Sue Data Centers

Data Center Registry

Liberty Road Data Center Campus (EdgeConneX)

Villa Rica, Douglas County, Georgia · All 16 EdgeConneX sites · Every EdgeConneX case on our tracker

CancelledOpposedRecord updated September 10, 2026

Liberty Road Data Center Campus (EdgeConneX) is a cancelled data center in Villa Rica, Georgia (Douglas County), operated by EdgeConneX (applicant East Village Dothan LLC). The public record puts it at 700 acres. It faces documented, organized local opposition.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Cancelled

Operator
EdgeConneX (applicant East Village Dothan LLC)
Facility type
Data center
Location
Villa Rica, Douglas County, GA
Coordinates
33.7315, -84.9001 (approximate)
Power capacity
Not established from a public source
Land
700 acres
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Not established from a public source
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
Opposed
Source confidence
Reported by at least one credible outlet or filing

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. July 8, 2026
    Cancelled
    The Douglas County Commission voted 4-1 to deny the rezoning for a six-building, 4.4 million sq ft campus on roughly 700 acres near Liberty Road and I-20, the second denial for the property in seven months. Source: Douglas County Sentinel

Opposition and litigation at this site

Yes. Organized local opposition to Liberty Road Data Center Campus (EdgeConneX) in Villa Rica, Douglas County, Georgia is documented in the public record, without a lawsuit on file in the sources we track. The announced project size drew audible jeers from a packed Citizens Hall; residents cited continuous noise and the site's position in the Dog River Basin, which feeds the county's main drinking-water reservoir.

How the community has taken it

Reception is a sourced signal, not an editorial judgment: opposed means documented, organized local opposition is the dominant signal on record.

The announced project size drew audible jeers from a packed Citizens Hall; residents cited continuous noise and the site's position in the Dog River Basin, which feeds the county's main drinking-water reservoir. The county's Planning and Zoning Commission recommended denial unanimously.

Source: Douglas County Sentinel

Notes on the record

130 of the 700 acres would have held the campus, with 570+ acres kept as green space; the site borders Clinton Nature Preserve and sits partly inside Villa Rica city limits. Developer representatives estimated about $50 million in new tax revenue and 200-300 permanent jobs; those are proponent projections for a denied application and are not recorded as facility fields. Coordinates are approximate to Liberty Road.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Power capacity in megawatts
  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Which utility serves it
Which document closes each gap
Power capacity in megawatts
The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Questions people ask about this site

Is there opposition to the Liberty Road Data Center Campus (EdgeConneX) in Villa Rica?

Yes. Organized local opposition to Liberty Road Data Center Campus (EdgeConneX) in Villa Rica, Douglas County, Georgia is documented in the public record, without a lawsuit on file in the sources we track. The announced project size drew audible jeers from a packed Citizens Hall; residents cited continuous noise and the site's position in the Dog River Basin, which feeds the county's main drinking-water reservoir.

Has anyone filed a lawsuit over the Liberty Road Data Center Campus (EdgeConneX)?

No lawsuit over Liberty Road Data Center Campus (EdgeConneX) appears in the record we track as of September 10, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Liberty Road Data Center Campus (EdgeConneX) use?

No water withdrawal figure for Liberty Road Data Center Campus (EdgeConneX) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates Liberty Road Data Center Campus (EdgeConneX), and how big is it?

EdgeConneX (applicant East Village Dothan LLC) is the operator on record. We hold 16 sites for that company across the registry. No capacity figure is on record for this site. The site is recorded at 700 acres.

How to cite this page

SueDataCenters.org Data Center Registry, "Liberty Road Data Center Campus (EdgeConneX)," updated September 10, 2026, https://suedatacenters.org/data-centers/edgeconnex-liberty-road-douglas-county-ga.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/edgeconnex-liberty-road-douglas-county-ga, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.County rejects plans for 700-acre data center campus · Douglas County Sentinel · retrieved September 10, 2026
  2. 2.Douglas County leaders just killed a massive data center project · FOX 5 Atlanta · retrieved September 10, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.