CyrusOne OCB1 Council Bluffs Data Center

Council Bluffs, Pottawattamie County, Iowa · All 35 CyrusOne sites · Every CyrusOne case on our tracker

OperatingNo reception on recordRecord updated October 28, 2026

CyrusOne OCB1 Council Bluffs Data Center is an operating data center in Council Bluffs, Iowa (Pottawattamie County), operated by CyrusOne. The public record puts it at 9 MW operating.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Operating

Operator
CyrusOne
Facility type
Data center
Location
4700 Gifford Road, Council Bluffs, Pottawattamie County, IA, 51501
Coordinates
41.2122, -95.8780
Power capacity
9 MW operating
Land
Not established from a public source
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Not established from a public source
Cooling
Closed loop
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Confirmed by multiple independent sources or official documentation

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. 2020
    Operating
    First phase ready for occupancy in 2020. Source: Baxtel

Opposition and litigation at this site

Nothing on record as of October 28, 2026. No lawsuit, organized opposition, or contested hearing over CyrusOne OCB1 Council Bluffs Data Center in Council Bluffs, Pottawattamie County, Iowa appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

Notes on the record

Purpose-built colocation facility. The operator's page describes a 216,000 sq ft data center with 120,000 sq ft of raised floor and, separately, lists 420,000 sq ft of technical IT space; the two area figures are not reconciled. The operator's page lists four 500-ton chillers with CRAH units in each data hall and free cooling below 30°F, and markets the design as "Water-Free Cooling". CRAH units are chilled-water air handlers, so under the methodology's tie-breaker the cooling is recorded as closed-loop even though the chillers reject heat to air. Certified to ISO/IEC 27001, PCI DSS, HIPAA/HITECH, FISMA-High, SSAE 18 Type 2, SOC 2, HITRUST, FFIEC and CSA STAR, and designed to TIA 942 Class 4. The operator's page cites 9 MW of total IT capacity, which is the recorded capacity. A directory lists 18 MW of utility capacity with 6 MW of UPS; those are labelled as utility and UPS capacity rather than IT capacity and are not recorded as capacity.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
  • Which utility serves it
Which document closes each gap
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Our reporting on this site

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Tell us about your situation

Living near CyrusOne OCB1 Council Bluffs Data Center?

Tell us the basics. Where a participating attorney in your state is available, we may share your information with them with your consent. Free, no obligation, and no guarantee anyone will contact you.

Questions people ask about this site

Is there opposition to the CyrusOne OCB1 Council Bluffs Data Center in Council Bluffs?

Nothing on record as of October 28, 2026. No lawsuit, organized opposition, or contested hearing over CyrusOne OCB1 Council Bluffs Data Center in Council Bluffs, Pottawattamie County, Iowa appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the CyrusOne OCB1 Council Bluffs Data Center?

No lawsuit over CyrusOne OCB1 Council Bluffs Data Center appears in the record we track as of October 28, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does CyrusOne OCB1 Council Bluffs Data Center use?

No water withdrawal figure for CyrusOne OCB1 Council Bluffs Data Center is on record here. Cooling is recorded as closed_loop, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.

Who operates CyrusOne OCB1 Council Bluffs Data Center, and how big is it?

CyrusOne is the operator on record. We hold 35 sites for that company across the registry. Capacity on record is 9 MW.

How to cite this page

SueDataCenters.org Data Center Registry, "CyrusOne OCB1 Council Bluffs Data Center," updated October 28, 2026, https://suedatacenters.org/data-centers/cyrusone-ocb1-council-bluffs-ia.

Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/cyrusone-ocb1-council-bluffs-ia, retrieved October 29, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Council Bluffs, IA: OCB1, facility specifications · CyrusOne · retrieved September 21, 2026
  2. 2.CyrusOne Council Bluffs Data Center · Baxtel · retrieved September 4, 2026

Is a data center disrupting your home?

Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.

  • Tell us about your situation
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us