns 343 acres there, in an industrial zone. That is the owner's site holding, not a confirmed data-center footprint, so the land area is left blank. The FERC agreement says only 'a 350 MW facility' and never says data center. The data-center use comes from a Bow town official confirming high-level talks, as reported by NHPR and the Concord Monitor. The end developer has not been named and no application has been filed with the town, so confidence is 'reported'. Coordinates are the EIA plant point, so precision is approximate.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Locke Road Micro Data Center · Concord · Granite Municipal Manufacturing & Sales, LLC8 mi · Proposed · Contested
- Consolidated Communications Manchester Data Center · Manchester · Consolidated Communications11 mi · Operating
- FirstLight Manchester Data Center · Manchester · FirstLight Fiber12 mi · Operating · 2 MW
- ColoSpace Bedford Data Center · Bedford · ColoSpace, Inc.15 mi · Operating
Questions people ask about this site
Is there opposition to the Merrimack Station Data Center (proposed, Bow) in Bow?
Yes. Organized local opposition to Merrimack Station Data Center (proposed, Bow) in Bow, Merrimack County, New Hampshire is documented in the public record, without a lawsuit on file in the sources we track. At a Bow Select Board meeting on 2026-09-23, an overwhelming majority of residents who spoke opposed the project, citing noise, water and air pollution.
Has anyone filed a lawsuit over the Merrimack Station Data Center (proposed, Bow)?
No lawsuit over Merrimack Station Data Center (proposed, Bow) appears in the record we track as of October 8, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Merrimack Station Data Center (proposed, Bow) use?
No water withdrawal figure for Merrimack Station Data Center (proposed, Bow) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Merrimack Station Data Center (proposed, Bow), and how big is it?
Granite Shore Power (site owner; end developer not publicly identified) is the operator on record. Capacity on record is 350 MW.
How to cite this page
SueDataCenters.org Data Center Registry, "Merrimack Station Data Center (proposed, Bow)," updated October 8, 2026, https://suedatacenters.org/data-centers/granite-shore-merrimack-station-bow-nh.
Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/granite-shore-merrimack-station-bow-nh, retrieved October 11, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.PSNH/Eversource FERC filing (Accession 20260423-5055, filed 2026-04-23): Viability Assessment Agreement VSA-PSNH-001 with Granite Shore Power, LLC for a potential 350 MW load interconnection · Federal Energy Regulatory Commission filing (hosted by Concord Monitor) · retrieved October 8, 2026
- 2.Could Bow be home to a new data center? · New Hampshire Public Radio · retrieved October 8, 2026
- 3.Bow in talks over AI data center at Merrimack Station · Concord Monitor · retrieved October 8, 2026
- 4.'Please, do not allow this to happen': Residents call for proactive steps to prevent data center in Bow · Concord Monitor · retrieved October 8, 2026
- 5.'We're not willing to trade lower taxes for this': Bow residents speak out against proposed data centers · Vermont Public / NHPR · retrieved October 8, 2026
- 6.Merrimack power plant (EIA plant 2364), 97 River Rd, Bow NH: coordinates 43.1411, -71.4692 · GridInfo · retrieved October 8, 2026
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us