Data Center Registry
Cipher Stingray HPC Data Center
Andrews, Andrews County, Texas · All 10 Cipher Digital sites
Cipher Stingray HPC Data Center is a data center under construction in Andrews, Texas (Andrews County), operated by Cipher Digital. The public record puts it at announced November 2024, 100 MW planned, 250 acres.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Under construction
- Operator
- Cipher Digital
- Facility type
- Data center
- Location
- Andrews, Andrews County, TX
- Coordinates
- 32.3187, -102.5457 (approximate)
- Power capacity
- 100 MW planned
- Land
- 250 acres
- Investment
- Not established from a public source
- Announced
- November 2024
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- July 17, 2026Under constructionStatus change recorded. Source: U.S. SEC (EDGAR)
Opposition and litigation at this site
Nothing on record as of July 25, 2026. No lawsuit, organized opposition, or contested hearing over Cipher Stingray HPC Data Center in Andrews, Andrews County, Texas appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
Cipher's Stingray HPC/AI data center site, ~250 acres in Andrews County, Texas (west of the city of Andrews). Conditional ERCOT interconnection approval up to 100 MW; targeted energization H1/Q2 2026. Part of Cipher's ~3.4 GW / 8-site HPC pipeline. Cipher rebranded from Cipher Mining to Cipher Digital during its pivot to hyperscale HPC/AI hosting. Coordinates approximate (Andrews, TX geocode; exact parcel not confirmed). Cipher Mining was renamed Cipher Digital.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- How the community has received it
- Which utility serves it
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Bear Bitcoin Mine · Andrews · WindHQ LLC / Canaan Inc.5 mi · Operating · 40 MW
- Chief Mountain Bitcoin Mine · Andrews · WindHQ LLC / Canaan Inc.5 mi · Operating · 40 MW
Questions people ask about this site
Is there opposition to the Cipher Stingray HPC Data Center in Andrews?
Nothing on record as of July 25, 2026. No lawsuit, organized opposition, or contested hearing over Cipher Stingray HPC Data Center in Andrews, Andrews County, Texas appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Cipher Stingray HPC Data Center?
No lawsuit over Cipher Stingray HPC Data Center appears in the record we track as of July 25, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Cipher Stingray HPC Data Center use?
No water withdrawal figure for Cipher Stingray HPC Data Center is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Cipher Stingray HPC Data Center, and how big is it?
Cipher Digital is the operator on record. We hold 10 sites for that company across the registry. Capacity on record is 100 MW. The site is recorded at 250 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "Cipher Stingray HPC Data Center," updated July 25, 2026, https://suedatacenters.org/data-centers/cipher-stingray-andrews-county-tx.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/cipher-stingray-andrews-county-tx, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Cipher Digital (Cipher Mining) FY2025 Form 10-K (filed 2026-02-24), Stingray Site, West Texas, conditional ERCOT interconnection up to 100 MW, energize H1 2026 · U.S. SEC (EDGAR) · retrieved July 17, 2026
- 2.DCD, Cipher acquires Stingray, 250 acres in Andrews County (west of Andrews), 100 MW front-of-the-meter, energize Q2 2026 · Data Center Dynamics · retrieved July 17, 2026
- 3.Cipher Mining, Announces Acquisition of New Site in West Texas (GlobeNewswire, Nov 26, 2024) · retrieved July 25, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us