Data Center Registry
Oakland University Campus Computing Facility
Auburn Hills, Oakland County, Michigan
Oakland University Campus Computing Facility is a proposed data center in Auburn Hills, Michigan (Oakland County), operated by Fairmount Properties (with Oakland University). The public record puts it at 26 MW planned. It has documented support and documented opposition on record.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Proposed
- Operator
- Fairmount Properties (with Oakland University)
- Facility type
- Data center
- Location
- Auburn Hills, Oakland County, MI
- Coordinates
- 42.6750, -83.2150 (approximate)
- Power capacity
- 26 MW planned
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- DTE Energy
- Power source
- Grid
- Cooling
- Not established
- Water use
- Not established from a public source
- Jobs
- 30 permanent
- Public subsidy
- Not established from a public source
- Community reception
- Mixed reception
- Source confidence
- Confirmed by multiple independent sources or official documentation
Opposition and litigation at this site
Partly. Both documented support and documented opposition to Oakland University Campus Computing Facility in Auburn Hills, Oakland County, Michigan appear in the record, with no clear majority position. Trustees approved 7-0-1, but some faculty and students remain opposed over environmental impact and the adjacent Native American heritage site.
How the community has taken it
Reception is a sourced signal, not an editorial judgment: mixed reception means documented support and documented opposition both exist with no clear majority position on record.
Trustees approved 7-0-1, but some faculty and students remain opposed over environmental impact and the adjacent Native American heritage site.
Power and water
Planned to draw on existing, unutilized capacity at the on-campus DTE substation.
University states a cooling system that minimizes water consumption, with use anticipated to be comparable to a standard campus office building; the technology is not named.
Notes on the record
Proposed shared university/industry colocation facility on OU's campus (Auburn Hills/Rochester border); site shifted from Parking Lot 35 to Parking Lot 37 to increase distance from a campus hall, a nature preserve, and a Native American heritage site. Cleveland-based Fairmount Properties funds construction, operations, and eventual decommissioning; OU pays nothing and gains an 8x expansion of its own computing capacity. Board of Trustees voted 7-0-1 to proceed into due diligence, design, and construction phases (June 2026); published timeline has due diligence running Oct 2026-June 2027, design July 2027-Fall 2028. Coordinates are an approximate campus-area estimate, not parcel-geocoded. Status re-check, NO change: the only 2026 milestone on the university's own timeline is a Board of Trustees authorization to proceed into due diligence and design (June 2026, already before the record's 2026-08-08 basis). A governing-board authorization is not a municipal permit and no construction start is claimed, so the record stays 'proposed'.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Tax abatements or other public subsidy
- Land area
Which document closes each gap
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- 123NET Southfield DC1 · Southfield · 123NET14 mi · Operating · 4 MW
- 123NET Southfield DC2 (Southfield Data Center NW) · Southfield · 123NET14 mi · Operating
- 123NET Southfield DC3 (Southfield Data Center W) · Southfield · 123NET14 mi · Operating
- 365 Data Centers Detroit (DT1) · Southfield · 365 Data Centers14 mi · Operating
- Metrobloks Southfield Data Center · Southfield · Metrobloks14 mi · Permitted · 100 MW · Contested
- Washington Township Technical Campus · Washington · Prologis15 mi · Cancelled · Opposed
- EdgeConneX DET01 · Detroit (Oakland County) · EdgeConneX16 mi · Operating
- Wixom Road Data Center Campus · Wixom · Wixom Industrial One / Sansone Group20 mi · Proposed · Opposed
Questions people ask about this site
Is there opposition to the Oakland University Campus Computing Facility in Auburn Hills?
Partly. Both documented support and documented opposition to Oakland University Campus Computing Facility in Auburn Hills, Oakland County, Michigan appear in the record, with no clear majority position. Trustees approved 7-0-1, but some faculty and students remain opposed over environmental impact and the adjacent Native American heritage site.
Has anyone filed a lawsuit over the Oakland University Campus Computing Facility?
No lawsuit over Oakland University Campus Computing Facility appears in the record we track as of September 9, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Oakland University Campus Computing Facility use?
No water withdrawal figure for Oakland University Campus Computing Facility is on record here. Cooling is recorded as unknown, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.
Who operates Oakland University Campus Computing Facility, and how big is it?
Fairmount Properties (with Oakland University) is the operator on record. Capacity on record is 26 MW.
How to cite this page
SueDataCenters.org Data Center Registry, "Oakland University Campus Computing Facility," updated September 9, 2026, https://suedatacenters.org/data-centers/oakland-university-computing-auburn-hills-mi.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/oakland-university-computing-auburn-hills-mi, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Data Infrastructure Project - Oakland University · Oakland University · retrieved August 8, 2026
- 2.Oakland University, Data Infrastructure Project · Oakland University · retrieved September 9, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us