Smithfield Gateway Data Center is a proposed data center in East Stroudsburg, Pennsylvania (Monroe County), operated by DEPG Mosier Associates LP / DEPG of Shawnee II LP.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Proposed
- Operator
- DEPG Mosier Associates LP / DEPG of Shawnee II LP
- Facility type
- Data center
- Location
- East Stroudsburg, Monroe County, PA
- Coordinates
- 41.0206, -75.1778 (approximate)
- Power capacity
- Not established from a public source
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- September 21, 2026ProposedConditional-use application for a single two-story 250,000 sq ft data center building filed with Smithfield Township on parcels 16.8.2.7 and 16.8.2.7-2 within the Smithfield Gateway development; engineer responses and resubmission documents on file, hearing dates pending. Source: Smithfield Township, Monroe County
Opposition and litigation at this site
Nothing on record as of September 25, 2026. No lawsuit, organized opposition, or contested hearing over Smithfield Gateway Data Center in East Stroudsburg, Monroe County, Pennsylvania appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
The conditional-use application describes a single two-story 250,000 sq ft building; a related sketch plan for Phases 1B/2A/2B shows two data center structures of 125,000 sq ft footprint each plus a power substation. Acreage and capacity (MW) are not stated in the township filing. Coordinates are a geocoded point on Route 209 (Milford Road) near the Smithfield Gateway development, not a parcel-confirmed footprint.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Slate Belt Holdings Data Center Campus (Upper Mount Bethel) · Upper Mount Bethel Township · Slate Belt Holdings LLC (Talen Energy / River Pointe Logistics joint venture)9 mi · Proposed
- Andover HPC Data Center (former Newton Airport Site) · Andover · Andover HPC Development23 mi · Proposed · Contested
- Caughbaugh Road Data Center (Pennsylvania Glacial Till site) · Pennsylvania Glacial Till LLC24 mi · Proposed · In litigation
- Gouldsboro Data Center Campus (Project Gold) · Clifton Township · 1778 Rich Pike LLC25 mi · Proposed · 1.5 GW · In litigation
- Prologis Allen Township Data Center (2500 Liberty Drive) · Allen Township · Prologis27 mi · Permitted
Questions people ask about this site
Is there opposition to the Smithfield Gateway Data Center in East Stroudsburg?
Nothing on record as of September 25, 2026. No lawsuit, organized opposition, or contested hearing over Smithfield Gateway Data Center in East Stroudsburg, Monroe County, Pennsylvania appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Smithfield Gateway Data Center?
No lawsuit over Smithfield Gateway Data Center appears in the record we track as of September 25, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Smithfield Gateway Data Center use?
No water withdrawal figure for Smithfield Gateway Data Center is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Smithfield Gateway Data Center, and how big is it?
DEPG Mosier Associates LP / DEPG of Shawnee II LP is the operator on record. No capacity figure is on record for this site.
How to cite this page
SueDataCenters.org Data Center Registry, "Smithfield Gateway Data Center," updated September 25, 2026, https://suedatacenters.org/data-centers/depg-smithfield-gateway-data-center-monroe-pa.
Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/depg-smithfield-gateway-data-center-monroe-pa, retrieved October 1, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Smithfield Gateway Data Center, Conditional Use (township application page) · Smithfield Township, Monroe County · retrieved September 25, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us