Data Center Registry
CyrusOne OCB1 Council Bluffs Data Center
Council Bluffs, Pottawattamie County, Iowa · All 24 CyrusOne sites · Every CyrusOne case on our tracker
CyrusOne OCB1 Council Bluffs Data Center is an operating data center in Council Bluffs, Iowa (Pottawattamie County), operated by CyrusOne.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- CyrusOne
- Facility type
- Data center
- Location
- 4700 Gifford Road, Council Bluffs, Pottawattamie County, IA, 51501
- Coordinates
- 41.2122, -95.8780
- Power capacity
- Not established from a public source
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Confirmed by multiple independent sources or official documentation
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- 2020OperatingFirst phase ready for occupancy in 2020. Source: Baxtel
Opposition and litigation at this site
Nothing on record as of September 4, 2026. No lawsuit, organized opposition, or contested hearing over CyrusOne OCB1 Council Bluffs Data Center in Council Bluffs, Pottawattamie County, Iowa appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
Purpose-built colocation facility with 420,000 sq ft of technical space including 120,000 sq ft of raised floor, cooled by an air-cooled chiller plant (four 500-ton chillers with CRAH units per data hall) with free cooling below 30°F. Certified to ISO/IEC 27001, PCI DSS, HIPAA/HITECH, FISMA-High, SSAE 18 Type 2, SOC 2, HITRUST, FFIEC and CSA STAR, and designed to TIA 942 Class 4. Published power figures conflict, the operator's page cites 9 MW of total IT capacity while a directory lists 18 MW of utility capacity with 6 MW of UPS, so no capacity value is recorded.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Our reporting on this site
- Ames, Iowa Has Not Decided Yet. A Data Center Is Proposed on City Land, and Residents Can Still Apply to the Committee That Advises the Vote. · Dispute, no suit filed
- Salix, Iowa · Active litigation
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- 1623 Farnam · Omaha · 1623 Farnam4 mi · Operating · 8 MW
- First National Technology Solutions Omaha Data Center · Omaha · First National Technology Solutions5 mi · Operating
- TierPoint Omaha - Bellevue Data Center · Bellevue · TierPoint5 mi · Operating · 5.5 MW
- Google Council Bluffs Data Center · Council Bluffs · Google5 mi · Operating
- Edged Council Bluffs Data Center Campus (Project Lola) · Council Bluffs · Edged Energy6 mi · Under construction
- LightEdge Omaha Data Center · Papillion · LightEdge9 mi · Operating
- H5 Data Centers Omaha (La Vista) · La Vista · H5 Data Centers11 mi · Operating · 17.3 MW
- Google Papillion Data Center · Papillion · Google15 mi · Operating · Supported
Questions people ask about this site
Is there opposition to the CyrusOne OCB1 Council Bluffs Data Center in Council Bluffs?
Nothing on record as of September 4, 2026. No lawsuit, organized opposition, or contested hearing over CyrusOne OCB1 Council Bluffs Data Center in Council Bluffs, Pottawattamie County, Iowa appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the CyrusOne OCB1 Council Bluffs Data Center?
No lawsuit over CyrusOne OCB1 Council Bluffs Data Center appears in the record we track as of September 4, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does CyrusOne OCB1 Council Bluffs Data Center use?
No water withdrawal figure for CyrusOne OCB1 Council Bluffs Data Center is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates CyrusOne OCB1 Council Bluffs Data Center, and how big is it?
CyrusOne is the operator on record. We hold 24 sites for that company across the registry. No capacity figure is on record for this site.
How to cite this page
SueDataCenters.org Data Center Registry, "CyrusOne OCB1 Council Bluffs Data Center," updated September 4, 2026, https://suedatacenters.org/data-centers/cyrusone-ocb1-council-bluffs-ia.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/cyrusone-ocb1-council-bluffs-ia, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Council Bluffs, IA: OCB1, facility specifications · CyrusOne · retrieved September 4, 2026
- 2.CyrusOne Council Bluffs Data Center · Baxtel · retrieved September 4, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us