Sabey Intergate.Columbia Building D is a data center under construction in East Wenatchee, Washington (Douglas County), operated by Sabey Data Centers.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Under construction
- Operator
- Sabey Data Centers
- Facility type
- Data center
- Location
- East Wenatchee, Douglas County, WA
- Coordinates
- 47.4076, -120.1916
- Power capacity
- Not established from a public source
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Douglas County Public Utility District
- Power source
- Hydro
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- September 17, 2026Under constructionSabey's SDC Columbia page states three buildings are currently operational with a fourth under construction; OSM maps a fourth Sabey-operated building, 'Intergate Columbia D', on the campus. Source: Sabey Data Centers
Opposition and litigation at this site
Nothing on record as of September 17, 2026. No lawsuit, organized opposition, or contested hearing over Sabey Intergate.Columbia Building D in East Wenatchee, Douglas County, Washington appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
Campus-level: Sabey states SDC Columbia electricity is supplied by hydro power through Douglas County PUD.
Notes on the record
Identification of OSM's 'Intergate Columbia D' with the fourth building Sabey describes as under construction is an inference from two sources that agree on campus, operator and building count; it is not stated in one document, hence confidence 'reported'. No street number is recorded because OSM carries none for this polygon. The 70 MW campus figure is not attributed to this building.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Sabey Intergate.Columbia Building A · East Wenatchee · Sabey Data Centersunder 1 mile · Operating
- Sabey Intergate.Columbia Building B · East Wenatchee · Sabey Data Centersunder 1 mile · Operating
- Microsoft East Wenatchee Data Center · East Wenatchee · Microsoftunder 1 mile · Operating · 180 MW
- Bitdeer Wenatchee (Pangborn) Data Center · East Wenatchee · Bitdeerunder 1 mile · Under construction · 13 MW
- Giga Watt Mining Facility (former) · East Wenatchee · Giga Watt Inc.under 1 mile · Cancelled
- Salcido Pangborn Data Center · East Wenatchee · Salcido Enterprises, LLCunder 1 mile · Operating · 10 MW
- Actapio East Wenatchee Data Center · East Wenatchee · Actapio, Inc.1 mi · Operating
- Salcido Columbia Data Center · Wenatchee · Salcido Enterprises, LLC6 mi · Operating
Questions people ask about this site
Is there opposition to the Sabey Intergate.Columbia Building D data center in East Wenatchee?
Nothing on record as of September 17, 2026. No lawsuit, organized opposition, or contested hearing over Sabey Intergate.Columbia Building D in East Wenatchee, Douglas County, Washington appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Sabey Intergate.Columbia Building D data center?
No lawsuit over Sabey Intergate.Columbia Building D appears in the record we track as of September 17, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Sabey Intergate.Columbia Building D use?
No water withdrawal figure for Sabey Intergate.Columbia Building D is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Sabey Intergate.Columbia Building D, and how big is it?
Sabey Data Centers is the operator on record. We hold 15 sites for that company across the registry. No capacity figure is on record for this site.
How to cite this page
SueDataCenters.org Data Center Registry, "Sabey Intergate.Columbia Building D," updated September 17, 2026, https://suedatacenters.org/data-centers/sabey-intergate-columbia-building-d-wa.
Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/sabey-intergate-columbia-building-d-wa, retrieved October 1, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.SDC Columbia, 4405 Grant Rd, East Wenatchee - 'Three buildings currently operational; a fourth under construction' · Sabey Data Centers · retrieved September 17, 2026
- 2.OSM way 1071774674 - 'Intergate Columbia D', building=industrial, telecom=data_center, operator=Sabey Data Centers · OpenStreetMap contributors · retrieved September 17, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us